| 1 | Supply installation testing & Commissioning of high mast lighting system (as per PLG 07 of ILP UK techinical report no 7 of ILE UK /IS:875 Part-1 – 2015//BSEN10025/and IS:2062 )consisting of totally hot dip galvanised by piecewise single dipped method high mast, lantern carriage suitable for up to 12 nos luminaries with welded arm (excluding luminares), mast head frame assembly with full cover, including 1 No. LED 15 Watts aviation obstruction lights, double drum type self sustaining winch, integral power tool accesible from door with padlocking arrangement (winch motor with control circuit) hot dipped galvanised heavy duty pipe lightening finial, Stainless steel 6 mm dia. wire ropes (AISI 316, 7 / 19 costruction 3 no. rope for lantern carrage & 2 no. rope for winch assembly ) foundation bolt, torque limiter,EPR insulated PCP sheathed 5 core x 2.5 Sq.mm trailing cable, including outdoor type control panel for auto on / off, reverse / forward motor operation. The mast is constructed from mild steel plates (as per IS 5986 Gr. 510 ) cut and folded to form a polygonal section, telescopic jointed and welding as per BS 5135.etc. as required on Existing Foundation. ( See table P - 03 for specs.) OEM Must have Type test certificate for wind tunnel test . All as per pre approved by Engineer in-charge. 16.0 Mtr HM (in 2 section) suitable for 9 No. Luminaries |
| 2 | Supply and erection of Galvanized Iron pole with galvanizing done in single dipping (Average coating thickness Minimum 65 Microns) continuously tapered poles having Octagonal / Circular cross-sections designed to withstand the maximum wind speed as per IS 875, The pole shaft shall be made from sheet steel (HT Steel Conforming to grade S355JO) and confirming to BSEN 10025 and shall be continuously tapered with single longitudinal welding. There shall not be any circumferential welding. The welding of pole shaft shall be done by Submerged Arc Welding (SAW) process. pole shafts shall be provided with the rigid flange plate of suitable thickness (Fe 410 conforming to IS 226 / IS 2062) with provision for fixing 4 no. foundation bolts, This base plate shall be fillet welded to the pole shaft at two locations i.e. from inside and outside.The octagonal Poles shall have lockable door of approximate 500 mm length at the elevation of 500 mm from the Base plate with bakelite sheet having 6A SP MCB and 16 sqmm stud type connector ( 4 nos) inside the pole at door opening for cable connection of following length and dimension as per table P-01 with base plate and foundation bolt on the Existing cement concrete foundation.All as per pre approved by Engineer in-charge. Poles with Octagonal Cross Section. 8 Mtr. |
| 3 | Supply installation testing & Commissioning of high mast lighting system (as per PLG 07 of ILP UK techinical report no 7 of ILE UK /IS:875 Part-1 – 2015//BSEN10025/and IS:2062 )consisting of totally hot dip galvanised by piecewise single dipped method high mast, lantern carriage suitable for up to 12 nos luminaries with welded arm (excluding luminares), mast head frame assembly with full cover, including 1 No. LED 15 Watts aviation obstruction lights, double drum type self sustaining winch, integral power tool accesible from door with padlocking arrangement (winch motor with control circuit) hot dipped galvanised heavy duty pipe lightening finial, Stainless steel 6 mm dia. wire ropes (AISI 316, 7 / 19 costruction 3 no. rope for lantern carrage & 2 no. rope for winch assembly ) foundation bolt, torque limiter,EPR insulated PCP sheathed 5 core x 2.5 Sq.mm trailing cable, including outdoor type control panel for auto on / off, reverse / forward motor operation. The mast is constructed from mild steel plates (as per IS 5986 Gr. 510 ) cut and folded to form a polygonal section, telescopic jointed and welding as per BS 5135.etc. as required on Existing Foundation. ( See table P - 03 for specs.) OEM Must have Type test certificate for wind tunnel test . All as per pre approved by Engineer in-charge. All as per pre approved by Engineer in-charge. 12.5 Mtr HM (in 2 section) suitable for 6 No. Luminaries 2 no. rope for lantern carrage & 2 no. rope for winch assembly |
| 4 | Providing and Laying RCC Foundation for Octagonal / Conical Street Light poles, High mast Poles as per Drawing attach at Table P-4 with Following Procedure & All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR .A) Excavation of Pit for Foundation Size upto required depth from Ground levelB) Dressing of Pit and Dry stone pitching 200 mm thick including supply of stones and preparing surface complete.C) Providing and laying in position cement concrete of M-10 grade of 75 mm thicknessD) Reinforcement for R.C.C. work with TMT bars including straightening, cutting, bending, placing in position and binding all complete.E) Centring and shuttering including strutting , propping etc. and removal of form work for Footing and PedestalF) Providing & Fixing of 2 no. Required Size PLB HDPE Pipe & Foundation Bolt with template as per OEM Recommendations.G) Providing and Laying Reinforce cement Concrete of M-25 grade in Footing and Pedestal including Curing the foundation for 7 days.H) Providing and Fixing Nosing Angle 40 mm x 40 mm x 6mm with 2 no. 100 mm long, 10 mm dia. Lugs on each face.Pole Foundation for Octagonal pole from 7 Mtr. To 9 Mtr. |
| 5 | Providing & Laying P.V.C. / XLPE insulated & P.V.C. sheathed Arrmoured Aluminium cable confirming to IS:1554 P-I / IS :7098 P - I of 1.1 KV with H4- Grade electrolytic aluminium conductor confirming to IS 8130 of purity >99.6 %, round / flat strip armouring of cables, Inner / outer sheath confirming to IS:5831 in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray(with cable tie) including testing etc. as required of following size. OEM must have it's own in house NABL accrediated Laboratory for testing procedure as per IS:10810. 6.0 Sq. mm 4 core |
