| 1 | NIT No.: Date: STANDARD BIDDING DOCUMENT FOR PROCUREMENT OF WORKS Development of Green Space Between two canals & over covered canal at town Dhuri Volume -3 Project Value: Capital Cost: Part-A & B Percentage Rate Rs.1227.86 Lakh O&M Cost Part-C Percentage Rate Rs. 86.46 Lakh. Price Bid February, 2026 NIT No.: Date: Name of Work: Development of Green Space Between two canals & over covered canal at town Dhuri Name of Bidder: General Summary S.No Particulars Total Amount (Rs) Capital Works: Percentage Rate |
| 2 | CIVIL (PART-A) |
| 3 | ELECTRICAL (PART-B) |
| 4 | 5 years' O& M (PART-C) Estimate Amount (Part A, B and C ) (In Rs): 131431886.24126007 Percentage Above/Below/At Par Select % Amount as per percentage quoted, Percentage Rate (Part A, B & C) (Amount in Rs) 0.0 Amount In Words No Rupees and No Paise Provisional Sum (Not part of bidding) Rs in Lakh = 3.8209229999999996 Provisional Sum S.no. Description Unit Qty Amt.(Rs.lakh) Provisional Sum |
| 5 | Contingencies = 0.25 % of Capital Cost |
| 6 | Electrical Connection Charges Total : Provisional Sum (Not part of bidding) 3.8209229999999996 CIVIL WORKS S.no. CSR Ref. Description Unit Qty Rate (Rs) Rate (Rs. In Words) Amount(Rs) Capital Works CSR Items ( Part - A)- CIVIL Sub Head-1:Development of Parks Stretch-1 |
| 7 | 14.11 |
| 8 | 12.16 |
| 9 | 12.25 |
| 10 | 32.57 32.38 Providing cement pots at site of work, filling 2/3rd volume with mixture of good earth and screened manure and cocopeat in the ratio 2:1:1. |
| 11 | (e) 32.4 Supplying seasonal flowers in earthen pots at site of work, as specified by Engineer-in-charge |
| 12 | ( c ) |
| 13 | 32.9 (a) |
| 14 | 32.75 |
| 15 | 10.13 a (ii) |
| 16 | 14.91 |
| 17 | Aor 5.2 (i) Earth,Surkhi,Sand,earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbish,Earth |
| 18 | Difference in Rates of materials |
| 19 | Stretch-2 |
| 20 | 14.11 |
| 21 | 12.16 |
| 22 | 12.25 |
| 23 | 32.57 32.38 Providing cement pots at site of work, filling 2/3rd volume with mixture of good earth and screened manure and cocopeat in the ratio 2:1:1. |
| 24 | (e) 32.4 Supplying seasonal flowers in earthen pots at site of work, as specified by Engineer-in-charge |
| 25 | ( c ) |
| 26 | 32.9 (a) |
| 27 | 32.75 |
| 28 | 10.13 a (ii) |
| 29 | 14.91 |
| 30 | Aor 5.2 (i) Earth,Surkhi,Sand,earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbish,Earth |
| 31 | Difference in Rates of materials |
| 32 | Stretch-3 |
| 33 | 14.11 |
| 34 | 12.16 |
| 35 | 12.25 |
| 36 | 32.57 32.38 Providing cement pots at site of work, filling 2/3rd volume with mixture of good earth and screened manure and cocopeat in the ratio 2:1:1. |
| 37 | (e) 32.4 Supplying seasonal flowers in earthen pots atsite of work, as specified by Engineer-in-charge |
| 38 | ( c ) |
| 39 | 32.9 (a) |
| 40 | 32.75 |
| 41 | 10.13 a (ii) |
| 42 | 14.91 |
| 43 | Aor 5.2 (i) Earth,Surkhi,Sand,earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbish,Earth |
| 44 | Difference in Rates of materials |
| 45 | Stretch-4 |
| 46 | 14.11 |
| 47 | 12.16 |
| 48 | 12.25 |
| 49 | 32.57 32.38 Providing cement pots at site of work, filling 2/3rd volume with mixture of good earth and screened manure and cocopeat in the ratio 2:1:1. |
| 50 | (e) 32.4 Supplying seasonal flowers in earthen pots atsite of work, as specified by Engineer-in-charge |
| 51 | ( c ) |
| 52 | 32.9 (a) |
| 53 | 32.75 |
| 54 | 10.13 a (ii) |
| 55 | 14.91 Aor Providing & fixing of Dholpur stone tiles 25 mm thick flooring set in 25 mm thick cement mortar 1:3 jointing with cement mortar 1:2 with High polymer modified quick set tile adhesive and admixture of pigment to match the shade of stone. |
| 56 | 5.2 (i) Earth,Surkhi,Sand,earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbish,Earth |
| 57 | Difference in Rates of materials |
| 58 | Stretch-5 |
