| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge in cement mortar. (17-Chapter Si.No.6) |
| 2 | Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter Si.No.1) |
| 3 | Cartage of Malva, Silt, sludge kankar and other disposable organic material etc. all complete with labour T&P including cartage of 8 km. (Chapter No.3 Si.No.8) |
| 4 | Providing and laying Cement Concrete in 1:5:10 (1 cement :5 fine sand 10 Stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter Sr.No.1) |
| 5 | Class-150 Brick Work in 1:4 Cement and Coarse Sand, mortar in foundation and plinth including supply of all materials, labor and tools and plants, etc. Required for proper completion of the work. ( Chapter No. 06 Sr.No. 2) |
| 6 | 12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive.(c) 1 Cement : 4 Coarse sand.(Chapter No.13 Si.No.1) |
| 7 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam (22.40-53mm) specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. |
| 8 | Supply & Laying of I shaped (Zigzag) precast lnterlocking tiles of thickness 60 to 100mm (Compressive strength not less then 30Mpa and weight 4.50k9) lncluding 0.30mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work. 60 mm (Rubber molded Coloured) |
| 9 | Providing and laying Cement Concrete in 1:2:4 of not less than strength of M-15 stone grit (20 mm nominal size) approved coarse sand and cement. Curing complete including of cost of form work in foundation and floors.(5-Chapter Sr.No.6 Si.No..4.1.3) |
| 10 | Finishing Wall Putty Aproved brand and manufacture and of required shade and undecorated wall surface to give and even shade over and including curing and cost of all material. (15-Chapter Si.No.27 New) |
| 11 | Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coat applied @ 1.67 Itr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) supply of all labour material and T&P required for proper completion of work. (Chapter No.15 Si.No.17) |
| 12 | Mild steel of iron in heavy size such as trusses built up gates record reck, roof work gates etc. brought to required form including drilling holes revitting are welding where neccesary, and also including supply of steel bolts , nuts wastage etc. and there fixing required for completion of the work. (Chapter No.10 Sr.No.2) |
| 13 | Supply and Fixing Stainless steel (Grade 304) ralling made of Hollow tubes, channels, plates etc. Including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary steel nuts and bolts complete. I/C fixing the ralling with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts fasteners etc.). (Chapter No.10 SI. No. 14 New) |
| 14 | Paint of the two coat over priming coat including cost of priming coat new steel gril etc. all complete.{15-Chapter Sr.No.1-(641)+3-(13.61)} |
| 15 | Supply and Fixing of Precast Reinforced R.C.C benches (PFRC) ornamental benches with 02 year warranty etc all complete. (None Scheduled) |
| 16 | Installation of 1.50 H.P. ISI marked Sumbercible Pump etc all complete. (Attache as per Santion Annalysis) |
| 17 | Supply & Fixing Granite Stone Work Display Board (Size 2.50ft x 4.00ft) including Painting, Lettering etc. all complete. (None Schedule) |