Tender For Construction Of Water Supply Scheme G.P. Soyal, Naggar, Hallan-I(Majhar) And Aug./Improvement Of Nathan In Tehsil Manali Distt. Kullu H.P. (Sh:- Construction Of Retainig Wall) Under Nabard Estimated Cost :-498336/- Earnest Money:-9967/- Ti, Kullu-Himachal Pradesh
TDR : 54796098
Tender Notice
BOQ
7 Days Left
Kullu
Himachal Pradesh
Tender For Construction of Water Supply Scheme G.P. Soyal, Naggar, Hallan-I(Majhar) And Aug./Improvement Of Nathan In Tehsil Manali Distt. Kullu H.P. (Sh:- Construction of Retainig Wall) Under Nabard Estimated Cost :-498336/- Earnest Money:-9967/- Ti
Name of Work:- C/O WSS G.P. Soyal, Naggar, Hallan-I(Majhar) and Aug./Improvement of Nathan in Tehsil Manali Distt. Kullu H.P. (SH:- C/O Retainig wall) under NABARD Estimated Cost :-498336/- Earnest Money:-9967/- Time :- 2 months
Sl. No.
Item Description
1
Excavation in foundations, trenches etc., in earth work lift upto 1.50 Metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres to the entire staisfaction of Engineer-in-charge with in all leads and lifts.
2
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5 mm so as to give a rough finish including centering shuttering and propping etc. Height of propping and cetering below supporting floor to seiling not exceeding 4 mtrs and removel of th same for the same for in situ reinforcement concrete and plain concrete concrete work including all leads and lifts.
3
Vertical surface such as walls (any thikness) portions and the like including attached pilaster buttersses plinth and stiring course and the like
4
Providing and laying cement concrete 1:5:10 (1 cement: 5 sand: 10 graded stone aggregate 40mm nominal size with 15% plum and curing complete excluding the cost of form work in retaining wall/ breast wall. The size of plum shall usually be 150mm to 300mm as per HPPWD specification in all respect and as per direction and to the entire satisfaction of Engineer-in-charge. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.