| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 2 | Cement Treated Sub-BaseProviding, laying and spreading Material on a prepared sub grade, adding cement @2% by weight to the spread Material manually, mixed in place with rotavator and comacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 3 | Cement Treated BaseProviding, laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired uncomfired compressive strength and to form a layer of base. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 4 | Providing and applying tack coat with VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer/ Bituminous surface as per Technical Specification Clause 503. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 5 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 to required line, grade and level to serve as wearing course on a previously prepared base by manual means, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 (By Manual Means) Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 6 | Providing and laying Type \\"C\\" seal coat by manual means with VG-10 sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall as per Technical Specification Clause 510 ( By Manual Means) Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 7 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 8 | As per Dom |
| 9 | Construction of 350 mm dia NP3 Goul pipe |
| 10 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 11 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I.P.C.C grade M 10 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 12 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 13 | Pointing with cement mortar (1:3) on brick work in parapet as per technical specifications Clause 613.3 and 1208.4 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 14 | Plastering with cement mortar (1:4) 15 mm thick on brickwork in parapet as per technical specifications Clauses 613.4 and 1208.4 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 15 | Providing laying and fixing of 600 mm dia NP-3 Class Spigot Hume Pipe Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 16 | Lettering and painting of culvert and parapet etc. complete. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 17 | Kilometre StoneReinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8, fixed in position including painting & Printing etc. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 18 | Kilometer Stone |
| 19 | Hectometer Stone |
| 20 | Supply of Informatory sign Board Size 4*X3, Inaugration etc. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 21 | Ist Year Maintainance (@0% of Total Work Amount of S.No. 1 to S.No.17) |
| 22 | IInd Year Maintainance (@0.75% of Total Work Amount of S.No. 1 to S.No.17) |
| 23 | IIIrd Year Maintainance (@1.5% of Total Work Amount of S.No. 1 to S.No.17) |
| 24 | IVth Year Maintainance (@2.25% of Total Work Amount of S.No. 1 to S.No.17) |
| 25 | Vth Year Maintainance (@3.0% of Total Work Amount of S.No. 1 to S.No.17) Please Enable Macros to View BoQ information |