| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 2 | Providing laying and spreading material on a prepared sub base grade, adding cement @ 2% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined Compressive strength and to form a layer of sub-base. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 3 | Providing, laying, spreading Material on prepared sub base, cement @ 4% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strengthe and to form a layer of base. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 4 | Providing and applying tack coat with VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer/Bituminous surface as per Technical Specification Clause 503. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 5 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 to required line, grade and level to serve as wearing course on a previously prepared base by manual means, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 (By Manual Means). Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 6 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 7 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 8 | Excavation in foundation by manual means in ordenary soil…..... as per SOR no. 251 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 9 | PCC 1:3:6 nominal mix in foundation 4 cm gauge .....as per Mord specification SOR no. 280 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 10 | Brick Masonry Work in Cement Mortar 1:3 in Foundation... Mord specification. SOR no. 307 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 11 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row.....as per Mord specification. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 12 | Brick Masonry Work in Cement Mortar 1:3 in substructure.. Mord specification. SOR no. 307 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 13 | Struck Pointing with cement mortar (1:2) on brick work in substructure.. Mord specification. SOR 574 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 14 | Plastering with cement mortar (1:3) on brick work in substructure Mord specification SOR no. 583 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 15 | Kilometre Stone Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 16 | Supply and fixing of Kilometer stone complete Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 17 | Hectometre Stone Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 18 | Supply and fixing village sign Board Complete as directed by the Engineer. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 19 | Ist Year Maintainance (@0% of Total Work Amount of S.No. 1 to S.No.16) |
| 20 | IInd Year Maintainance (@0.75% of Total Work Amount of S.No. 1 to S.No.16) |
| 21 | IIIrd Year Maintainance (@1.5% of Total Work Amount of S.No. 1 to S.No.16) |
| 22 | IVth Year Maintainance (@2.25% of Total Work Amount of S.No. 1 to S.No.16) |
| 23 | Vth Year Maintainance (@3.0% of Total Work Amount of S.No. 1 to S.No.16) Please Enable Macros to View BoQ information |