| 1 | M & R to WSS in Wai Industrial Area – Construction of Gabion Wall and Repairs to Compound Wall at Menavali Jackwell |
| 2 | Excavation for road way in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts up to a lead of 50 m.and spreading for embankment or stacking as directed. |
| 3 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. |
| 4 | Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss metal for foundation and bedding / steps including steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.),with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) |
| 5 | Providing and constructing gabain structures for erosion control, river training works and protection works with wire crates of size 2.0m x 1.0m x 0.30m each divided into 1 m compartments by-cross netting, made from 4 mm galvanized steel wire @ 32Kilogramper 10 One Square Metre having minimum tensile strength of 300Mpa conforming to IS:280 and galvanizing coating conforming to IS 4826, wovan into mesh with double twist, mesh size not exceeding 100 x 100mm, filled with boulders with least dimension of 200mm, all loose ends to be securely tied with 4mm galvanized steel wire etc. complete. |
| 6 | Laying of a geotextile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitching / cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching etc. complete. |
| 7 | Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources) |
| 8 | Providing dry rubble stone pitching 23 cm (about 9 ) thick including all material, quarry spalls, labour etc. complete. |
| 9 | Dismantling stone masonry in lime or cement mortar including stacking the materials as directed with all leads, lifts etc. |
| 10 | Providing uncoursed rubble masonry of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in foundation and plinth of inner walls / in plinth of external walls including bailing out water manually , striking joints on un exposed faces and watering etc.complete. |
| 11 | Providing flush grooved pointing with cement mortar 1:3 for stone masonry work including scaffolding and curing etc. complete. |
| 12 | Providing and erecting Y type barbed wire fencing with seven rows of wire with 2.45 mm dia G.I. pipe ( Rezan/ concentiDeleted ire 0.75 mm dia ) with hot dip and G.I. coated hooks as per drawing supported on M.S. angle 50 x 50 x 6 mm at 2.5 mtr. c/c including fixing and fastening with wire, painting M.S. angles with one coat of red lead primer and two coat of oil paint etc. complete. |
| 13 | Providing and fixing mild steel grill gate with angle iron frame 65mm x 65mm x 10mm with iron bars at 150mm C/C and diagonal flats as per the detailed drawing including hinges, pivot block locking arrangement, welding riveting and oil painting of three coats of approved shade Weight of gate 35 Kilogram/Smt. |
| 14 | Rebate for old gate |
| 15 | BASIC TEST OF CEMENT: Standard Consistancy, Fineness, Specific Gravity, Setting Time ( Initial &Final ), Compressive Strength, Soundness. |
| 16 | BASIC TEST OF AGGREGATE: Water Absorption, Specific Gravity,Impact Value, Crushing Value. |
| 17 | BASIC TEST OF AGGREGATE: Sieve Analysis. |
| 18 | FINE AGGREGATE: Fineness Modulus ( Sieve Analysis ),Silt & Clay Content |
| 19 | CONCRETE: Compressive Strength OF C.C. Cube (Set of 3 cubes). |
| 20 | MORTOR: Compressive Strength. ( Set of 3 Cubes) |
| 21 | STONE/ RUBBLE: CrushingValue/Compressive Strength, Water Absorption & Specific Gravity, |
| 22 | SOIL / MURUM: Liquid limit & plastic limit. |
| 23 | SOIL / MURUM: Compaction Test ( proctor density) |
| 24 | Soling stone |
| 25 | Quarry Spaul |
| 26 | Earth Please Enable Macros to View BoQ information |