| 1 | Total value of work |
| 2 | SCHEDULE-I DSR Items-Services |
| 3 | DSR-2018 Item:1.1.2(i) |
| 4 | DSR-2018 Item:2.1.1 |
| 5 | DSR-2018 Item:2.6.1 |
| 6 | DSR-2018 Item:2.8.1 |
| 7 | DSR-2018 Item:2.10.1.1 |
| 8 | DSR-2018 Item:2.10.1.3 |
| 9 | DSR-2018 Item:2.25 |
| 10 | DSR-2018 Item:2.28.1 |
| 11 | DSR-2018 Item:2.29.1 |
| 12 | DSR-2018 Item:2.32 |
| 13 | DSR-2018 Item:2.36 |
| 14 | DSR-2018 Item:4.1.3 |
| 15 | DSR-2018 Item:4.1.5 |
| 16 | DSR-2018 Item:4.1.8 |
| 17 | DSR-2018 Item:4.2.3 |
| 18 | DSR-2018 Item:4.2.5 |
| 19 | DSR-2018 Item:4.3.1 |
| 20 | DSR-2018 Item:4.3.3 |
| 21 | DSR-2018 Item:5.1.2 |
| 22 | DSR-2018 Item:5.1.3 |
| 23 | DSR-2018 Item:5.2.2 |
| 24 | DSR-2018 Item:5.9.1 |
| 25 | DSR-2018 Item:5.9.3 |
| 26 | DSR-2018 Item:5.9.5 |
| 27 | DSR-2018 Item:5.9.6 |
| 28 | DSR-2018 Item:5.12 |
| 29 | DSR-2018 Item:5.22.6 |
| 30 | DSR-2018 Item:5.22A.6 |
| 31 | DSR-2018 Item:5.23 |
| 32 | DSR-2018 Item:5.29.2.2 |
| 33 | DSR-2018 Item:5.43.1 |
| 34 | DSR-2018 Item:6.1.2 |
| 35 | DSR-2018 Item:6.4.2 |
| 36 | DSR-2018 Item:6.13.1 |
| 37 | DSR-2018 Item:6.15 |
| 38 | DSR-2018 Item:8.1.1.2 |
| 39 | DSR-2018 Item:8.2.1.2 |
| 40 | DSR-2018 Item:8.2.2.2 |
| 41 | DSR-2018 Item:8.3.1 |
| 42 | DSR-2018 Item:8.3.2 |
| 43 | DSR-2018 Item:8.5 |
| 44 | DSR-2018 Item:8.6 |
| 45 | DSR-2018 Item:8.31 |
| 46 | DSR-2018 Item:9.5.1.1 |
| 47 | DSR-2018 Item:9.7.5.3 |
| 48 | DSR-2018 Item:9.7.5.4 |
| 49 | DSR-2018 Item:9.7.7.1 |
| 50 | DSR-2018 Item:9.7.7.2 |
| 51 | DSR-2018 Item:9.12 |
| 52 | DSR-2018 Item:9.17.1 |
| 53 | DSR-2018 Item:9.20.1 |
| 54 | DSR-2018 Item:9.21.1 |
| 55 | DSR-2018 Item:9.21.2 |
| 56 | DSR-2018 Item:9.48.2 |
| 57 | DSR-2018 Item:9.51.1 |
| 58 | DSR-2018 Item:9.59.1 |
| 59 | DSR-2018 Item:9.83 |
| 60 | DSR-2018 Item:9.84 |
| 61 | DSR-2018 Item:9.103 |
| 62 | DSR-2018 Item:9.120.1 |
| 63 | DSR-2018 Item:9.123 |
| 64 | DSR-2018 Item:9.124.2 |
| 65 | DSR-2018 Item:9.127.2 |
| 66 | DSR-2018 Item:9.134.1.2.1 |
| 67 | DSR-2018 Item:9.151 |
| 68 | DSR-2018 Item:10.1 |
| 69 | DSR-2018 Item:10.2 |
| 70 | DSR-2018 Item:10.3 |
| 71 | DSR-2018 Item:10.5.1 |
| 72 | DSR-2018 Item:10.5.2 |
| 73 | DSR-2018 Item:10.13.1 |
| 74 | DSR-2018 Item:10.16.2 |
| 75 | DSR-2018 Item:10.19 |
| 76 | DSR-2018 Item:10.20 |
| 77 | DSR-2018 Item:10.22 |
| 78 | DSR-2018 Item:10.25.1 |
| 79 | DSR-2018 Item:10.25.2 |
| 80 | DSR-2018 Item:10.26.1 |
| 81 | DSR-2018 Item:10.28 |
| 82 | DSR-2018 Item:11.20.2 |
| 83 | DSR-2018 Item:11.23.1 |
| 84 | DSR-2018 Item:11.24 |
| 85 | DSR-2018 Item:11.25 |
| 86 | DSR-2018 Item:11.26.1 |
| 87 | DSR-2018 Item:11.27 |
| 88 | DSR-2018 Item:11.31 |
| 89 | DSR-2018 Item:11.37 |
| 90 | DSR-2018 Item:11.37A |
| 91 | DSR-2018 Item:11.40 |
| 92 | DSR-2018 Item:11.41.2 |
| 93 | DSR-2018 Item:11.41.3 |
| 94 | DSR-2018 Item:11.42 |
