| 1 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 2 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 3 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 4 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. |
| 5 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 6 | Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 7 | Renewal of existing damaged/old 11kV Strut with new PSC strut in place incl. excavation & backfilling pit and conveyance (except pole). |
| 8 | Renewal of existing damaged/old 11kV Fly stay with new Fly stay incl. renewal of PSC pole (used for fly stay) and refitting of all items and conveyance (except conveyance of pole). |
| 9 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 10 | Erecting 9M PSC Pole as Support pole for ABC Stringing work |
| 11 | Erecting A Type Pole as Support pole for ABC Stringing work |
| 12 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. |
| 13 | Fitting and providing one Strut using A type pole incl. digging & back filling pit. |
| 14 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. |
| 15 | Fitting and providing one HT Fly stay for 11kV pole using A type pole incl. digging & back filling pits. |
| 16 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Rock. |
| 17 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 18 | Additional rate for excavation of Pit for A type pole in Hard Laterite. |
| 19 | Additional rate for excavation of Pit for A type pole in Soft Rock. |
| 20 | Additional rate for excavation of Pit for A type pole in Rock. |
| 21 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 22 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 23 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 24 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 25 | Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint. |
| 26 | Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 27 | Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 28 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 29 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 30 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles |
| 31 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 32 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 33 | Additional rate for excavation of one Pit for Coil Earthing in Hard Laterite. |
| 34 | Additional rate for excavation of one Pit for Coil Earthing in Soft Rock. |
| 35 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. |
| 36 | Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock. |
| 37 | Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable |
| 38 | Doing straight joint on cables of sizes upto and incl. 3x185 sqmm using the cable jointing kit supplied departmentally as per specification. |
| 39 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm |
| 40 | Erection of suspension clamp for 11KV ABC of any size |
| 41 | Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking. Please Enable Macros to View BoQ information |