| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. |
| 2 | Providing and applying two coats of exterior weather shield paint of approved manufacture and of approved colour to the plastered surfaces including cleaning ,preparing the plaster surface ,applying primer coat ,scaffolding if necessary, and watering the surface for two days etc complete. NOTE: ForItem Number 15 to 18 prior approval of Superintending Engineer will be necessary |
| 3 | Providing and applying two coats of synthetic enamel paint of approved colour to new /old structural steel work and wood work in buildings, including scaffolding if necessary, cleaning and preparing the surface (excluding primer coat) etc. complete. |
| 4 | Providing first class skilled carpenter |
| 5 | Providing first class skilled Plumber |
| 6 | Providing Unskilled Labour to work as a sweeper |
| 7 | Providing Unskilled Mazdoor Male / Female to work as Cleaning |
| 8 | Providing and Fixing wall panelling ...etc. |
| 9 | Providing and fixing Wooden Flooring in required position. |
| 10 | Providing and laying wooden skirting ...etc. |
| 11 | Providing and fixing in position Gypsum board false ceiling with 12.5 mm thick Gypsum boards, screwed/fixed to the under structure of suspended G.I. Grid constructed and suspended from the main ceiling consisting of ceiling sections of size 25 x 50 mm maximum center to center distance of 600 milimetre perimeter channel and intermediate channels at maximum center to center distance 1200 milimetre galvanized grid should be fixed to reinforced cement concrete slab. The gypsum board should be fixed to galvanized iron grid with necessary screws. The boards should be taped and filled from underside to give smooth, seamless ceiling. The rate should include necessary additional ceiling sections and intermediate channels. Additional intermediate channels should be fixed to strap hangers for additional support to prevent strapping at every 1200 milimetre item to be completed in all respect including necessary sleeves for ducts finishing of joints cut outs, painting including labour, material, lifts etc. all complete. |
| 12 | Providing and applying Two coats of wall care Putty on plastered surface and Ceiling and Walls to prepare surface even and smooth of approved make, etc complete. |
| 13 | Providing and applying plastic emulsion paint of approved quality, colour and shade to old and new surfaces in two coats including scaffolding, preparing the surface. (excluding the primer coat)etc. complete. |
| 14 | Providing & Arrangemnt of High Back, Synchronized Mechanism with Multiple Locking, Adjustable Armrest, Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Leatherite Upholstery |
| 15 | Providing and Fixing office table top 36 mm thick ...etc. |
| 16 | Providing and fixing decorative teak plywood veneer lining 4 mm thick with backing of teak wood frame work of battens 12 mm X 25 mm at 30 cm center to center fixed to walls and pillars with 12 mm thik phywood building without skirting and cornice as per drawings including necessary iron work and finishing the exposed wood work with french polish etc. complete. |
| 17 | Providing and Fixing table pull out ...etc. |
| 18 | Providing and fixing Ply wood Partition 90 mm thick ...etc. |
| 19 | Providing and fixing Office file rack ...etc. |
| 20 | Providing and fixing tube light box ...etc. |
| 21 | Providing and fixing bid size tube light box ...etc. |
| 22 | Providing and fixing file pull out |
| 23 | Transportation of material obtain from debries of verious sorts excavated stuff including necessary excavation /loosing inc. loading ,unloading and conveying and disposing as directed.(Beyond 10.00 km) Please Enable Macros to View BoQ information |