| 59 | 14.11 |
| 60 | 12.16 |
| 61 | 12.25 |
| 62 | 32.57 32.38 Providing cement pots at site of work, filling 2/3rd volume with mixture of good earth and screened manure and cocopeat in the ratio 2:1:1. |
| 63 | (e) 32.4 Supplying seasonal flowers in earthen pots atsite of work, as specified by Engineer-in-charge |
| 64 | ( c ) |
| 65 | 32.9 (a) |
| 66 | 32.75 |
| 67 | 10.13 a (ii) |
| 68 | 14.91 |
| 69 | Aor 5.2 (i) Earth,Surkhi,Sand,earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbish,Earth |
| 70 | Difference in Rates of materials |
| 71 | Stretch-6 |
| 72 | 14.11 |
| 73 | 12.16 |
| 74 | 12.25 |
| 75 | 12.9 32.38 Providing cement pots at site of work, filling 2/3rd volume with mixture of good earth and screened manure and cocopeat in the ratio 2:1:1. |
| 76 | (e) 32.4 Supplying seasonal flowers in earthen pots atsite of work, as specified by Engineer-in-charge |
| 77 | ( c ) |
| 78 | 32.9 (a) |
| 79 | 32.75 |
| 80 | 10.13 a (ii) |
| 81 | 14.91 |
| 82 | Aor 5.2 (i) Earth,Surkhi,Sand,earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbish,Earth |
| 83 | Difference in Rates of materials |
| 84 | Stretch-7 |
| 85 | 14.11 |
| 86 | 12.16 |
| 87 | 12.25 |
| 88 | 32.57 32.38 Providing cement pots at site of work, filling 2/3rd volume with mixture of good earth and screened manure and cocopeat in the ratio 2:1:1. |
| 89 | (e) 32.18 Supplying seasonal flowers in earthen pots atsite of work, as specified by Engineer-in-charge |
| 90 | ( c ) |
| 91 | 32.9 (a) |
| 92 | 32.75 |
| 93 | 10.13 a (ii) |
| 94 | 14.91 |
| 95 | Aor 5.2 (i) Earth,Surkhi,Sand,earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbish,Earth |
| 96 | Difference in Rates of materials |
| 97 | Stretch-8 |
| 98 | 14.11 |
| 99 | 12.16 |
| 100 | 12.25 |
| 101 | 32.57 32.38 Providing cement pots at site of work, filling 2/3rd volume with mixture of good earth and screened manure and cocopeat in the ratio 2:1:1. |
| 102 | (e) 32.4 Supplying seasonal flowers in earthen pots atsite of work, as specified by Engineer-in-charge |
| 103 | ( c ) |
| 104 | 32.9 (a) |
| 105 | 32.75 |
| 106 | 10.13 a (ii) |
| 107 | 14.91 |
| 108 | Aor 5.2 (i) Earth,Surkhi,Sand,earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbish,Earth |
| 109 | Difference in Rates of materials |
| 110 | Stretch-9 |
| 111 | 24.6 ( c ) |
| 112 | 10.10 (ii) |
| 113 | 10.13 (ii) |
| 114 | 24.41 |
| 115 | 32.13 |
| 116 | 32.18 |
| 117 | 32.13 |
| 118 | 32.14 |
| 119 | 32.34 |
| 120 | 32.22 |
| 121 | 32.9 (a) |
| 122 | 32.57 |
| 123 | 32.75 5.2 (i) Earth,Surkhi,Sand,earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbish,Earth |
| 124 | Difference in Rates of materials |
| 125 | Stretch-10 |
| 126 | 10.10 (ii) |
| 127 | 10.13 (ii) |
| 128 | 24.41 |
| 129 | 32.13 |
| 130 | 32.18 |
| 131 | 32.13 |
| 132 | 32.14 |
| 133 | 32.34 |
| 134 | 32.22 |
| 135 | 32.9 (a) |
| 136 | 32.57 |
| 137 | 32.75 5.2 (i) Earth,Surkhi,Sand,earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbish,Earth |
| 138 | Difference in Rates of materials |
| 139 | Stretch-11 |
| 140 | 10.10 (ii) |
| 141 | 10.13 (ii) |
| 142 | 24.41 |
| 143 | 32.13 |
| 144 | 32.18 |
| 145 | 32.13 |
| 146 | 32.14 |
| 147 | 32.34 |
| 148 | 32.22 |
| 149 | 32.9 (a) |
| 150 | 32.57 |
| 151 | 32.75 5.2 (i) Earth,Surkhi,Sand,earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbish,Earth |
| 152 | Difference in Rates of materials |
| 153 | Stretch-12 |
| 154 | 10.10 (ii) |
| 155 | 10.13 (ii) |
| 156 | 24.41 |
| 157 | 32.13 |
| 158 | 32.18 |
| 159 | 32.13 |
| 160 | 32.14 |
| 161 | 32.34 |
| 162 | 32.22 |
| 163 | 32.9 (a) |
| 164 | 32.57 |
| 165 | 32.75 5.2 (i) Earth,Surkhi,Sand,earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbish,Earth |
| 166 | Difference in Rates of materials |
| 167 | Stretch-13 |
| 168 | 10.10 (ii) |
| 169 | 10.13 (ii) |
