| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 2 | Providing laying and spreading material on a prepared sub base grade, adding cement @ 2% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined Compressive strength and to form a layer of sub-base. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 3 | Providing, laying, spreading Material on prepared sub base, cement @ 4% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strengthe and to form a layer of base. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 4 | Providing and applying tack coat with VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer/Bituminous surface as per Technical Specification Clause 503. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 5 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 to required line, grade and level to serve as wearing course on a previously prepared base by manual means, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 (By Manual Means) Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 6 | Providing and laying Type \\"C\\" seal coat by manual means with VG-10 sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall as per Technical Specification Clause 510 ( By Manual Means) Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 7 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 8 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 9 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203(Cement Concrete 1:3:6) Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 10 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (M20 ) Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 11 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 12 | Brick masonry in 1:4 cement mortar in foundation of Head walls complete exculding pointing and plastering as per drawing and technical specification Clause 600,1202 & 1203. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 13 | Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause 613.3 & 1204. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 14 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row; Laying Reinforced cement concrete pipe NP3 pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 600mm dia. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 15 | Ist Year Maintainance (@0% of Total Work Amount of S.No. 1 to S.No.14) |
| 16 | IInd Year Maintainance (@0.75% of Total Work Amount of S.No. 1 to S.No.14) |
| 17 | IIIrd Year Maintainance (@1.5% of Total Work Amount of S.No. 1 to S.No.14) |
| 18 | IVth Year Maintainance (@2.25% of Total Work Amount of S.No. 1 to S.No.14) |
| 19 | Vth Year Maintainance (@3.0% of Total Work Amount of S.No. 1 to S.No.14) Please Enable Macros to View BoQ information |