| 1 | Providing 50 mm thick Full grout (for pothole filling), 50 mm thick DBM & 25 mm thick BC for the road in B block of Shalgaon-Bombalewadi Industrial Area. |
| 2 | Providing 50 mm thick Full grout bituminous treatment including supplying all materials , prepairing the exisisting road surface,applying tack coat @ 0.735 kg / sqm and laying the required thickness of metal layer, heating and spraying bitumen of specified Grade at the rate of 5.00 kg / sqm , spreading chips and laying seal coat of specified Grade of bitumen of 1.70 Kg/sqm and compacting , making the surface good etc. complete ( For only Patch Repair works / For Road work )(VG-30 bulk bitumen rates are considered to arrive at rates) |
| 3 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates) |
| 4 | DENSE BITUMINOUS MACADAM:--Providing and laying dense bituminous macadam using crushed aggregate of grading 1, premixed with bituminous binder Bitumen of specified grade,@ 4.50 % by weight of total mix and filler, transported at site with VTS, laid over a previously prepared surface , finished to the required grade ,level, alignment,and rolling to achieve the desired density for 50 mm compacted thickness with drum mix type hot mix plant without SCADA having complying essential features of Hot mix plant as per IRC-27-2009 specified conditions and attachments such as electronic load sensor based belt conveyers, automatic synchronization of bitumen and aggregate fedder,built in dust controller system and PLC for Drum Mix plant ,Sensor paver, and Vibratory roller excluding prime/Tack coat etc. complete --Bitumen VG-30 grade with stone dust filler (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 5 | BITUMINOUS CONCRETE:--Providing and laying bituminous concrete using crushed aggregate of grading 1, premixed with bituminous binder @5.40% by weight of total mix and filler, transported at site with VTS, laid over a previously prepared surface, finished to the required grade ,level, alignment, and rolling to achieve the desired density for 25 mm compacted thickness with drum mix plant without SCADA, Sensor paver and Vibratory roller excluding prime/Tack coat etc. complete --Bitumen of specified grade with stone dust filler. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 6 | Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources) |
| 7 | Royalty Charges |
| 8 | Royalty charges for various building construction bonafied materials which are used for government bonafied works and for which Royalty charges are to be paid by the contractor. (This Item is to be paid to the contractor only after he pays the Royalty amount to Revenue department and produces the required voucher.) |
| 9 | Lab Testing Charges |
| 10 | Lab testing charges (Items No. 1 to Item No. 18 as per Schedule B in Tender document) Please Enable Macros to View BoQ information |