| 170 | 24.41 |
| 171 | 32.22 |
| 172 | 32.9 (a) |
| 173 | 32.57 |
| 174 | 32.75 5.2 (i) Earth,Surkhi,Sand,earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbish,Earth |
| 175 | Difference in Rates of materials |
| 176 | Stretch-14 |
| 177 | 10.10 (ii) |
| 178 | 10.13 (ii) |
| 179 | 24.41 |
| 180 | 32.22 |
| 181 | 32.9 (a) |
| 182 | 32.57 |
| 183 | 32.75 5.2 (i) Earth,Surkhi,Sand,earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbish,Earth |
| 184 | Difference in Rates of materials |
| 185 | Stretch-15 |
| 186 | 10.10 (ii) |
| 187 | 10.13 (ii) |
| 188 | 24.41 |
| 189 | 32.22 |
| 190 | 32.9 (a) |
| 191 | 32.57 |
| 192 | 32.75 5.2 (i) Earth,Surkhi,Sand,earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbish,Earth |
| 193 | Difference in Rates of materials |
| 194 | Capital Works ' CSR based Civil Items ( In Rs) 92114117.76000005 Add 5.35% on CSR-Punjab-2022 items on account of change in GST rates for work contracts approved under Agenda item no.1 in the meeting of direction committee of Chief Engineers on dates 28-02-2023 and is issued vide memo No.2433-2452 /CSR dated 02-03-2023 0.0535 4928105.300160003 Total Capital Works Amount after adding 5.35% ( In Rs) 97042223.06016006 Capital Works Non CSR Items ( Part - A)- Civil Stretch-1 |
| 195 | NS Stretch-2 |
| 196 | NS Stretch-3 |
| 197 | NS Stretch-4 |
| 198 | NS Stretch-5 |
| 199 | NS Stretch-6 |
| 200 | NS Stretch-7 |
| 201 | NS Stretch-8 |
| 202 | NS Stretch-9 |
| 203 | RUIDP 2023 10.16.1 Stretch-10 |
| 204 | RUIDP 2023 10.16.1 Stretch-11 |
| 205 | RUIDP 2023 10.16.1 Stretch-12 |
| 206 | RUIDP 2023 10.16.1 Stretch-13 |
| 207 | RUIDP 2023 10.16.1 Stretch-14 |
| 208 | RUIDP 2023 10.16.1 Stretch-15 |
| 209 | RUIDP 2023 10.16.1 Construction of Nature Trail Gate |
| 210 | 12.33 |
| 211 | 12.35 |
| 212 | 17.1 Carriage of materials : 5.2 (i) Earth,Surkhi,Sand,earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbish,Earth |
| 213 | Mirthal |
| 214 | Lohand Khad Difference in Rates of materials : |
| 215 | Mirthal |
| 216 | Gym and Playing Equipments |
| 217 | NS Capital Works ' Non CSR based Civil Items ( In Rs) 8385903.7 Capital Works ( Part - A) \\" Civil \\" CSR based amount after adding 5.35% ( In Rs) 97042223.06016006 Non - CSR based amount ( In Rs) 8385903.7 Total : Part - A ( CIVIL ) CSR + Non CSR Amount : ( Rs) 105428126.76016006 Electrical Works (Lighting) - CBD, Dhuri Sr.No. Item No. Description Unit Quantity Rate (Rs) Rate (Rs. In Words) Amount (Rs.) Supply, Installation, testing and commissioning of the following items complete in all respect and as per scope of work, specification and as required at site: 1. Capital Works ' CSR based Items A Cable, Wire & Accessories; 34.10 D XLPE INSULATED UN-ARMOURED CABLES (LOOSE): Supply, laying and erection of aluminium conductor XLPE insulated PVC sheathedUn-armoured and served cable 1100 volts grade as per IS 7098 (Part-1)1988 tobe laid loose in the existing trench or pipe as per PWD General Specifications:- |
| 218 | (iii) |
| 219 | (xxv) |
| 220 | (xxvii) 34.37 DOUBLE WALLED CORRUGATED (DWC) HDPE PIPES: 34.37 A Supply and erection of Double Walled Corrugated (DWC) HDPE pipe to be laid1mtr. below ground level including excavation placing the pipe in position and back filling with excavated soil etc. of the required size:- |
| 221 | (iii) 34.33 (vii) Supply and erection of SMC Junction Box (Glass Fibre reinforced polyester sheet moulding compound) confirm to IS:14772 (Recessed/ On surface), robustly constructed, safe & shock proof, rust & tamper proof of suitable inner & outer dimensions with ± 10% tolerance in size & hinged water tight cover with locking arrangement having 1No. terminal strip with 4Nos. terminals & 1No. Single pole MCB of required capacity fixed on din bar (Din Bar Provision for 2Nos. MCB's) complete in all respect as approved and desired by the Engineer In-Charge at site:- |
