| 1 | Clearing and grubbing road land including uprooting vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per section 200, clause 201 of the MoRT&H Specifications for Road & Bridge works (5th Revision) including all cost i.e cost of all materials, all labour, all T&P etc complete and as per direction of the Engineer- in- charge. |
| 2 | Scarifying and removing the existing bituminous road surface to the required depth as per approved drawing and technical specifications and disposal of scarified materials within all lifts and lead upto 1000mtr. complete in all respect as per Section 900, Clause 305.4.3, 305.8, 305.9.5, 501.8.3.2, 501.8.7.2 and 501.8.8.1 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 3 | Reworking the scarified bituminous surface suitably after supplementing the base materials with sand and compacting finished surface as per approved drawing and technical specifications as per Section 900, Clause 501.8.3.2 and 501.8.8.1 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of Engineer-in-Charge. |
| 4 | Earth work in excavation for road works toe wall and CD works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and techinical specification including setting out dressing of section to correct line level grade & camber and loading into tippers transporting to embankment site within all lifts and lead upto 1000 mtr and utilising the surplus earth locally for road work whenevre required, backfilling the excavation earth to the extent required complete Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per section 300 & all relevant sections/ clauses of Specification for road & bridge work of MoRT &H (5th Revision) & direction of Engineer in charge |
| 5 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density for embankment construction & Clause 305, section-900 of MoRT&H Specifications for Road & Bridge works (5th Revision) |
| 6 | Construction of Granular sub-base by providing Grading-VI material as per table 400-2, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MoRT&H Specifications for Road & Bridge works (5th Revision) |
| 7 | Providing Wet Mix Macadam using crushed stone aggregates as per approved drawing and technical specification as per clause 406, section 900 and all relevant sections/ clauses of the MoRT&H Speification for road & Bridge works (5th Revision) & including all cost i.e cost of all matericals,all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 8 | Providing & applying primer coat with slow setting (SS-1) Bitumenn Emulsion on prepared surface of granular base includingclearing road surface and spraying primer @ 0.60 Kg / Sqm using mechinical means as per clause 501, 502 and section 900 and all relevant sections/ clauses of the specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 9 | Providing & applying tack coat with rapid setting (RS-1) Bitumen Emulsion on prepared surface including cleaning of road surface and spraying tack coat @ 0.20 K.g / Sqm using mechanical means as per Cluse No. 501, 503 and Section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 10 | Providing & laying compacted Bituminous Macadam (Grading-II ) using 60/70 grade Bitumen with Hot Mix Plant using crusher broken hard granite aggregates of specified grading premixed with bituminous binder @ 3.3 % by weight of total mix and filler, transporting the hot mix to works site, lying with Hydrostatic Paver Finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compacting as per Clause No.106, 108, 111, 112, 501, 503 , 504 and section 900 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) &including cost of all materials, labour, T&P, taxes, royalty etc complete in all respect and as per direction of the Engineer-in-charge. |
| 11 | Providing and laying compacted Semi Dense Bituminous Concrete (Grading-II) with Batch type Hot Mix Plant using crushed stone aggregates of specified grading, premixed with bituminous binder of 60/70 (VG-30) penetration grade of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibtratory and tandem rollers to achieve the desired compaction as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501 & 508 of MoRT&H Specifications for Road & Bridge works (4th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 12 | Providing dry lean cement concrete sub-base by with coarse and fine aggregates conforming to I:S 383, the size of coarse aggregate not exceeding 25mm , aggregate cement ratio not to exceed 15:1, aggregate gradation as per table 600-1, cement content not to be less than 150 Kg/Cum, mixing in concrete mixers with weigh batcher and transporting to work site, laying, spreading and compacting with PRR to the required thickness, finishing and curing as per approved drawing and specification complete in all respect as per Section 900 & Clause 601 of MoRT&H Specifications for Road and Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 13 | Providing un-reinforced, dowel jointed cement concrete pavement over a prepared sub base as per approved mix design, using 43grade cement not less than 400kg/cum, coarse and fine aggregates conforming to I:S 383, maximum size of coarse aggregate not exceeding 25mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip from paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler,separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per approved drawing and technical specification complete in all respect as per Section 900 & Clause 602 of MoRT&H Specifications for Road and Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 14 | Providing compacted shoulder with granular materials by using moorum of approved quality, watering and compacting the required density in OMC with VRR as per approved drawing and technicial specification as per Section 900 and SECTION 400 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 15 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2 and as per clause -305 of MoRT&H Specification for Road & Bridge works (5th Revision) including all cost i.e cost of all materials, all labour, all T&P etc complete and as per direction of the Engineer - in - Charge. |
