| 1 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 2 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 3 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 4 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 5 | Erection of suspension clamp for LT ABC of any size |
| 6 | Providing Cable Tie |
| 7 | Providing End Caps |
| 8 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 9 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 10 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 11 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 12 | Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole. |
| 13 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 14 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 15 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. |
| 16 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. |
| 17 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 18 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. |
| 19 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. |
| 20 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 21 | Installation of Pre-insulated lugs for 70sqmm |
| 22 | Installation of Pre-insulated lugs for 50sqmm |
| 23 | Installation of Pre-insulated lugs for 16sqmm |
| 24 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 25 | Additional rate for excavation of one Pit for Coil Earthing in Laterite |
| 26 | Additional rate for excavation of one Pit for Coil Earthing in Hard Laterite. |
| 27 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. |
| 28 | Providing Stay for LT poles incl. digging & back filling pit. |
| 29 | Renewal of existing damaged/broken old LT stay with existing stay rod. |
| 30 | Providing Strut using LT PSC pole incl. digging & back filling pit. |
| 31 | Providing Fly stay for LT pole using LT PSC pole incl. digging & back filling pit. |
| 32 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 33 | Erection of suspension clamp for 11KV ABC of any size |
| 34 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles |
| 35 | Fiting One no MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable |
| 36 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm |
| 37 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
| 38 | Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. |
| 39 | Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. |
| 40 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 41 | Erecting 9m PSC pole as support pole for ABC stringing work-New |
| 42 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 43 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 44 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 45 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 46 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 47 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. |
| 48 | Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint. |
| 49 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. |
| 50 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 51 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. |
| 52 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. |
| 53 | Errection and commissining of street light metering with timer |
| 54 | Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 55 | Fitting 5 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses. |
| 56 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 57 | Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 58 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
| 59 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line. |
| 60 | Erection of LT 3 way distribution box on existing cross arm giving connection incl. cable and earth connection (excluding earthing). |
| 61 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 62 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 63 | Fitting one additional HT pin with insulator |
| 64 | Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation |
| 65 | Providing yard metalling with 6mm & 40mm thick blue metal as specified after constructing a curb wall. |
| 66 | Additional rate for excavation of Pit for A type pole in Hard Laterite. |
| 67 | Erecting HT A-Type pole as support pole for ABC stringing work -New |
| 68 | Additional rate for excavation of Pit for A type pole in Laterite. |
| 69 | Insertion of one HT A type pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc. |
| 70 | Fitting one set AB switch and giving connection |
| 71 | Additional rate for excavation of Pit for A type pole in Soft Rock. |
| 72 | Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation. |
| 73 | Transporting Transformers by hired vehicle upto 5km and upto 2 No. of 63 to 250kVA Transformers / RMUs excluding loading & unloading. |
| 74 | Installing one DTR Meter with box on existing poles and giving the complete connections incl. conveyance of materials. Please Enable Macros to View BoQ information |