|
| 1 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the Engineer-in-Charge. Excluding GST |
| 2 | Providing, laying and spreading Material on a prepared sub grade, adding cement (OPC) @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base.Excluding GST |
| 3 | Providing, laying and spreading Material on a prepared sub grade, adding cement(OPC) @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. Excluding GST |
| 4 | Providing and applying tack coat with Bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. excluding GST. |
| 5 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.Excluding GST |
| 6 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Excluding GST |
| 7 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches.Excluding GST |
| 8 | Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. Excluding GST |
| 9 | Providing and laying of 40 mm gauge B/B under Hume pipe culvert foundation & road work including all materials, labour and T&P etc. required for completion of work. Excluding GST |
| 10 | Class-150 (Non Modular) brick work in 1:3 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. Excluding GST |
| 11 | Pointing on brick work on eadge floor with cement mortar 1:2 (1cement :2 Fine sand) Excluding GST |
| 12 | 12mm Cement plaster with cement mortar in proportion of 1:3 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth. Excluding GST |
| 13 | Laying and fixing of N.P.-3 Hume pipe in proper position as directed by E/I including cartage of pipes/collars upto 30m distance excluding cost of pipes/collars. 350mm Excluding GST |
| 14 | Laying and fixing of N.P.-3 Hume pipe in proper position as directed by E/I including cartage of pipes/collars upto 30m distance excluding cost of pipes/collars. 600mm Excluding GST 1- Cost of Maintenance of Road for Five Years will be paid as per E.N.C. Letter no.- 3689 सी0-PRMC/मूल-23-24 Dt. 17.02.2024)2-Maintenance cost includes All material, bitumen, labour and T&P etc.3-Payment of Maintenance shall be made as per final execution of civil work which may vary from the BOQ.4-Bidder Shall quote Rate Including all taxes but excluding GST. Please Enable Macros to View BoQ information |