| 6 | Supply & Laying following size' B ' class , G.I. Pipe confirming to IS : 1239 P - 1 ( 2004 ) with accessories like bend, socket etc. for laying earth conductor/ strip / cable in ground/ surface/ recess as required. All as per pre approved by Engineer in-charge. (Earth Excavation will be Paid Extra) All as per pre approved by Engineer in-charge. 32 mm |
| 7 | Supply & Laying following size' B ' class , G.I. Pipe confirming to IS : 1239 P - 1 ( 2004 ) with accessories like bend, socket etc. for laying earth conductor/ strip / cable in ground/ surface/ recess as required. All as per pre approved by Engineer in-charge. (Earth Excavation will be Paid Extra) All as per pre approved by Engineer in-charge. 50 mm |
| 8 | labour charges for Excavating trenches of required width for pipes dressing of sides, ramming of bottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr.: All kind of Soils |
| 9 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Lime Concrete, cement concrete grade M-10 (1:5:10) and below |
| 10 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 11 | Providing and laying un-reinforced, plain cement concrete mix with Concrete Mixer & vibrator pavement over a prepared sub base with 43 grade cement , coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed as per approved mix design, laid, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints etc including all material, labour, machinery, lighting, guarding and maintenance of diversion. PCC M-20 |
| 12 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: 1.1.3 Stone, boulders, gravelly material |
| 13 | P / L of Double wall corrugated HDPE pipe confirming to IS : 16205 P-24, Stiffness Class 750 N, Externally corrugated and having smooth surface inside with HDPE Coupler, Elbow, Tee at required Depth below the ground for laying cable of following Nominal Outer dia. MFR Test report from NABL accrediated is to be submitted.(Excavation of Earth & Back filling with compaction is to be Paid Extra)All as per pre approved by Engineer in-charge. 50 mm |
| 14 | labour charges for Excavating trenches of required width for pipes dressing of sides, ramming of bottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr.: Ordinary Rocks |
| 15 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer. Bituminous courses |
| 16 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer. Granular courses |
| 17 | Plate Earthing as per IS:3043 with Hot dipped G.I. Earth plate of size 600mm x 600mm x 6.0mm by embodying 3 to 4 mtr. below the ground level with 20 mm dia. G.I. 'B' class watering Pipe ,including all accessories like nut, bolts, reducer, nipple, wire meshed funnel, and Heavy duty weather proof poly-propylene earth pit chamber with lockable Jam free lid suitable for safe working load 5000 Kg or more of size Top Dia. 225 to 260 mm, Bottom Dia 300 to 350 mm. and Height 250 to 300 mm. and embodying the pipe complete with alternate layers salt and coke/ charcoal, testing of earth resistance for value of 5 ohms or less as required & must record by engineer in-charge during site visit and ensure to enter in measurment book.All as per pre approved by Engineer in-charge. |
| 18 | Supplying and drawing FR PVC insulated & unsheathed flexible copper conductor as per PWD specification for electrical Works with ISI marked (IS:694) and as per IS 8130 : 2013 of 1.1 kV grade . Wire should be made from 99.90 % purity copper, class 5 stranding in acc. to IS:8130/IEC 60228 for lower watt loss , oxygen free for less chances of oxidization, insulation PVC type A/C/D , flame retardant as per IS 10810-53, better amperage rating as per IS:3961 part 5, in existing surface or recessed PVC/ MS conduit/casing capping making connections with Copper Lugs of suitable size, Ferrules,testing etc. as required. OEM Must have its own in house NABL lab setup for all testing facilities for wires. 3 x 1.5 sq.mm |
| 19 | Providing & Fixing of IK08 IP-66 protected high power LED flood light system with single piece Pressure diecast aluminium housing, toughened glass diffuser with suitable lenses on LED to achieve various beam angles, of high power LED of 3 to 5 watt each . Integrated potted driver as a unique BIS R number having efficiency more than 85 % and in compliance to BIS certified and Trade mark certificate. The System level Luminaire efficacy >=125 lm/ wt. LED driver Input Voltage AC 120 to 270 V AC with High voltage Cutoff @>=300 V AC and Auto resetting Safety .Power Factor >0.95 , THD(I) <10% , driver current <=750mA. driver should be Phase to phase protection of 440 V for 4 Hrs. Electrical Connector , Surge Protection Min >=4KV internal and 10KV external but inside driver compartment, System life of 50000 Burning hours with 70% of Initial Lumens maintained, CRI>70 and CCT 5700K ±355K. Manufactures Word Mark/Name Engraved/Embossing/Screen printing on die cast housing to allow traceability/authenticity. Fixture shall be IS 10322 Complianced.OEM Must have its own in house NABL lab setup for all testing facilities for LED fixtures. (LM79/LM80) Certificate/ report with liable warranty of product/accessories from OEM shall be submitted. All as per pre approved by Engineer in-charge. High Power LED Flood Light Minimum lumen output 25000 lm |
| 20 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In all type of soil |
| 21 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 22 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size). (As per design mix) |
| 23 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. Please Enable Macros to View BoQ information |