| 95 | DSR-2018 Item:11.43 |
| 96 | DSR-2018 Item:11.46.2 |
| 97 | DSR-2018 Item:12.25.1 |
| 98 | DSR-2018 Item:12.26.1 |
| 99 | DSR-2018 Item:12.41.1 |
| 100 | DSR-2018 Item:12.41.2 |
| 101 | DSR-2018 Item:12.42.1.1 |
| 102 | DSR-2018 Item:12.42.1.2 |
| 103 | DSR-2018 Item:12.42.4.1 |
| 104 | DSR-2018 Item:12.42.4.2 |
| 105 | DSR-2018 Item:12.45.1 |
| 106 | DSR-2018 Item:12.50 |
| 107 | DSR-2018 Item:12.51.1 |
| 108 | DSR-2018 Item:12.51.6 |
| 109 | DSR-2018 Item:13.4.2 |
| 110 | DSR-2018 Item:13.5.2 |
| 111 | DSR-2018 Item:13.7.2 |
| 112 | DSR-2018 Item:13.8.2 |
| 113 | DSR-2018 Item:13.16.1 |
| 114 | DSR-2018 Item:13.18 |
| 115 | DSR-2018 Item:13.37.1 |
| 116 | DSR-2018 Item:13.41.1 |
| 117 | DSR-2018 Item:13.43.1 |
| 118 | DSR-2018 Item:13.44.1 |
| 119 | DSR-2018 Item:13.45.1 |
| 120 | DSR-2018 Item:13.46.1 |
| 121 | DSR-2018 Item:13.50.3 |
| 122 | DSR-2018 Item:13.61.1 |
| 123 | DSR-2018 Item:13.63.1 |
| 124 | DSR-2018 Item:13.71 |
| 125 | DSR-2018 Item:13.80 |
| 126 | DSR-2018 Item:13.82.1 |
| 127 | DSR-2018 Item:13.82.2 |
| 128 | DSR-2018 Item:13.85.1 |
| 129 | DSR-2018 Item:13.85.3 |
| 130 | DSR-2018 Item:13.88 |
| 131 | DSR-2018 Item:13.90.1 |
| 132 | DSR-2018 Item:13.91 |
| 133 | DSR-2018 Item:13.92.1 |
| 134 | DSR-2018 Item:13.99.1 |
| 135 | DSR-2018 Item:13.100.1 |
| 136 | DSR-2018 Item:13.104.1 |
| 137 | DSR-2018 Item:13.109.1 |
| 138 | DSR-2018 Item:13.111.1 |
| 139 | DSR-2018 Item:13.112.1 |
| 140 | DSR-2018 Item:13.114 |
| 141 | DSR-2018 Item:14.1.1 |
| 142 | DSR-2018 Item:14.4.1 |
| 143 | DSR-2018 Item:14.39 |
| 144 | DSR-2018 Item:15.2.1 |
| 145 | DSR-2018 Item:15.2.2 |
| 146 | DSR-2018 Item:15.3 |
| 147 | DSR-2018 Item:15.5 |
| 148 | DSR-2018 Item:15.7.4 |
| 149 | DSR-2018 Item:15.8.3 |
| 150 | DSR-2018 Item:15.13.1 |
| 151 | DSR-2018 Item:15.17.2 |
| 152 | DSR-2018 Item:15.23.1 |
| 153 | DSR-2018 Item:16.3.2 |
| 154 | DSR-2018 Item:16.3.3 |
| 155 | DSR-2018 Item:16.3.9 |
| 156 | DSR-2018 Item:16.3.10 |
| 157 | DSR-2018 Item:16.13.1 |
| 158 | DSR-2018 Item:16.18.1 |
| 159 | DSR-2018 Item:16.19 |
| 160 | DSR-2018 Item:16.43.1 |
| 161 | DSR-2018 Item:16.46.1 |
| 162 | DSR-2018 Item:16.48.2 |
| 163 | DSR-2018 Item:16.59.1 |
| 164 | DSR-2018 Item:16.59.2 |
| 165 | DSR-2018 Item:16.68 |
| 166 | DSR-2018 Item:16.69 |
| 167 | DSR-2018 Item:16.70.1 |
| 168 | DSR-2018 Item:16.79 |
| 169 | DSR-2018 Item:16.83 |
| 170 | DSR-2018 Item:16.84 |
| 171 | DSR-2018 Item:16.91.1 |
| 172 | DSR-2018 Item:17.1.1 |
| 173 | DSR-2018 Item:17.2.1 |
| 174 | DSR-2018 Item:17.3.1 |
| 175 | DSR-2018 Item:17.5.1 |
| 176 | DSR-2018 Item:17.5.2 |
| 177 | DSR-2018 Item:17.5.3 |
| 178 | DSR-2018 Item:17.7.4 |
| 179 | DSR-2018 Item:17.8 |
| 180 | DSR-2018 Item:17.10.1.1 |
| 181 | DSR-2018 Item:17.10.2.2 |
| 182 | DSR-2018 Item:17.13.1 |
| 183 | DSR-2018 Item:17.18.1 |
