| 1 | SCHEDULE 'A' PART- I BUILDINGS & STRUCTURES INCLUDING INTERNAL & EXTERNAL SERVICES AS DEFINED IN ANNEXURE I TO XIV (EPC) |
| 2 | Design & Construction of Def Sailors Married Accn (G +10 Floors) for complete as detailed in scope of work and other documents of tender, complete all as specified and directed. |
| 3 | SCHEDULE 'A' PART I A (BUILDINGS & STRUCTURES WORKS) Total of Sch-'A' Part-I A B/F |
| 4 | SCHEDULE 'A' PART-II (SITE CLEARANCE, AREA DEVELOPMENT, EXCAVATION & EARTHWORK)Total of Sch-'A' Part-II B/F |
| 5 | SCHEDULE 'A' PART-III (DEMOLITION & DISMANTLING)Total of Sch-'A' Part-III B/F |
| 6 | SCHEDULE 'A' PART-IV (ROAD, HARD STANDING & CULVERT) Total of Sch-'A' Part-IV B/F |
| 7 | SCHEDULE 'A' PART-V (SEWAGE DISPOSAL)Total of Sch-'A' Part-V B/F |
| 8 | SCHEDULE 'A' PART-VI (AREA DRAINAGE)Total of Sch-'A' Part-VI B/F |
| 9 | SCHEDULE 'A' PART-VII (EXTERNAL ELECTRIFICATION) Total of Sch-'A' Part-VII B/F |
| 10 | SCHEDULE 'A' PART-VIII (EXTERNAL WATER SUPPLY)Total of Sch-'A' Part-VIII B/F |
| 11 | SCHEDULE 'A' PART-IX (ARBORICULTURE ) Total of Sch-'A' Part-X B/F |
| 12 | SCHEDULE 'A' PART- XI (MISCELLANEOUS ITEMS) |
| 13 | SITE CLERANCE, AREA DEVELOPMENT, EXCAVATION & EARTHWORK |
| 14 | Removing excavated material (any type) and depositing it outside Ministry of Defence Land.Notes:(i) Before quoting the tender, the bidders are advised to ascertain the distance outside MD and, at which the excavated material/ debris are to be disposed off. No extra claim what-so-ever shall be entertained on this account.(ii) This item shall be considered as per the requirement at site. |
| 15 | DEMOLITION /DISMANTLING |
| 16 | Removal Debris obtained from demolition of bldg outside MD land (i) Before quoting the tender, the bidders are advised to ascertain the distance outside MD and, at which the excavated material/ debris are to be disposed off. No extra claim what-so-ever shall be entertained on this account.(ii) This item shall be considered as per the requirement at site. |
| 17 | Cutting existing CI pipe 150 mm dia for branch connection of 80 mm dia GI pipe and insertion of tee 150x150x80 mm dia and connecting complete incl cutting extg pipe threading and minserting TEE and Nipple and Union of 80 MM dia incl all required excavation and earth work complete all as specified and directed |
| 18 | Construction of brick masonary valve chamber of size 0.9m x0.9m x 0.9 mtr (internal dimension ) above ground level 30 cm suitable for 100 mm dia sluice valve , 15 cm thick foundation using PCC 1:4:8 type D-2 ( using 40 mm graded stone aggregate ) over 15 cm thick hardcore, 23 cm thick brick wall , bults in cement and sand mortor 1:4 , 15 cm thick internal and external plaster including top of floor in cement and sand mortor 1:3,finished even and smooth , without using extra cement, 10 mm thick mild steel plate cover on 50 mm x 50mmx6 mm MS angle iron frame embeded in PCC 1:2:4 type B-1 ( using 20 mm graded stone aggregate ) coping having rectangular hinged opening of size with locking arrangement & handle made out of 25 cm dia MS round bar , hold fasts etc, applying one coats od red oxide primer and two coats of synthetic enemelled paint to all steel surfaces and earth work in any type of soil including disposal of surplus soil to a distance not exc. 50 mtr complete . |
| 19 | FURNITURE |
| 20 | Manufacture & Supply of Almirah Steel with shelves, complete all as specified and shown on drawing No. FD-1032. |
