|
| 1 | Providing Part |
| 2 | Prov.Steel Tubular 11MTR Pole along with base plate (Provided By HPSEBL) |
| 3 | Prov.Steel Tubular 9MTR Pole along with base plate (Provided By HPSEBL) |
| 4 | Prov.Muff with Concerete Filling |
| 5 | Prov. Conductor ACSR 6/1/3.35 MM (Provided By HPSEBL) |
| 6 | Prov.G.I.Wire 8SWG |
| 7 | Prov.HT Stay Set |
| 8 | Prov.HT Stay Wire |
| 9 | Prov.HT Egg Insulator |
| 10 | Prov.HT Earthing Set |
| 11 | Prov.Pin Insulator |
| 12 | Prov.Disc Insulator Complete Set |
| 13 | Prov.X-Arm:CI:100X50X50X5mm,Length:2400mmX28Nos. |
| 14 | Prov.X-Arm:CI:100X50X50X5mm,Length:2800mmX28Nos. |
| 15 | Prov.X-Arm:AI:75X75X6,Length:2800mm(for Guard Wire)X20Nos. |
| 16 | Prov.X-Arm:CI:100x50X50X5mm,Length:460mm (For Top Clamp)X12Nos. |
| 17 | Prov.Knee Bracing Set:X-Arm:AI:((75X40X5mm,Length:1500mm)X2Nos.)11Nos. |
| 18 | Prov.X-Arm:AI:75X40X5mm,Length:2400(Cross Brassing)X9Nos. |
| 19 | Prov.X-Arm:AI:75X40X5mm,Length:2800(Cross Bracing)X9Nos. |
| 20 | Prov.Half Clamp |
| 21 | Prov.Full Clamp |
| 22 | Prov.Barbed Wire |
| 23 | Prov.Nuts & Bolts |
| 24 | Prov.Red Oxide Paint |
| 25 | Prov.Aluminium Paint |
| 26 | Erection Part |
| 27 | Errection of Steel Tubular Poles Single pole structure ,Digging of Pit,Filling of Pit and Ramming,Errection of X-Arms,Disc Insulators & Pin Insulators and Errection With Pole. |
| 28 | Errection of Steel Tubular Poles Double pole structure ,Digging of Pit,Filling of Pit and Ramming,Errection of X-Arms,Disc Insulators & Pin Insulators and Errection With Pole. |
| 29 | Erection of Stay Set,Digging of Pit,Fixing of stay rod,Filling of Pit & Nozzeling & Tightning & Filling of Pit |
| 30 | Sagging of Conductor ACSR 6/1/3.35MM2 (Stringing & Sagging and Binding with Insulator) |
| 31 | Sagging of G.I. Wire (Stringing & Sagging and Binding with Insulator) |
| 32 | Erection of HT Earthing Set |
| 33 | Errection of Jumpers |
| 34 | Manual carriage and Road transportation of allied material from store to site of work Please Enable Macros to View BoQ information |