| 1 | Removing old lime or cement plaster from walls including racking out joints 12mm deep and removing the debris with in 50m lead including cost of all labour with T&P etc. complete. |
| 2 | Removing old tarfelt from roof slab, cleaning the surface, lowering and removing the debris with in 50m lead including cost of all labour with T&P etc. complete. |
| 3 | Dismentalling A.C.C/ G.C.I sheet roofing after carefully removing the nuts including stacking the materials for re-use and removing the debris with in 50m lead, including cost of all labour with T&P etc. complete. |
| 4 | R.C.C. work of proportion M-20 grade having minimum compressive strength in work test of 200 Kg/Cm2 at 28 days using 20 mm and down graded size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering and laying concrete and compacting by using vibrators watering, curing for 28 days, centring & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary in all floors including cost, conveyance, royalties and taxes of all materials , cost of all labour with cost of all T&P required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or steel & binding wires and labour charges for strengthening, cutting, bending grills and placing in proper position etc complete as per direction of Engineer-in-Charge COVER SLAB |
| 5 | Cement concrete of proportion (1:2:4) in F&F using 12mm size cb/hb chips of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect |
| 6 | Providing 6 mm thick cement plaster with cement mortar of mix (1:4) with screened and washed sharp sand for mortar and finished smooth to R.C.C. work after closed deep chipping & slurry treatment including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties of all materials with cost of all labour,labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. |
| 7 | Providing, fitting, fixing up partition walling OEL aluminium anodized section No. 9210 and 9207 as single groove and double groove respectively as horizontal and vertical member and OEL section 4660 as Tapered clip for fixing up ACP Board and Glass and jointing angle No. 1855 including all fitting ,cost of all materials, taxes, labour, T&P etc. complete as per direction of Engineer in Charge. |
| 8 | Providing, fitting, fixing of Aluminium. door with OEL anodized Al. door section of 9202 as vertical member, 9201 as top member & 9200 as bottom & middle member & 6mm plain glass in top portion with 12mm thick pre laminated board in bottom portion fixed on door frame by means of apered clip No. 4660 & the frame to be completed by means of jointing angle No. 1855 including all fitting ,cost of all materials, taxes, labour, T&P etc. complete as per direction of Engineer in Charge. |
| 9 | Suplying fitting, fixing up window ( Sliding type ) made up aluminium section 9778 as windows frame section No. 4096, 9777 and 3994 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting ,cost of all materials, taxes, labour, T&P etc. complete as per direction of Engineer in Charge. G.F |
| 10 | Suplying fitting, fixing up window ( Sliding type ) made up aluminium section 9778 as windows frame section No. 4096, 9777 and 3994 as shutter frame with 6mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting ,cost of all materials, taxes, labour, T&P etc. complete as per direction of Engineer in Charge. F.F |
| 11 | Providing ,fitting and fixing with sal wood battens,7.5 cm x 1.2 cm with 6 mm mesh wire netting,or expanded metal including panting complete(Mosquito Net) |
| 12 | Supplying fitting & fixing of 5.5 mm thick hexagonal aluminium jally in windows as single groove,double groove and tapered clip as horizontal and vertical members for fixing of aluminium jally and jointing angle conforming to standard aluminium sections etc. complete G.F |
| 13 | Supplying fitting & fixing of 5.5 mm thick hexagonal aluminium jally in windows as single groove,double groove and tapered clip as horizontal and vertical members for fixing of aluminium jally and jointing angle conforming to standard aluminium sections etc. complete F.F |
| 14 | 2.5 cm thick Grading Concrete over roof slab with cement concrete (1:2:2) using 7mm downgraded size black hard granite crusher broken chips and screened & washed sharp sand for mortar and finished smooth to the rough surface of slab including watering and curing with cost, conveyance, royalties and taxes of all materials with cost of all labour, and T&P required for the work etc. complete in all respect as directed by the Engineer in charge |
| 15 | Providing and laying water proofs with polymetric bituninous membrance Plastic felt of 2.25 Kg sqm and 2mm thickness consisting of layers having centre core of 20 micron thermoplastic high molecular high density polythylens H.M.H.D.P.E. film of grade 2504 including priming the surface with bituminious primer 0.3 Kg Sqm. providing a coat of hot blown bitumen of 1.32 Kg Sqm applying and laying plastic felt membrance with 10cm. overlaping adhered to blown bitumen of 85 25 or 90 15 grade and covered with a layer of hot bitumen 1.2 Kg sqm etc. complete including cost of al materials and labour etc. complete as per the direction of Engineer in Charge. |
| 16 | Providing 12 mm thick cement plaster with cement mortar of mix (1:6) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties of all materials with cost of all labour,labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. |
| 17 | Painting two coats with plastic emulsion paint to make an even finished surface in all floors and heights to wall surface of approved make and shade including sand papering, applying putty wherever necessary & cost of scaffolding, staging charges with cost, conveyance, taxes of all materials, cost of all labour, T&P etc. complete as per the direction of the Engineer-in-charge G.F |
| 18 | Painting two coats with plastic emulsion paint to make an even finished surface in all floors and heights to wall surface of approved make and shade including sand papering, applying putty wherever necessary & cost of scaffolding, staging charges with cost, conveyance, taxes of all materials, cost of all labour, T&P etc. complete as per the direction of the Engineer-in-charge F.F |
| 19 | Painting two (2) coats with any approved Enamel paint to new wood work and iron work including sand papering,polishing the surface smooth with cost,conveyance,taxes of all materials and labour with T&P required for the work etc.complete in all respects.G.F |
| 20 | Painting two (3) coats with any approved Enamel paint to new wood work and iron work including sand papering,polishing the surface smooth with cost,conveyance,taxes of all materials and labour with T&P required for the work etc.complete in all respects.F.F |
| 21 | Finishing plastered surfaces with Acrylic wall putty (water based) of approved make and finishing the surface smooth and even by sand papering to receive paint in walls, at all heights with staging wherever necessary with cost, conveyance, taxes of all materials, cost of all labour, all T&P etc. required for the work complete in all respect as per the direction of the Engineer-in-charge. |
| 22 | Painting 2 (two) coats with any approved weather coat over a coat of primer with brush to out wall surface after scraping & cleaning the surface including cost of paint, with cost, conveyance and cess, taxes of all materials and labour with T&P required for the work etc. complete in as per specification and direction of Engineer-in-Charge G.F |
| 23 | Painting 2 (two) coats with any approved weather coat over a coat of primer with brush to out wall surface after scraping & cleaning the surface including cost of paint, with cost, conveyance and cess, taxes of all materials and labour with T&P required for the work etc. complete in as per specification and direction of Engineer-in-Charge F.F |
| 24 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge Please Enable Macros to View BoQ information |