|
| 1 | Safe Carriage of following material from Electricity Store Centre, Moradabad to work site including its Loading and Unloading. (Note-under 40 km distance) |
| 2 | 13 Mtr. Long ST Poles |
| 3 | 11 Mtr. Long ST Poles |
| 4 | 11 Mtr. PCC Poles |
| 5 | 8.5 Mtr. PCC Poles |
| 6 | Cable Jointing Kit Indoor 3X300 sqmm. |
| 7 | Cable Jointing Kit Indoor 3X240 sqmm. |
| 8 | Cable Jointing Kit Indoor 3X185 sqmm. |
| 9 | Cable Jointing Kit Indoor 3X120 sqmm. |
| 10 | Cable Jointing Kit Indoor 3X70 sqmm. |
| 11 | Cable Jointing Kit Outdoor 3X300 sqmm. |
| 12 | Cable Jointing Kit Outdoor 3X240 sqmm. |
| 13 | Cable Jointing Kit Outdoor 3X185 sqmm. |
| 14 | Cable Jointing Kit Outdoor 3X120 sqmm. |
| 15 | Cable Jointing Kit Outdoor 3X70 sqmm. |
| 16 | Earthing |
| 17 | Straight Through 3X300 sqmm. |
| 18 | Straight Through 3X240 sqmm. |
| 19 | Straight Through 3X185 sqmm. |
| 20 | Straight Through 3X120 sqmm. |
| 21 | Straight Through 3X70 sqmm. |
| 22 | Transfomer Oil |
| 23 | Replacement of Damage Pole |
| 24 | 13 Mtr STP |
| 25 | 11 Mtr STP |
| 26 | 11 Mtr PCC |
| 27 | 8.5 Mtr PCC |
| 28 | 11 KV Cable Jointing Kit Indoor |
| 29 | Indoor 3X300 sqmm. |
| 30 | Indoor 3X240 sqmm. |
| 31 | Indoor 3X185 sqmm. |
| 32 | Indoor 3X120 sqmm. |
| 33 | Indoor 3X70 sqmm. |
| 34 | 11 KV Cable Jointing Kit Outdoor |
| 35 | Outdoor 3X300 sqmm. |
| 36 | Outdoor 3X240 sqmm. |
| 37 | Outdoor 3X185 sqmm. |
| 38 | Outdoor 3X120 sqmm. |
| 39 | Outdoor 3X70 sqmm. |
| 40 | Earthing Of Pole |
| 41 | 13 Mtr STP |
| 42 | 11 Mtr STP |
| 43 | 11 Mtr PCC |
| 44 | 8.5 Mtr PCC |
| 45 | Water Level Pipe Earthing Of Transfomer |
| 46 | 1000 KVA |
| 47 | 630 KVA |
| 48 | 400 KVA |
| 49 | 250 KVA |
| 50 | Earthing Of Small Power Transfomer |
| 51 | 160 KVA |
| 52 | 100 KVA |
| 53 | 63 KVA |
| 54 | 25 KVA |
| 55 | Repairing Plinth Of Transformer |
| 56 | 1000 KVA |
| 57 | 630 KVA |
| 58 | 400 KVA |
| 59 | 250 KVA |
| 60 | 25/63/100/160 KVA |
| 61 | Repairing Fancing Of Transformer |
| 62 | 1000 KVA |
| 63 | 630 KVA |
| 64 | 400 KVA |
| 65 | 250 KVA |
| 66 | 100 KVA |
| 67 | Repairing Of 11 KV Line & LT Line Guarding |
| 68 | Repairing Of 11 KV Line Guarding |
| 69 | Repairing Of LT Line Guarding with Spacer |
| 70 | Grouting of Poles |
| 71 | 13 Mtr STP |
| 72 | 11 Mtr STP |
| 73 | 11 Mtr PCC |
| 74 | 8.5 Mtr PCC |
| 75 | Muffing of Poles |
| 76 | 13 Mtr STP |
| 77 | 11 Mtr STP |
| 78 | 11 Mtr PCC |
| 79 | 8.5 Mtr PCC |
| 80 | 11 KV Straight Through |
| 81 | 3X300 sqmm. |
| 82 | 3X240 sqmm. |
| 83 | 3X185 sqmm. |
| 84 | 3X120 sqmm. |
| 85 | 3X70 sqmm. |
| 86 | Welding of Rusted Poles |
| 87 | 13 Mtr STP |
| 88 | 11 Mtr STP |
| 89 | Alignment of Tilted Poles |
| 90 | 13 Mtr STP |
| 91 | 11 Mtr STP |
| 92 | 11 Mtr PCC |
| 93 | 8.5 Mtr PCC |
| 94 | Alignment of Tilted Transfomer |
| 95 | 1000 KVA |
| 96 | 630 KVA |
| 97 | 400 KVA |
| 98 | 250 KVA |
| 99 | 160 KVA |
| 100 | 100 KVA |
| 101 | 63 KVA |
| 102 | 25 KVA |
| 103 | 16 KVA |
| 104 | 10 KVA |
| 105 | Top Up the DistributionTransfomer from Oil Please Enable Macros to View BoQ information |