| 184 | DSR-2018 Item:17.19.1 |
| 185 | DSR-2018 Item:17.23 |
| 186 | DSR-2018 Item:17.25.2 |
| 187 | DSR-2018 Item:17.25.6 |
| 188 | DSR-2018 Item:17.39.1.3 |
| 189 | DSR-2018 Item:17.39.2.3 |
| 190 | DSR-2018 Item:17.42.1.3 |
| 191 | DSR-2018 Item:17.42.2.3 |
| 192 | DSR-2018 Item:17.44.1.3 |
| 193 | DSR-2018 Item:17.44.2.3 |
| 194 | DSR-2018 Item:17.46.1.3 |
| 195 | DSR-2018 Item:17.48.1.3 |
| 196 | DSR-2018 Item:17.49.1.3 |
| 197 | DSR-2018 Item:17.50.1.1 |
| 198 | DSR-2018 Item:17.57A.1.1 |
| 199 | DSR-2018 Item:17.57A.1.2 |
| 200 | DSR-2018 Item:18.7.2 |
| 201 | DSR-2018 Item:18.7.3 |
| 202 | DSR-2018 Item:18.8.1 |
| 203 | DSR-2018 Item:18.8.2 |
| 204 | DSR-2018 Item:18.9.2 |
| 205 | DSR-2018 Item:18.9.3 |
| 206 | DSR-2018 Item:18.9.4 |
| 207 | DSR-2018 Item:18.9.5 |
| 208 | DSR-2018 Item:18.9.6 |
| 209 | DSR-2018 Item:18.12.1 |
| 210 | DSR-2018 Item:18.12.2 |
| 211 | DSR-2018 Item:18.12.6 |
| 212 | DSR-2018 Item:18.12.8 |
| 213 | DSR-2018 Item:18.13.1 |
| 214 | DSR-2018 Item:18.13.2 |
| 215 | DSR-2018 Item:18.18.1 |
| 216 | DSR-2018 Item:18.18.2 |
| 217 | DSR-2018 Item:18.48A |
| 218 | DSR-2018 Item:18.77 |
| 219 | DSR-2018 Item:19.6.2 |
| 220 | DSR-2018 Item:19.6.4 |
| 221 | DSR-2018 Item:19.6.7 |
| 222 | DSR-2018 Item:19.18.2 |
| 223 | DSR-2018 Item:19.20 |
| 224 | DSR-2018 Item:21.1.1.1 |
| 225 | DSR-2018 Item:21.1.1.2 |
| 226 | DSR-2018 Item:21.3.1 |
| 227 | DSR-2018 Item:21.3.2 |
| 228 | DSR-2018 Item:21.3.3 |
| 229 | DSR-2018 Item:21.4.1 |
| 230 | DSR-2018 Item:21.8.1 |
| 231 | DSR-2018 Item:21.11.3 |
| 232 | DSR-2018 Item:21.16.2 |
| 233 | DSR-2018 Item:21.17 |
| 234 | DSR-2018 Item:22.1.1 |
| 235 | DSR-2018 Item:22.2.1 |
| 236 | DSR-2018 Item:22.3 |
| 237 | DSR-2016 Item:23.9 |
| 238 | SCHEDULE-II NON-DSR-ITEMS-SERVICES |
| 239 | Hiring charges of vibratory roller 8 to |
| 240 | Hiring charges of Motor Grader |
| 241 | Hiring charges of JCB alongwith dri |
| 242 | Supply of tractor as and when requi |
| 243 | Hiring of cultivator on as and when |
| 244 | Supply of Hydra on hire at TLCMP |
| 245 | De-sludging and cleaning of septic |
| 246 | Removal of choke from internal /ext |
| 247 | Supply of welding machine |
| 248 | Supplying and Filling locally avail |
| 249 | Supplying and filling in under floo |
| 250 | Repairing and servicing of Rolling |
| 251 | Rubbing and polishing of existing f |
| 252 | Providing and injecting approved ep |
| 253 | Providing and fixing 12 mm thick To |
| 254 | Supplying & laying of granular sub |
| 255 | Providing & fixing good quality acr |
| 256 | Providing & fixing (Garware/Vkool m |
| 257 | Arresting of water leakage of under |
| 258 | leaking of chockage of p trap,WC, K |
| 259 | Attending flush tank of porcelean, |
| 260 | Removing and re-fixing the wash bas |
