| 1 | Construction of embankment with approved material obtained from borrow pit with all lifts upto 1.5m transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.1 and 300.2 with lead upto 1000 m as per technical Specification Clause 301.5 (MORD 3.04) |
| 2 | Earth work in excavation in trench for foundation in ordinary soil i/c lift upto 1.50 mtr. & lead upto 50.00 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed bu the E/I within a distance of 50 m. (as per SI No. 251) |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 6 | Providing and applying primer coat with emulsion (SS2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 (Including Emlusion) |
| 7 | Providing and applying tack coat with Bitumen (VG-10) using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. (Including Bitumen) |
| 8 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A as per Technical Specification Clause 508 (Including Emlusion) |
| 9 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510 (Including Emlusion) |
| 10 | Brick edging 7 cm wide on both sides of the road With Staraight over burnt bricks complete as per PWD specification no. 20.15 |
| 11 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pit with all lifts and leads. transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per technical Specification Clause 303.1 (MORD 3.14) |
| 12 | Hume Pipe WorkP/L of Cement concrete 1:4:8 (cement, fine sand, 40mm brick ballast) in foundation as per SI no. 275 |
| 13 | P/L of filter media of 25 mm gauge class-150 brick ballast below hume pipe |
| 14 | Class-150m brick work with 1:3 cement and coarse sand mortar in foundation, parapet of culvert as per SI no. 307 |
| 15 | Struck pointing with 1:2 cement sand mortar as per SI no. 574 |
| 16 | Cement plaster 12mm thick 1:4 Cement and fine sand of 1.25fm as per SI no. 584 |
| 17 | P/L of 350mm dia RCC NP-3 hume pipe in position(3 No. x 2.50 Mt = 7.50 Mt) |
| 18 | P/L of 600mm dia RCC NP-3 hume pipe in position(3 No. x 2.50 Mt = 7.50 Mt) |
| 19 | P/L of 900mm dia RCC NP-3 hume pipe in position(3 No. x 2.50 Mt = 7.50 Mt) |
| 20 | The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.00% (PC) |
| 21 | 2nd year maintenance cost @ 0.75% (PC) |
| 22 | 3rd year maintenance cost @ 1.50 % (PC) |
| 23 | 4th year maintenance cost @ 2.25% (PC) |
| 24 | 5th year maintenance cost @ 3.00% (PC) Please Enable Macros to View BoQ information |