| 1 | Dismentalling brick or stone masonry in lime or cement mortar under 3m height.scaffolding, staging charges with cost conveyance cess and royalties of all materials and labour with T&P required for the work etc. complete in all respect in all floors. |
| 2 | Earth work in ordinary soil within 50m, initial lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge |
| 3 | Supplying and filling in foundation and plinth with sand excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-in-charge. |
| 4 | Cement concrete (1:3:6) with 40mm size hgcb metal including all cost, conveyance,royalty & taxes etc.compete of all materials to work site as per specification approved by the department & direction of Engg-in-charge.. |
| 5 | Fly Ash Brick masonry in C.M. (1:6) using 9\\" size in Foundation & Plinth using of 23cmx11cmx8cm size brick having a crushing strength of not less than 75 kg per Sq.cm including splays, cuttings, circular moldings, watering & curing for 7 days, cost, conveyance, royalties of all materials, labour with T&P etc. complete in all respect as directed by the Engineer-in-charge. |
| 6 | R.C.C. work of proportion M-25 grade having minimum compressive strength in work test of 250 Kg/Cm2 at 28 days using 20 mm and down graded size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering and laying concrete and compacting by using vibrators watering, curing for 28 days, centring & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary in all floors including cost, conveyance, royalties and taxes of all materials , cost of all labour with cost of all T&P required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or steel & binding wires and labour charges for strengthening, cutting, bending grills and placing in proper position etc complete as per direction of Engineer-in-Charge. . Column Base |
| 7 | b) Plinth beam |
| 8 | C) Column |
| 9 | Supplying,cutting ,straightening of steel HYSD (Fe- 415) conforming to (IS- 1786) with bending, binding, cranking, hooking, welding or jointing if necessary & tying the grills and placing in position as required for the Rod work in all floors and & for providing fan hooks hosting lowering ,& laying steels including cost conveyance ,taxes & royalties of all materials and binding wires of 18 to 20 gauge & cost of all labour T&P required for the work etc. Complete in all respect as per the direction of Engineer in charges. |
| 10 | Fly Ash Brick masonry in C.M. (1:6) using 9\\" size in Super structure using of 23cmx11cmx8cm size brick having a crushing strength of not less than 75 kg per Sq.cm including splays, cuttings, circular moldings, watering & curing for 7 days, cost, conveyance, royalties of all materials, labour with T&P etc. complete in all respect as directed by the Engineer-in-charge. |
| 11 | Providing 12 mm thick cement plaster with cement mortar of mix (1:6) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties of all materials with cost of all labour,labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. |
| 12 | Providing 16 mm thick cement plaster with cement mortar of mix (1:6) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties of all materials with cost of all labour,labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge |
| 13 | Painting 2 (two) coats with any approved weather coat over a coat of primer with brush to out wall surface after scraping & cleaning the surface including cost of paint, with cost, conveyance and cess, taxes of all materials and labour with T&P required for the work etc. complete in as per specification and direction of Engineer-in-Charge. |
| 14 | Filling F&P with excavated materials including all cost, conveyance,royalty & taxes etc.compete of all materials to work site as per specification approved by the department & direction of Engg-in-charge |
| 15 | Providing 600 dia Razor wire concertina coil including all cost, conveyance,royalty & taxes etc.compete of all materials to work site as per specification approved by the department & direction of Engg-in-charge. |
| 16 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. |
| 17 | Carraige of earth by mecahnical means with cost of all lead & lift upto 5Km. including cost of all labour,T&P etc complete Please Enable Macros to View BoQ information |