| 261 | Attending Misc. cement patch works |
| 262 | Deduct for using PPC over OPC-43 |
| 263 | Add for using fly ash brick |
| 264 | Providing and fixing of SS finish d |
| 265 | Providing and fixing of SS finish d |
| 266 | Providing and fixing of SS finish d |
| 267 | Providing and fixing of SS finish d |
| 268 | Providing and fixing of SS finish d |
| 269 | Repairing of borewell. Including pr |
| 270 | Cleaning of over head water tanks h |
| 271 | Cleaning of under ground water tank |
| 272 | SCHEDULE -III SUPPLY ITEMS |
| 273 | Supply of white vitreous china WC |
| 274 | Supply of white vitreous china Urinals |
| 275 | Supply of White vitreous China Wash basi |
| 276 | Supply of 15mm CP health faucet (for abl |
| 277 | Supply of Angular Stop Cock with Wall Fl |
| 278 | Supply of Two Way Bib Cock with Wall Fla |
| 279 | Supply of Oval/ square/ circular shape T |
| 280 | Single Lever Basin Mixer with 200 mm Ext |
| 281 | Supply of CP brass Towel Ring of approve |
| 282 | Supply of 600mm Long Single Towel Rail w |
| 283 | Supply of Bath Mixer (Jaquar make) consi |
| 284 | Supply of 600mm long Towel Rack with Low |
| 285 | Supply of Soap Dish Holder of approved m |
| 286 | Supply of 450 mm long Braded Hose Pipe o |
| 287 | Supply of 450 mm long Braded Hose Pipe o |
| 288 | Supply of Overhead Shower of Jaquar (Cat |
| 289 | Supply of Hand Shower of Jaquar (Cat . N |
| 290 | Supply of CP Brass Soap Dispenser of Jaq |
| 291 | Supply of Double Arm wall mounted Mirror |
| 292 | Supply of 600 mm long Glass Shelf of Jaq |
| 293 | Supply of 15 mm CP Pillar tap (FLR-5011N |
| 294 | Supply of 15 mm pressmatic CP Pillar tap |
| 295 | Supply of 15 mm CP wall mounted Sink Mix |
| 296 | Supply of 15 mm CP wall mounted Sink Coc |
| 297 | Supply of 15 mm CP basin Mixer (FLR-5001 |
| 298 | Supply of of 2 in 1 CP wall Mixer with 1 |
| 299 | Supply of CP brass stop cock (consealed) |
| 300 | Supply of CP brass Robe Hook (ACN-1161N |
| 301 | Supply of Acid for Cleaning purpose |
| 302 | Supply of SS Kitchen sink waste coupling |
| 303 | Supply of stainless steel floor drain st |
| 304 | Supply of Solid plastic seat cover with |
| 305 | Supply of Low level cistern made of vitr |
| 306 | Supply of 600x450 mm beveled edge mirror |
| 307 | Supply of Hubless centrifugally cast (sp |
| 308 | Supply of Hubless centrifugally cast (sp |
| 309 | Supply of M.S. holder-bat clamps of appr |
| 310 | Supply of M.S. holder-bat clamps of appr |
| 311 | Supply of SS 304 grade coupling with EPD |
| 312 | Supply of SS 304 grade coupling with EPD |
| 313 | Supply of plain bend of required degree |
| 314 | Supply of plain bend of required degree |
| 315 | Supply of single equal plain junction of |
| 316 | Supply of single equal plain junction of |
| 317 | Supply of double unequal plain junction |
