|
| 1 | A : Trimming of grass, shurbs and weeds from the shoulders/berms and disposing off the same to suitable locations etc. complete |
| 2 | B : Trimming of grass, shurbs and weeds from the shoulders/berms and disposing off the same to suitable locations etc. complete |
| 3 | A : Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m.and spreading for embankment or stacking as directed. |
| 4 | A : Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff asdirected all sorts of soils. |
| 5 | A : Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders/Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken). |
| 6 | B : Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders/Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken). |
| 7 | A : Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders/Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken). |
| 8 | A : Supplying hard murum/ kankar at the road site, including conveying and stacking complete. |
| 9 | B : Supplying hard murum/ kankar at the road site, including conveying and stacking complete. |
| 10 | A : Supplying soft murum at the road site, including conveying and stacking complete. |
| 11 | B : Supplying soft murum at the road site, including conveying and stacking complete. |
| 12 | A : Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . |
| 13 | B : Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge |
| 14 | A ; Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed. |
| 15 | A: Spreading hard murum/ soft murrum/ gravel or kankar for side width complete |
| 16 | B : Spreading hard murum/ soft murrum/ gravel or kankar for side width complete |
| 17 | A : Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificialwatering complete. |
| 18 | A : Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificialwatering complete. |
| 19 | B : Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificialwatering complete. |
| 20 | A : Compacting the hard murum side widths including laying in layers on each side withvibratory roller including artificial watering etc. complete. |
| 21 | B : Compacting the hard murum side widths including laying in layers on each side withvibratory roller including artificial watering etc. complete. |
| 22 | A : Providing and constructing 75 mm. thick Modified Penetraction Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of specified grade @ 2Kilogram/ Square Metre , spreading 12mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of specified grade of bitumen at the rate of 0.30KilogramSquare Metre. on existing bitumen surface. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 23 | B : Providing and constructing 75 mm. thick Modified Penetraction Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of specified grade @ 2Kilogram/ Square Metre , spreading 12mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of specified grade of bitumen at the rate of 0.30KilogramSquare Metre. on existing bitumen surface. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 24 | A : Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry / Hungry B.T. surface 3 Kilogram/10 Square Metre. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 25 | B : Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry / Hungry B.T. surface 3 Kilogram/10 Square Metre. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 26 | A : Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 27 | B : Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 28 | A : Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KilogramSquare Metre. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 29 | B: Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KilogramSquare Metre. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 30 | A : Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 600mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 andcuring etc. complete. |
| 31 | B : Providing and laying Cast in situ/Ready Mix cement concrete in M20 of trap/ granite/quartzite/gneiss metal for bed blocks, foundation blocks and such other items including bailing out water, Steel centering, formwork, laying/ pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.), with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) |
| 32 | A :Fixing in position Road Junction/ Informatory Sign Board in ground with C.C.1:4:8 block of 60cm x 60cm x 75cm size including all leads complete. |
| 33 | B : Fixing in position Road Junction/ Informatory Sign Board in ground with C.C.1:4:8 block of 60cm x 60cm x 75cm size including all leads complete. |
| 34 | A : ROYALTY FOR SAND |
| 35 | B : ROYALTY FOR SAND |
| 36 | A : BITUMENE- PENETR., SOFTNING,Flash&fire |
| 37 | B : BITUMENE- PENETR., SOFTNING,Flash&fire |
| 38 | B : CONCRETE:- [1] Compressive strength of C.C.Cube (Set of 3 cubes) |
| 39 | A: ADD 18 % GST |
| 40 | B : ADD 18 % GST |
| 41 | A: ADD 1% LABOUR INSURANCE |
| 42 | B : ADD 1% LABOUR INSURANCE Please Enable Macros to View BoQ information |