|
| 1 | Construction of Embankment with approved Material Obtained from Borrow Pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 & Sr. No. 3.4 (Including labour cess but GST will be paid extra as applicable) |
| 2 | GSB-Granular Sub-base with Well Graded Material (Table 400.1) (A)By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. Sr.No. 4.1(A)(i) For Grading I Material. (Including labour cess but GST will be paid extra as applicable) |
| 3 | WBM Grade-II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. Sr.No. 4.7(2)(A) By Manual Means. (Including labour cess but GST will be paid extra as applicable) |
| 4 | WBM Grade-III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. Sr.No. 4.7(3) (A) By Manual Means. (Including labour cess but GST will be paid extra as applicable) |
| 5 | Brick edging on both sides of the road of first class bricks 8 cm (3\\") wide and 12 cm. 4½\\"deep laid with mud mortar including labour and supply of. bricks finished to required template and proper alignment and also including dressing and ramming the excavated earth as directed by Engineer -in-Charge. As per SOR No. 765. (Including labour cess but GST will be paid extra as applicable) |
| 6 | Primer Coat- Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 Sr.No. 5.1(i). (Including labour cess & Bitumen but GST will be paid extra as applicable) |
| 7 | Tack Coat- Providing and applying tack coat with bitumen VG- 10 grade using pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom. As per T.S.C. 503 & MORD SR N0-5.2(IV). (Including labour cess & Bitumen but GST will be paid extra as applicable) |
| 8 | Premix Carpet- Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm and 11.2 mm aggregates (Dala quarry) either using VG-10 grade bitumen to required line grade and level to serve as wearing coarse on a previously prepared base by manual means including mixing in a sutabule mixol laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. as per T.S.C. 508. & MORD SR N0-5.9 (Including labour cess & Bitumen but GST will be paid extra as applicable) |
| 9 | Seal Coat type C- Providing and laying seal coat by manual means with VG- 10 grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per T.S.C. 510 & MORD SR N0-5.12 (Including labour cess & Bitumen but GST will be paid extra as applicable) |
| 10 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 & Sr. No. 3.14 (Including labour cess & Bitumen but GST will be paid extra as applicable) |
| 11 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling, watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royalty). as per S.I. No 251 (Including labour cess but GST will be paid extra as applicable) |
| 12 | Concrete with 4cm(1½\\"). Gauge brick ballast, fine sand of 1.25 fineness modulous and cement in proportion of 8:4:1 in foundation and under floor, including supply of all materials, labour and T&P etc. required for proper completion of the work. as per S.I.No. 275 (Including labour cess but GST will be paid extra as applicable) |
| 13 | Brick masonry work in Cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specification clause 1202 and 1203 II. Brick masonery in 1:4 cement mortar S.No. 11.5 (ii) & Specification 600 & 1200 (Including labour cess but GST will be paid extra as applicable) |
| 14 | Prividing and laying RCC Hume Pipe NP-3 (900mm Dia) including Collars/spigot and Sockets type joints, confirming to BIS Specification as per S.I. 458:203 Chapter-1 Sr. No. 60(C) (Including labour cess but GST will be paid extra as applicable) |
| 15 | Prividing and laying RCC Hume Pipe NP-3 (600mm Dia) including Collars/spigot and Sockets type joints, confirming to BIS Specification as per S.I. 458:203 Chapter-1 Sr. No. 60(B) (Including labour cess but GST will be paid extra as applicable) |
| 16 | Supply and laying of Compacted 40mm gauge brick ballast arround and below hume pipe. As per SOR Material No. 2 (c) (Including labour cess but GST will be paid extra as applicable) |
| 17 | Struck pointing with cement mortar consisting of one part cement and 2 parts of fine sand of 1.25 F.M. on brick work including supply of all materials labour and T&P etc. required for proper completion of work. As per S.I. No. 574 (Including labour cess but GST will be paid extra as applicable) |
| 18 | Maintenance of constructed road for next five year after completion of work shall be paid. as per GO No 17/2024/lk0-113/23-1-2024-23-1099-113/2023 yksd fuekZ.k foHkkx vuqHkkx&1 fnuakd 16-01-2024 ,oa dk;kZy; izeq[k vfHk;Urk ;krk;kr oxZ yks0fu0fo0 y[kuÅ dk i=kad&3689lh& vks0ih0vkj0,e0lh0@ewy&23&24 fnuakd 17-02-2024- Payment shall be done as per satisfaction of engineer in chage regarding maintenance work carried out by contractor (Including Labour Cess but GST will paid extra as applicable). 1st year Zero Maintenance cost and 2nd year Total construction of cost Item No. 1 to 17 Rs 22833152.50 @ 0.75% |
| 19 | 3rd Year cost of BOQ @ 1.50% in Item No. 1 to 19 |
| 20 | 4rth Year cost of BOQ @ 2.25% in Item No. 1 to 19 |
| 21 | 5rth Year cost of BOQ @ 3% in item no. 1 to 19 Please Enable Macros to View BoQ information |