| 1 | Providing Part |
| 2 | Prov.Steel Tubular Poles (13 m, Working Load > 200 kgf/m²) (Prov. By HPSEBL) |
| 3 | Prov.Steel Tubular Poles (11 m, Working Load > 200 kgf/m²) (Prov. By HPSEBL) |
| 4 | Prov. Pin Insulator |
| 5 | Prov. Disc Insulator Complete Set |
| 6 | Prov. X-Arm:CI:100X50X50X5mm,Length:2400mm |
| 7 | Prov. X-Arm:CI:100X50X50X5mm,Length:2800mm |
| 8 | Prov. X-Arm:AI:75X75X6,Length:2800mm(for Guard Wire) |
| 9 | Prov. X-Arm:CI:100x50X50X5mm,Length:460mm (For Top Clamp) |
| 10 | Prov. Knee Bracing Set:X-Arm:AI:((75X40X5mm,Length:1500mm) |
| 11 | Prov. X-Arm:AI:75X40X5mm,Length:2400(Cross Brassing) |
| 12 | Prov. X-Arm:AI:75X40X5mm,Length:2800(Cross Bracing) |
| 13 | Prov. X-Arm:CI:100X50X50X5mm,Length:2400mm(for G.O.Switch and D.O fuse ) |
| 14 | Prov. Half Clamp |
| 15 | Prov. Full Clamp |
| 16 | Prov. G.O. Switch 400 AMP, 11KV |
| 17 | Prov. DO Fuse Unit |
| 18 | Prov. Barbed Wire |
| 19 | Prov. Nuts & Bolts |
| 20 | Prov. Red Oxide Paint |
| 21 | Prov. Aluminium Paint |
| 22 | Erection Part |
| 23 | Errection of Steel Tubular Poles ,Digging of Pit,Filling of Pit and Ramming,Errection of X-Arms,Disc Insulators & Pin Insulators and Errection With Pole. |
| 24 | Erection of Stay Set,Digging of Pit,Fixing of stay rod,Filling of Pit & Nozzeling & Tightning & Filling of Pit |
| 25 | Sagging of Conductor ACSR 6/1/3.35MM2 (Stringing & Sagging and Binding with Insulator) |
| 26 | Sagging of G.I. Wire (Stringing & Sagging and Binding with Insulator) |
| 27 | Erection of HT Earthing Set |
| 28 | Erection of G.O.Switch and D.O fuse unit |
| 29 | Errection of Jumpers |
| 30 | Prov. transportation of associated material Please Enable Macros to View BoQ information |