| 1 | Supply of Wind Turbine Generators (WTGs) mainly comprising of Nacelle, Hub and Controller with associated hardware/materials, components of Renewable Energy Device –Wind Mill complete in all respect. |
| 2 | Supply of Rotor Blades (Set of 3 nos.) of Wind Turbine Generators (WTGs). Components of Renewable Energy Device-Wind Mill complete in all respect. |
| 3 | Supply of Tubular Tower suitable for Wind Turbine Generators (WTGs) of rated capacity, component of renewable Energy Device-Wind Mill complete in all respect. |
| 4 | Supply of copper wound Transformer with all fittings and first filling of Transformer Oil, Component of Renewable Energy Device – Wind Mill complete in all respect. |
| 5 | Power Evacuation System including SCADA, metering control and protection system, switchgear. |
| 6 | Miscellaneous other items like wind mast, grounding system etc. |
| 7 | Civil Works including Land development, WTGs Foundations, Transformer platforms & other civil works allied to installation of WTGs |
| 8 | Erection and Commissioning of Tower, Nacelle, Blades, Control Panels and other WTG equipment. |
| 9 | Providing related Electrical Works of renewable energy devices in respect of wind farm project for WTG viz. 33 kV electrical lines & DP VCB Yard works. |
| 10 | Power Evacuation infrastructure from WTG at site to main grid including statutory approvals/permits etc. |
| 11 | Providing Comprehensive Operation and Maintenance for the period of 05 years including defect liability period from the date of commissioning of plant. |
| 12 | Total of Schedule 1:Ex works Supply for “Engineering, Procurement and Construction (EPC) contract for Setting up of 7.8 MW (±5%) Wind Power Project in Agali, Dist. Palakkad (Kerala) with comprehensive O&M of 5 years” complete in all respects supplied within India. |
| 13 | Total of Schedule 2:Local Transportation, Port handling, Insurance, Erection, Testing and commissioning “Engineering, Procurement and Construction (EPC) contract for Setting up of 7.8 MW (±5%) Wind Power Project in Agali, Dist. Palakkad (Kerala) with comprehensive O&M of 5 years” complete in all respect. |
| 14 | Total of Schedule 3:Comprehensive Operation & Maintenance Charges for “Engineering, Procurement and Construction (EPC) contract for Setting up of 7.8 MW (±5%) Wind Power Project in Agali, Dist. Palakkad (Kerala) with comprehensive O&M of 5 years”. |
| 15 | 7.8 (±5%) MW capacity wind power project |
| 16 | Total Project cost of SCHEDULE-4 (GRAND SUMMARY) in INR |
| 17 | Total Generation in units as per SCHEDULE–5 |
| 18 | Bid price per units of generation Please Enable Macros to View BoQ information |