| 318 | Supply of single unequal plain junction |
| 319 | Supply of double equal plain invert bran |
| 320 | Supply of single equal plain invert bran |
| 321 | Supply of single equal plain invert bran |
| 322 | Supply of single unequal plain invert br |
| 323 | Supply of terminal guard :Hubless centri |
| 324 | Supply of non-pressure NP2 class (light |
| 325 | Supply of Manhole CI cover with frame (l |
| 326 | Supply of all type of CPVC fitings like |
| 327 | Supply of teflon tape for plumbing work |
| 328 | Supply of M- Seal of 100 gm. Pack |
| 329 | Supply of heavy duty PTMT float valve/Ba |
| 330 | Supply of 20 mm CPVC plumbing Pipe of ma |
| 331 | Supply of 25 mm CPVC plumbing Pipe of ma |
| 332 | Supply of 32 mm CPVC plumbing Pipe of ma |
| 333 | Supply of 40 mm CPVC plumbing Pipe of ma |
| 334 | Supply of 50 mm CPVC plumbing Pipe of ma |
| 335 | Supply of CPVC ball valve-20mm of make f |
| 336 | Supply of CPVC ball valve-25mm of make f |
| 337 | Supply of CPVC ball valve-32mm of make f |
| 338 | Supply of CPVC ball valve-40mm of make f |
| 339 | Supply of CPVC ball valve-50mm of make f |
| 340 | Supply of GI pipe 50 mm nominal dia of m |
| 341 | Supply of G.I. Union 50 mm nominal dia o |
| 342 | Supply of CPVC adhesive for Plumbing mai |
| 343 | Supply of heavy duty PVC connection pipe |
| 344 | Supply of heavy duty collapsible PVC was |
| 345 | Supply of CP brass extension nipple of a |
| 346 | Supply of PTMT - Bottle Trap 31/32 mm of |
| 347 | Supply of Lid/top cover for PVC water ta |
| 348 | Supply of bleaching powder |
| 349 | Supply of PTMT Stop cock 15 mm ( Female |
| 350 | Supply of PTMT Stop cock 15 mm (Male thr |
| 351 | -Supply of PTMT Stop cock 15 mm ( Female |
| 352 | Supply of PTMT Stop cock 20mm ( Female t |
| 353 | Supply of PTMT Pillar Cock swan neck of |
| 354 | Supply of washing machine tap of PTMT Pr |
| 355 | Supply of borewell cap |
| 356 | supplying and providing Submersible pump |
| 357 | Supply of PVC - Pipe 2'' Min. 20kgf/sqcm |
| 358 | Supply of Submersible wire (make Finolex |
| 359 | Supply of MS Borewell clamp |
| 360 | Supply of borewell MS bend pipe |
| 361 | Supply of ultra clear 180 degree round d |
| 362 | Supply of stainless steel wire mesh/jali |
| 363 | Supply of 18 mm thick Ply wood ISI mar |
| 364 | Supply of 18 inch long heavy duty zinc c |
| 365 | Supply of Fevicol sythetic resin adhesiv |
| 366 | Supply of Araldite standard epoxy adhesi |
| 367 | Supply of CGI sheet 0.5mm to 1.2mm |
| 368 | Suppply of Anodised Aluminium Aldrop-300 |
| 369 | Supply of Anodised Aluminium Aldrop-250 |
| 370 | Supply of Hydraulic door closer (heavy d |
| 371 | Supply of Chromium plated Brass handles |
| 372 | Supply of Chromium plated Brass handles- |
| 373 | Supply of Chromium plated Brass handles- |
