| 1 | Labour for cleaning the work site before and after work etc. |
| 2 | Earth work in Excavation in foundation trenches in ordinary soil (vide classification of soil item A ) and disposal of excavated earth as obtained to a distance up to 50 mm including all lifts, leveling, ramming the foundation trenches removing roots of trees, all complete as per approved design , building as per specification & direction of E/I. |
| 3 | Stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve at Quary |
| 4 | Supplying and laying (properly as per design and drawing) rip-rap with good quality of Boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. |
| 5 | Reinforced cement concrete work in walls (any Thickness), including attached pilasters, buttresses, abutments, posts and structs etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) |
| 6 | Reinforced cement concrete work in beams, suspended floors, foors having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five lvevel, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (Zone-III) : 3 graded stone aggregate 20mm nominal size). |
| 7 | 8mm Dia. |
| 8 | 10mm Dia. |
| 9 | Centering and Shuttering including strutting, propping etc and removal of from for Foundation , footing , bases of columns etc for mass concrete. |
| 10 | (i) Sand (Lead Upto 42 km) |
| 11 | (ii) Stone Dust (Lead 15 KM) |
| 12 | (iii) Stone Boulder (Lead 29 KM) |
| 13 | (iv) Stone Chips (Lead 15KM) |
| 14 | (v) Earth (Lead 01 KM) |
| 15 | Good & Service Tax (GST) |
| 16 | Labour Cess Please Enable Macros to View BoQ information |