| 1 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. |
| 2 | Construction of un-reinforced,dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. |
| 3 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. |
| 4 | Plain/Reinforced Cement Concrete (PCC Grade M15) in Open Foundation complete as per Drawing and Technical Specifications including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. |
| 5 | RCC Grade M25 Using Batching Plant, Transit Mixer and Concrete Pump including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. |
| 6 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. Please Enable Macros to View BoQ information |