| 374 | Supply of Anodised Aluminium handles 125 |
| 375 | Supply of Anodised Aluminium handles 100 |
| 376 | Supply of Anodised Aluminium handles 75m |
| 377 | Supply of Stainless steel butt hinges 12 |
| 378 | Supply of Stainless steel butt hinges 10 |
| 379 | Supply of Stainless steel butt hinges 75 |
| 380 | Supply of 1 mm thick 35 mm wide bright f |
| 381 | Supply of Oxidised mild steel bright fin |
| 382 | Supply of Brass tower bolt (barrel type |
| 383 | Supply of Brass tower bolt (barrel type |
| 384 | Supply of Aluminium hanging floor door s |
| 385 | Supply of Magnetic catcher double strip |
| 386 | Supply Teak Wooden Biding/lipping 25mmX6 |
| 387 | Supply of Wardrobe lock with all necessa |
| 388 | Supply of sun control film of standard q |
| 389 | Supply of heavy duty SS curtain rod 25mm |
| 390 | Supply of heavy duty bracket/clamp for 2 |
| 391 | Supply of aluminium glazing bead |
| 392 | Supply of 18 mm thick particle board of |
| 393 | Supply of liquid sealent-holdtite/ drips |
| 394 | Supply of 10 mm thick cement fibre board |
| 395 | Supply of EPDM rubber of good quality |
| 396 | Providing & Fixing 12mm mild steel U bea |
| 397 | Supply of Neoprine/PVC gasket for Alu Do |
| 398 | Supply of laminated sheet of plain / woo |
| 399 | Supply of lime powder for marking on gro |
| 400 | Supply of Birla white or JK wall putty, |
| 401 | Supply of Ultratech cement PPC Cement in |
| 402 | Supply of cement grout material (free fl |
| 403 | Supply of white cement (JK white, Birla |
| 404 | Supply of Water Proofing materials of M/ |
| 405 | Supply of crack sealing compound for cra |
| 406 | Supply of high strength bonding agent li |
| 407 | Supply of water based curing compund (Ma |
| 408 | Supply of Dr. Fixit or equivalent weathe |
| 409 | Supply of Paving bitumen/bitumen emulsio |
| 410 | Supply of Granite stone of colour as ins |
| 411 | Supply of Agaria white marble slab plain |
| 412 | Supply of Agaria white marble slab plain |
| 413 | Supp.of Kota stone minimum 18mm thick (m |
| 414 | Supply of Epoxy paint of any colour as p |
| 415 | Supply of Linseed oil (double boiled) as |
| 416 | Supply of ISI mark water proof plywood-6 |
| 417 | Supply of ISI mark water proof plywood-1 |
| 418 | Supply of min. 12 mm thick Gypsum plaste |
| 419 | Supply of polycarbonate sheet of good qu |
| 420 | Supply of float glass 5mm (weight not le |
| 421 | Supply of Glass blur sheet of good quali |
| 422 | Supply of good quality ready mix cold as |
| 423 | Supply of 3 mm thick exterior grade fini |
| 424 | Manufacturing, Supplying and fixing of P |
| 425 | Supply of RCC pipe 450 mm dia NP-3 spigo |
| 426 | Supply of Stone Aggregate-20mm |
| 427 | Supply of Stone Aggregate-10mm |
| 428 | Supply of Stone Aggregate-6mm |
| 429 | Supply of coarse sand (zone III) at site |
