| 1 | LABOUR |
| 2 | (503) Dismantling one damaged 11kVPSC/RCC pole after disconnecting stays,strut etc. attached thereon and stackingthe same. |
| 3 | (513) Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 4 | (519) Dismantling one damaged AB switch from existing structure and bringing back to section store. |
| 5 | (516) Dismantling (without damage) oneChannel cross arm from existing DPstructure and bringing back to sectionstore. |
| 6 | (515) Dismantling (without damage) one V cross arm/Channel cross arm from existing Pole and bringing back to section store. |
| 7 | (703) Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 8 | (726) Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading&unloading charges. |
| 9 | (113) Fitting and erecting one HT A typeSingle Pole in position, including fittingcross arm, digging and back filling pit inordinary soil (as per standards), drawingsufficient length of GI earthing leadsfrom F clamp through V cross arm to theground for earthing (excluding provisionof earthing). |
| 10 | (112) Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 11 | (172) Fitting one Additional 2.4/3m Channel cross arm (75x40x6mm), in existing11kV DP including conveyance ofmaterials. |
| 12 | (170) Fitting one Additional 75x40mm, 1.8mChannel cross arm in existing single poleincluding conveyance of materials. |
| 13 | (169) Fitting one Additional V cross arm inexisting single pole includingconveyance of materials. |
| 14 | (167) Fitting one set AB switch on existingDP, giving connection and drawingsufficient length of GI earthing leads tothe ground for earthing, excludingprovision of earthing. |
| 15 | (135) Stringing of one km 11kV line withACSR Raccoon (3 conductors) afterfitting insulators and giving jumperconnections including cutting andremoving tree branches wherevernecessary excluding cut point works. |
| 16 | (215) Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral & Street Main, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary andconveyance of all materials (exceptpoles) from stacking place. |
| 17 | (937) Dismantling the faulty cable end from the structure/pole after disconnecting11kV jumper connections and mountingthe same after redoing End terminationand giving jumper connections.(excluding end termination). |
| 18 | (938) Excavation of cable trench formaintenance of cable in all classes ofsoil including breaking clods, watering,ramming and sectioning of soil bank etc.and back filling the soil after cablelaying and consolidating the soil inlayers of 75cm (excluding laying ofcable). |
| 19 | (11020) Dismantling of 11 kV Aerial bunched cable XLPE insulated of size 3 x 120+ 1 x 95 sqmm with bare insulated Messenger |
| 20 | (1102) Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm withbare/insulated Messenger throughexisting poles |
| 21 | (933) Doing one cable end termination on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally after making fencing,caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 22 | (931) Doing straight joint on HT XLPE UGcables of sizes beyond 3x185 sqmm andupto and including 3x300 sq mm usingthe cable jointing kit supplieddepartmentally as per specification afterproviding proper traffic signalling andcaution board fencing etc. wherevernecessary, including charges for cablejointer and other sundries etc. as per thedirection of departmental officers at site. |
| 23 | (934) Mounting and connecting HT XLPE UG cable ends of all sizes upto and including 3x300 sq mm with special type cable clamps, bolts, nuts, terminal protectors etc.including cost of extra materials if needed and giving necessary jumper connections. |
| 24 | (115) Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 25 | (C-202324-4567-16) Doing Horizontal Directional Drilling (HDD) along and across roads, supplying125mm HDPE pipe duct for drawing XLPE UG cable upto the size of 3 X 300 sq mm, through the duct including surveying the route for other utilities like cables, pipes etc and making inspection pits. |
| 26 | (929) Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/ culverts /bridges etc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling. |
| 27 | (119) Fitting and providing one HT Stay for 11kV pole, including digging and backfilling pit in ordinary soil. |
| 28 | (414) Re-joining one snapped LT conductor after removing damaged portion including Reshackling and conveyance of all materials complete. |
| 29 | (405) Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole. |
| 30 | (334) Re-joining one snapped HT conductor after removing damaged portion including re-tensioning and conveyance of all materials complete. |
| 31 | (163) Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns)including digging separate pit(0.45x0.45x1.5m) at standard distanceaway from the pole/structure in ordinarysoil & backfilling. |
| 32 | (952) Providing concrete muffing of size0.45x0. 45x1.5m (0.5m above GL and1m below GL). Excavation0.45x0.45x1m, concrete (1:3:6, 20mm)0.45x0.45x1.5m, Plastering (1:3) 12mm0.45x0.45mx5sides. |
| 33 | (702) Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 34 | (363) Drilling hole of various sizes on existing Channel/Cross Arm. |
| 35 | (30.1) Stringing of one km 3 PH 11kV linewith XLPE Insulated ACSR Raccoon orequivalant (3 conductors) after fittinginsulators, binding conductors to pininsulators using suitable tie andanchoring with wedge type anchoringclamps including cutting and removingtree branches wherever necessaryexcluding cut point works. |
| 36 | (C-202324-4572-1) Steel work in sigle section with GIangle,flat,plate tresses etc.including cutting, hoisting, fixing in position and applying a priming coat of approved steel prime including welding and bolted with special shaped washers etc complete. |
| 37 | (116) Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 38 | (158) Providing one Driven Earth using GIearth pipe of size 38.1mm dia, 2.5mlength at minimum distance of 1.5maway from the pole/structure andmaintaining standard distance betweendifferent earth pipes in loose soil. |
| 39 | Total of BoQ1 Please Enable Macros to View BoQ information |