| 1 | BOQ and Calculation Sheet for Calculation Purpose Only. TS No. BHE/PW/PUR/BWT6-SMX/PK6/318 BOQ and Calculation Sheet for Handling at site stores / storage yard, transporting to site, inspection, preassembly, erection, alignment, welding, NDT, fixing of hangers & supports, chemical cleaning / pickling, oil flushing, water flushing, hydro testing & steam blowing, surface finish, supply & application of primer & finish paints/ Anti corrosive / Wrapping and coating as applicable including labelling & flow direction on the piping / over insulation & hangers and supports, pre-commissioning, commissioning, trial operation & handing over to customer for, SCR Piping & Catalyst Modules, Valves, Fittings, Hangers & Supports and Insulation of 1x660MW, Unit-6, Bhusawal TPS, Bhusawal 425307 Sl.No. Ref.No. Description Unit Quantity % Weightage w.r.t. Total Quoted Price Rate Amount Remarks Bidder to enter total amount for entire subject work here Excluding GST 1.0 PKG 6 Erection, testing & commissioning of all balance SCR Piping (i.e Ammonia Storage Area, Ammonia Farm Utility, Ammonia System SCR Area, Ammonia Injection Skid ,Ammonia SCR Utility Piping, Dilution Air Supply, Nitrogen Piping, Potable Water, Condensate Water, Aux Steam Piping and related Valves, H&S, associates other items ) MT 0.27867902195255 0.0 1.a on pre-assembly wherever applicable (if not applicable, this portion shall be clubbed with placement in position) MT 59.34 0.15 0.0 0.0 1.b placement in position MT 59.34 0.2 0.0 0.0 1.c alignment MT 59.34 0.15 0.0 0.0 1.d welding/bolting/fixing MT 59.34 0.2 0.0 0.0 1.e completion of non destructive examination & stress relieving / heat treatment (if not applicable, then this portion to be paid along with welding) MT 59.34 0.05 0.0 0.0 1.f hangers & supports etc wherever necessary as per drg MT 59.34 0.05 0.0 0.0 1.g hydrauli test/pneumatic test MT 59.34 0.03 0.0 0.0 1.h floating lines,final adjustment of supports for cold and hot values (if not applicable, this portion to be clubbed along with hydraulic test/ pneumatic test) MT 59.34 0.02 0.0 0.0 1.n completion of all drains and vents to respective locations and placement of instrument sensors after steam blowing. MT 59.34 0.01 0.0 0.0 1.p area cleaning, temporary strcture cutting/removal and return of scrap MT 59.34 0.04 0.0 0.0 1.q punch list points/pending points liquidation MT 59.34 0.03 0.0 0.0 1.s material reconciliation MT 59.34 0.04 0.0 0.0 1.t completion of contractual obligations MT 59.34 0.03 0.0 0.0 2.0 Erection, testing & commissioning of SCR systems (Waste Ammonia Dilution Tank , SCR - Rectifier , SCR -Reactor Sealing System ,Catalyst De- Dusting System, Catalyst De Dusting System Piping DD, SCR Catalyst Modules) MT 0.72132097804745 0.0 2.a on pre-assembly wherever applicable (if not applicable, this portion shall be clubbed with placement in position) MT 257.836137 0.15 0.0 0.0 2.b placement in position MT 257.836137 0.2 0.0 0.0 2.c alignment MT 257.836137 0.15 0.0 0.0 2.d welding/bolting/fixing MT 257.836137 0.2 0.0 0.0 2.e completion of non destructive examination & stress relieving / heat treatment (if not applicable, then this portion to be paid along with welding) MT 257.836137 0.05 0.0 0.0 2.f hangers & supports etc wherever necessary as per drg MT 257.836137 0.05 0.0 0.0 2.g hydrauli test/pneumatic test MT 257.836137 0.03 0.0 0.0 2.h floating lines,final adjustment of supports for cold and hot values (if not applicable, this portion to be clubbed along with hydraulic test/ pneumatic test) MT 257.836137 0.02 0.0 0.0 2.n completion of all drains and vents to respective locations and placement of instrument sensors after steam blowing. MT 257.836137 0.01 0.0 0.0 2.p area cleaning, temporary strcture cutting/removal and return of scrap MT 257.836137 0.04 0.0 0.0 2.q punch list points/pending points liquidation MT 257.836137 0.03 0.0 0.0 2.s material reconciliation MT 257.836137 0.04 0.0 0.0 2.t completion of contractual obligations MT 257.836137 0.03 0.0 0.0 Total Amount for Entire Work Excluding GST 0.0 |