| 21 | Manufacture & Supply of Chair verandah (MAP), complete all as specified and shown on drawing No. FD/MAP-II/06 |
| 22 | Manufacture & Supply of Chair school with hand board, complete all as specified and shown on drawing No. FD/E6/MAP/05 |
| 23 | Manufacture & Supply of Chair dining cushioned (MAP) complete all as specified and shown on drawing No. FD/MAP-II/04. |
| 24 | Manufacture & Supply of Charpoy with Hard top, complete all as specified and shown on drawing No. FD/MAP-II/01. |
| 25 | Manufacture & Supply of Table dining( 120*90 cm) , complete all as specified and shown on drawing No. FD-273. |
| 26 | Manufacture & Supply of Peg Table, complete all as specified and shown on drawing No.FD-384. |
| 27 | Manufacture & Supply of Rach shoe steel (MAP), complete all as specified and shown on drawing No. FD/E6/MAP/02. |
| 28 | Manufacture & Supply of Table bed side, complete all as specified and shown on drawing No. FD/E6/MAP/15(R). |
| 29 | Manufacture & Supply of Table dressing gents, complete all as specified and shown on drawing No. FD/E6/MAP/16. |
| 30 | MANNING & OPERATION OF LIFTS (REFER ANNEXURE-XII) |
| 31 | M&L for Daily Maintenance, Manning & Operation 02 Nos lifts of capacity 16 Passangers-01 No & capacity 08 Passangers-01 No Suitable to serve G+10 Upper Floors Installed at-NSB Married Accmd POs & Below 40 DUs Building in two shifts (Each shift of 08 Hours) operated by one lift operator per shift on all days/ holidays and all type of weather /climatic conditions, providing rescue to the trapped person, maintaining the lift, connected equipments and accessories in serviceable condition including upkeeping lift room , surrounding area clean and tidy during the operation period, also Manning & Operation of Lift in case of failure of commercial supply by running of DG Set 125 KVA installed within the vicinity meant for lift supply.(TOTAL number of lift operators required per day are 02 nos.) |
| 32 | 11 months after completion of work |
| 33 | 11 months after completion of BoQ Sl. item No. 17.02 here-in-before |
| 34 | 11 months after completion of BoQ Sl. item No.17.03 here-in-before |
| 35 | 11 months after completion of BoQ Sl. item No. 17.04 here-in-before |
| 36 | 11 months after completion of BoQ Sl. item No. 17.05 here-in-before |
| 37 | 05 months after completion of BoQ Sl. item No. 17.06 here-in-before |
| 38 | ANNUAL COMPREHENSIVE MAINTENANCE OF LIFTS (REFER ANNEXURE-XIII) |
| 39 | Annual Comprehensive maintenance of Lifts (Qty-02) all as installed under subject work including repairs / replacement, periodic maintenance all as per OEM manual and repair / replacement of parts of lifts installed in the subject project as per schedules comprising of all devices and accessories throughout for a period as mentioned below including Sundays and holidays after expiry of defects liability period (DLP).Note Contractor shall carryout comprehensive maintenance (routine, daily, weakly. monthly, quarterly, half yearly, yearly) as per attached Performa and maintain all the lifts in serviceable condition 24 hrs x 365 days without any extra cost. ) Final bill shall be paid after certified completion of work for each WO seperatelyContractor to quote the rates for Annual Comprehensive maintenance of 02 Nos Lifts per Month |
| 40 | One year after expiry of defects liability period |
| 41 | One year after completion of BoQ Sl. item No. 18.02 here-in-before |
| 42 | One year after completion of BoQ Sl. item No. 18.03 here-in-before Please Enable Macros to View BoQ information |