| 1 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. |
| 2 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. |
| 3 | With rapid setting bitumen emulsionOn bituminous surface @ 0.25kg/sqm |
| 4 | Providing and fixing Glow studs of size 100x20 mm made of heavy duty body shall be moulded ASA (Acrylic styrene Acryloretrite ) or HIP (High impact polystyrene) or ABS having electronically welded micro- prismatic lens with abrasion resistant coating as approved by Engineer in charge. The glow stud shall support a load of 13635 kg tested in accordance with ASTM D4280. The slope of retro- reflective surface shall be 35 (+/- 5) degress to base .The reflective panels on both sides with at least 12 cm of reflective area up each side. The luminance intensity should be as per the specification and shall be tested as described in ASTM I: 809 as recommended in BS: 873 part 4 : 1973. The studs shall be fixed to the Road surface using the adhesive conforming to IS, as per procedure recommended by the manufacturer complete and as per direction of Engineer-in-charge. |
| 5 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. |
| 6 | 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.50% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. |
| 7 | Providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. |
| 8 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer- in-Charge. |
| 9 | With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 |
| 10 | Providing and laying Bitumen Penetration Macadam with hard stone aggregate of quality, size and grading as specified, with bitumen of suitable penetration grade including required key aggregate as specified, spreading coarse aggregate with the help of self propelled / tipper tail mounted aggregate spreader and applying bitumen by a pressure distributor and then spreading key aggregate with the help of aggregate spreader complete including consolidation with road roller of minimum 8 to 10 tonne capacity to achieve specified values of compaction and surface accuracy: |
| 11 | For 50mm compacted thickness using coarse aggregateof size 50-20 mm graded @ 0.60 cum per 10 sqm keyaggregate of size 12.5 mm graded @ 0.15 cum per 10sqm. With paving asphalt grade VG - 10 @ 100 kg/cum. (For Pot hole repairing and depression). |
| 12 | Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. |
| 13 | 40/50 mm compacted thickness with bitumen of grade VG- 30 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) and waste plastic additive @ 8% (percentage by weight of bitumen) prepared in drum Type Hot Mix Plant of 60-90 TPH capacity. |
| 14 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. |
| 15 | Ordinary rock |
| 16 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lif. |
| 17 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 18 | 1:2:4 (1 Cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 19 | 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 20 | 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 21 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: |
| 22 | 1:2:4 (1 Cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 23 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : |
| 24 | 1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 25 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: |
| 26 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 27 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 28 | Centering and shuttering including strutting, propping etc. and removal of form for |
| 29 | Foundations, footings, bases of columns, etc. for mass concrete |
| 30 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 31 | Suspended floors, roofs, landings, balconies and access platform |
| 32 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 33 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 34 | 12 mm cement plaster of mix: |
| 35 | 1:4(1 cement: 4 fine sand) |
| 36 | 12 mm cement plaster finished with a floating coat of neat cement of mix: |
| 37 | 1:3(1 cement: 3 fine sand) |
| 38 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 39 | Nominal concrete 1:3:6 or richer mix (including equivalent design mix) |
| 40 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 41 | Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, including cleaning the surface of ail dirt, scales, oil, grease and other foreign material etc. and lining out complete. |
| 42 | New work (Two or more coats) |
| 43 | Providing temporary diversion by banking excavated earth in layers not exceeding 20 cm in depth compacting with wooden or steel rammers & rolling every 3rd & top most layer with power roller of minimum 8 tonnes & dressing up in embankments for roads flood bank. Marginal banks & guide banks etc with a lead of 3.00 km |
| 44 | All kind of soil |
| 45 | Providing and laying non-pressure NP2 (Light duty) RCC pipes with collers joints with cement mortor 1:2 (1 cement :2 coarse sand) for acess of water for temporary divarsion i/c taking out & shifting the same from site & taken back by the Agency for reuse after completion of permanent structure as per the direction of Engineer-in-charge. |
| 46 | 900mm dia R.C.C pipe |
| 47 | Dismantling of RCC hump pipe culvert/shaft including excavating the existing pavement & earth cushion completely & taking out the RCC pipe, stacking of serviceable materials at site and disposal of unserviceable materials within 50 mtrs lead etc. as per the direction of Engineer –in-charge. |
| 48 | Total of A(Sum of total amount) |
| 49 | 05 Year Maintenance Provision |
| 50 | For 1st Year 0.25% of 70494485.80 |
| 51 | For 2nd Year 1.00% of 70494485.80 |
| 52 | For 3rd Year 1.50% of 70494485.80 |
| 53 | For 4th Year 2.00% of 70494485.80 |
| 54 | For 5th Year 2.75% of 70494485.80 |
| 55 | Total of B (05 Year Maintenance Provision) Total of A+B Please Enable Macros to View BoQ information |