| 430 | Supplying of Fine sand Zone IV at site w |
| 431 | Supply of Synthetic enamel paint all sha |
| 432 | Supply of Acrylic emulsion paint of any |
| 433 | Supply Glass putty ( Putty for wood work |
| 434 | Supply of Plaster of paris at site/ site |
| 435 | Supply of structural steel like angle, F |
| 436 | Supply of Galvanised steel barbed wire a |
| 437 | Supply of Wire nails of any size up to 4 |
| 438 | Supply of MS.Name plate for plantation w |
| 439 | SCHEDULE-IV Deployment of Manpower |
| 440 | Depl. of USW Workman/assiting-Casual |
| 441 | Depl. of USW Workman/assiting-Regular |
| 442 | Depl. of SSW_plumber/carpenter |
| 443 | Depl. of Skilled Workman Attachment – I to Price Bid Declaration for Amount Linked to Safety Aspects To, NTPC Limited CMHQ RANCHI Dear Sir, We have read the provisions of “Percentage of Amount Linked to Safety Aspects of the cumulative total of Service Portion of the Contract, i.e. Civil + Installation/ Erection + Structural Works” in bidding documents. In terms of the requirement of the aforesaid provisions, we hereby declare the following: 1. We have priced our bid in such a manner that the component for ‘Amount linked to Safety Aspects/ compliance to Safety Rules’ is not less than the minimum % (As mentioned in IFB under Amount Linked to Safety Aspects) of the cumulative total of Service Portion of the Contract, i.e. Civil + Installation/ Erection + Structural Works. 2. Further, we declare that percentage of Amount Linked to Safety Aspects of the cumulative total of Service Portion of the Contract, i.e. Civil + Installation/ Erection + Structural Works for our bid is as mentioned below: Description Percentage to be filled by bidder (Example: 2% or 3% etc.) Y = Percentage of Amount Linked to Safety Aspects (Min shall be as per the tender documents) 3. We further understand that, in case, the quoted Percentage of Amount Linked to Safety Aspects is less than the minimum % specified as per the tender documents or is left blank or the format is not submitted, in such case Employer shall retain the minimum percentage specified in the tender documents from each RA Bill. 4. We understand that no interest shall be payable on the amounts linked to Safety Aspects / Compliance to Safety Rules including aforesaid retained amount. 5. We understand that the % of amount retained / withheld towards safety aspects from each Running Bill shall be released in part or full based on safety compliance duly certified by Project Manager and Safety-in-charge on quarterly basis as per the details mentioned in Clause 20, Payment on Account/Progressive Interim Payments, Section IV, GCC of bidding documents. Date: Signature Place: Name of the Authorized person Please Enable Macros to View BoQ information |