| 16 | Construction of embankment with approved materials obtained from borrow pits with all leads and lifts transporting to site spreading, grading slope and compacting to meet required etc complete as per Clause No 305, section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 17 | Fine dressing and providing, laying turfing with live sods of perennial turf forming grass on embankment slope, verges or other locations including preparation of ground, fetching of sods with all lifts and leads upto 5 Km. and watering complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 307 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 18 | Dismantling CC of M-10 & bellow by manual means including disposal of unserviceable materials & stacking serviceable materials upto 1000m lead etc.complete as per Clause -202 of MoRT&H Specifications for Road & Bridge works (5th Revision). & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. |
| 19 | Dismantling of Rubble stone masonry in cement mortar including T&P and scaffolding wherever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000 mtr. as per Clause No.202 of MoRT&H specifications for Road and Bridge works (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. |
| 20 | Dismantling of Cement Concrete Grade M-15 & M-20 including T&P and scaffolding wherever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000 mtr. as per Clause No.202 of MoRT&H specifications for Road and Bridge works (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. |
| 21 | Removing of hume pipe upto 600mm dia including earthwork and dismantling of masonry works including T&P and scaffolding whenever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000 mtr. as per Clause No.202 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. |
| 22 | Providing and fixing pre-cast RCC (1:2:4) Kilometer stone as per I.R.C. design including finished smooth Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 23 | Ordinary Kilometre stone |
| 24 | 5th Kilometre stone |
| 25 | Supplying & fixing 15cm dia,1.0m long guard post of cement Concrete (1:2:4) kilometer stone as per I.R.C Deisgn including finshed smooth &Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 26 | Providing road marking with hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads@250gms per sqm area , thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35.The finished surface to be level, uniform and free from streaks and holes etc. for finished item of work as per approved drawing and technical specification complete in all respect as per Section 900 and Clause 803.4 of MoRT&H specification for road and bridge work (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 27 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of Class-B Type-IV recto reflective sheeting fixed over 2mm thick alumunium sheeting , 3mm/4mm thick alumunium composite material sheet depending on the size of sign vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) fixed over back support frame of min 25x25x3 mm angle mounted on a mild steel cicular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M-25 grade cement concrete 45cmx45cm x 60 cm, 60cm below ground level as per approved drawing including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. The sign shall be maintained as per Section 12 of IRC-67. |
| 28 | Cautionary signs triangular (900mm equilateral trinagle) |
| 29 | 90cm x 30cm rectangular (Object Hazard Marker) |
| 30 | Circular 600mm dia |
| 31 | 80 cm x 60 cm rectangular (Informatory Sign) |
| 32 | Route marker signs(450x600mm) |
| 33 | Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting fixed over alumunium sheeting 2mm thick or alumunium composite material sheet with overall thickness of 4mm vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) with area not exceeding 0.9 Sqm fixed over back support frame of minimum 40x40x5 mm angle mounted on two nos of mild steel circular pipe 65NB, 3.2 mm thickness & 4.50mtr total height firmly fixed on ground by means of properly designed foundation with M-25 grade cement concrete 45x45x60cm, 60cm below ground level as per approved drawing including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. |
| 34 | Directional/Place Identification signs (1200x700 mm) |
| 35 | Painting two coats with synthetic enamel paint of approved quality and shade over a coat of primer at any elevation on kerb, guard post and other structures etc for the finished item of work as per technical specifications complete in al lrespect as per Section 800 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 36 | Providing and fixing of bi-directional retro reflective raised pavement markers of approved colour, quality & make conforming to ASTM D-4280 made from injection moulded high impact polymer including cleaning, preparation of surface and fixing at position with approved quality adhesives including cost of all materials, labour, transportation, taxes, duties, sundries, T&P etc. complete and as per direction of Engineer-in-Charge. |
| 37 | Earth work in excavation for road works toe wall and CD works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and techinical specification including setting out dressing of section to correct line level grade & camber and loading into tippers transporting to embankment site within all lifts and lead upto 1000 mtr and utilising the surplus earth locally for road work whenevre required, backfilling the excavation earth to the extent required complete Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per section 300 & all relevant sections/ clauses of Specification for road & bridge work of MoRT &H (5th Revision) & direction of Engineer in charge |