| 222 | (a) 34.09 (xii) Supply and erection of PVC insulated PVC sheathed FR (2Core) round flexiblewire with copper conductor cable (ISI marked) confirm to IS:694/1990 left barein pipe or on surface with cleats of suitable size complete in all respect as desired by the Engineer-in-charge:- |
| 223 | (d) 34.38 C Supply and erection of heavy duty brass single compression gland for cable end termination duly complete with checknuts etc. including making necessary connections. |
| 224 | (viii) |
| 225 | (ix) 34.38 A Supply and erection of heavy duty aluminium thimbles/lugs for cable end termination duly crimped including making necessary connections completely:- |
| 226 | (iii) |
| 227 | (vii) B Provision for Road Crossing (10 No's) of Cables; 34.32 PCC POLES: Supply and erection of pre-stressed cement concrete pole of suitable lengthwith a given planting depth confirming to IS-1678/ 1960/1978 below ground level inexcavated pit of suitable dimensions complete in all respect as approved byEngineer-in-charge at site:- |
| 228 | (i) 34.34 JUMPERS FOR OVERHAED LINES: (iv) Supply & erection of PVC insulated PVC sheathed aluminium conductor singlecore cable for providing jumpering arrangement on overhead lines:- |
| 229 | (a) C Earthing; 34.13 (xv) Earthing earth rod 20 mm dia for providing earth connections upto line earth with G.I. Wire 8 S.W.G. (4mm dia.). The rod shall be tapered at one end and flatted on other end. The hole size 10mm dia shall be drilled on the flatened side for facilitating connection with G.I. wire and thimble etc. The rod shall be erected in ground upto complete length vertically:- |
| 230 | 34.13 (xx) Capital Works 'CSR based Electrical Items' (In Rs) 9393414.600000001 0.0535 502547.68110000005 Add 5.35% on CSR-Punjab-2022 items on account of change in GST rates for work contracts approved under Agenda item no.1 in the meeting of direction committee of Chief Engineers on dates 28-02-2023 and is issued vide memo No.2433-2452 /CSR dated 02-03-2023 Capital Works 'CSR based Electrical Items' after adding 5.35% (In Rs) 9895962.281100001 2.Capital Works ' Non-CSR based Items A Feeder Pillars; |
| 231 | NS B Decorative Lighting Poles; |
| 232 | NS C LED Post Top Lighting Fixture for Pole Lighting; NS Providing & Fixing of IK08 IP65 protected Top/Bottom mounted LED Post top Luminarie made of single piece construction powder coated die cast alluminium housing with UV stabalized Clear / frosted Polycarbonate diffuser and Aluminium anodised with sand blast reflector. The System level Luminous efficacy ≥ 100 Lumen/W. SMD LEDs is to be used, System CRI>70, CCT: 3000/4000/6500 K. The integral electronic driver must be potted & has a unique BIS R number must be potted & has a unique BIS R number constant current and Internal/external surge protection device of min. 4KV(L- N) and efficiency > 85%, PF>0.9, THD<10% and input Voltage range of 140-270V AC at 50Hz. System life of 50000 Burning hours with 70% of Initial Lumens maintained . Driver current <750mA. Fixture must be in compliance with BIS Standards and Trade mark Certificate complete in all respect.OEM Must have its own in house NABL lab setup for all testing facilities for LED fixtures. (LM79/LM80) Certificate/ report with liable warranty of product/accessories from OEM shall be submitted. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . |
| 233 | Capital Works 'Non CSR based Electrical Items' (In Rs) 7461478.0 Total : (Electrical) CSR + Non CSR Amount : (Rs) 17357440.2811 Operation & Maintenance S.no. CSR Ref. Description Unit Qty Rate (Rs) Rate (Rs. In Words) Amount(Rs) 5 Years' Operation & Maintenance Cost (PART-B) |
| 234 | NS 5 Years' Operation & Maintenance Cost ( Part - C) 8646319.2 |