| 38 | Providing, filling clean sand of approved quality in road work for construction of drainage layer and foundation trenches of structures in uniform layers, watered and rammed/ compacted as per approved drawing and technical specifications complete in all respect as per Section 900, 2100 and Clause 401 & 304 of MoRT&H specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 39 | Rough stone dry packing in aprons revetments stone pitching in slopes and stone packing in boulder apron etc with hard granite stone of size 15 cm to 30 cm as per approved drawing and Section 2500, 900 of specifications for road and bridge works of Minister of Road Transfort & Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 40 | Plain cement concrete M-15 in Foundation Bed as Levelling Course including centering and shuttering with crushed stone aggregates 20mm size and mixed , placed in foundation and compacted as per section 900, 1500, 1700, 2100, 2900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 41 | Plain cement concrete M-15 inSubstructure of CD Work including centering and shuttering with crushed stone aggregates 20mm size and mixed , placed in foundation and compacted as per section 900, 1500, 1700, 2100, 2900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 42 | Reinforced cement concrete M-25compacted by vibration including curing for 14 days as per Section 900, 1500,1700,2100 & all relevant sections/ clauses of MORT&H specifcation and cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect but excluding the cost and conveyance of M.S Rod or TOR steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending ,bindind and tying the grills and placing in proper position and as per specification and direction of the Engineer- in- charge. |
| 43 | In foundation |
| 44 | In Sub-structure |
| 45 | In superstructure |
| 46 | Providing & fixing in position RCC Crash barrier monolithic with slab M-40 grade as per approved drawing and technical specifications Clause 809, Section 800 & 1000 of MoRT&H Specifications for Road & Bridge works (5th Revision) etc complete in all respect & Including all cost i.e cost of all materials, all labour, all T&P required for the purpose including fitting and fixing in position and as per direction of the Engineer- in- charge. |
| 47 | Supplying, fitting and placing uncoated HYSD bar reinforcement of primary steel producers such as SAIL/TATA/RINL/JINDAL STEEL/ SHYAM STEELetc. including cutting, bending and binding as per drawing and technical specification as per section 1600, section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P etc complete in all respect and as per direction of the Engineer- in- charge. |
| 48 | Reinforced cement concrete M-30 (Wearing coat) compacted by vibration including curing for 14 days as per Section No.900,1500,1600,1700,2300,2700 & all relevant sections/ clauses of MORT&H specifcation and cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect including the cost and conveyance of M.S Rod or TOR steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending ,bindind and tying the grills and placing in proper position and as per specification and direction of the Engineer- in- charge. |
| 49 | Providing weep holes in brick masonry / plain or RCC /abutment / wing wall , retaining wall/ toe wall with 100mm dia AC pipe extending through the full width of structure with slope of 1V : 20H towards draining face complete as per drawing and technical specification as per Clause - 2706 of MoRT&H Specition for Road & Bridge works (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 50 | Providing and laying of metal spall backing using 45mm size crushed hard granite stone aggregates to the required thickness with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall and return wall of CD works to the full height compacted to a firm condition as per drawing and technical specifications complete in all respect satisfying the requirements laid down in Clause 2504.2.2 and Section 900 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 51 | Painting two coats with synthetic enamel paint of approved quality and shade over a coat of primer at any elevation on kerb, guard post and other structures etc for the finished item of work as per technical specifications complete in al lrespect as per Section 800 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 52 | Gravel backing to approns & revetments and providing fliter material using gravel underneath pitching in slope as per approved drawings and techinical specification as per section 2500, 900 of Spectification for Road & Bridge works (5th Revision) and including all cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect and as per direction of Engineer - in- charge. |
| 53 | Providing, laying and fixing in position reinforced cement concrete 1200mm dia NP4 hume pipes for culverts on first class bedding of granular materials including pointing ends fixing collars with cement mortar 1:3 for finished item of work as per approved drawing and technical specifications complete in all respect as per Section 900, 1000 & 2900 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 54 | Grouting aprons & revetments of 23cm deep with cement concrete (1:4:8) using 25mm size crushed stone aggregates including cost, conveyance, royality of materials, cost of labour, T&P etc complete as per the direction of the Engineer-in-charge. |
| 55 | Reinforced cement concrete M-20 compacted by vibration including curing for 14 days as per Section 900, 1500,1700,2100 & all relevant sections/ clauses of MORT&H specifcation and cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect but excluding the cost and conveyance of M.S Rod or TOR steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending ,bindind and tying the grills and placing in proper position and as per specification and direction of the Engineer- in- charge. |
| 56 | In foundation |
| 57 | In Sub-structure |
| 58 | In Drain Slab Please Enable Macros to View BoQ information |