| 1 | Demolition of PCC Block walling built in CM 1:6 complete all as specified and as directed |
| 2 | Excavation over not areas exc 1.5 m deep and getting out in Soft/Loose soil complete all as specified |
| 3 | Excavation over areas n exc 1.5 m deep not exceeding 3.0m deep and getting out in Soft/Loose soil complete all as specified |
| 4 | M & L for PCC 1:5:10 type E2 ( using 40 mm graded stone aggregate) as in foundation filling mass concrete complete all as specified and as directed. |
| 5 | M & L for PCC 1:3:6 type C2 ( using 40 mm graded stone aggregate) as in foundation filling mass concrete complete all as specified and as directed. |
| 6 | M & L for RCC M-30 design mix concrete (using 20 mm graded stone aggretate) as in foundations incl rafts, footings and mass concrete complete all as specified and directed |
| 7 | M & L for RCC M-30 design mix concrete (using 20 mm graded stone aggretate) as in retaining walls and the like any thickness above top of footing including attached pillasters and butteresses complete all as specified |
| 8 | M&L for use and removal of steel form work to sides of concrete foundations, footings,rafts and raft beams sides and soffits of foundation and plinth beams and similar work for flat fair finished surface complete all as specified. |
| 9 | M&L for use and removal of steel form work to faces of walls retaining walls, abutments, parapets and like for flat fair finished surface complete all as specified. |
| 10 | S&F TMT bars 10 mm dia and over, cut to length, bent to shape required including cranking and binding with mild steel wire (annealed) not less than .9mm dia complete all as specified. |
| 11 | M&L for broken stone or boulders including hand packing (any thickness) at back side of weep holes and raising or lowering to the required level complete all as specified. |
| 12 | M&L for 110 mm bore PVC pipes as in weep holes complete all as specified. |
| 13 | Removing excavated soil exc 50 m but not exc 250 m and depositing where directed at level n.exc 1.50 m above the starting point complete all as specified and directed. |
| 14 | Return filling in Surplus soil and back filling of retaining wall, including spreading, levelling, watering and well ramming in layers n.exc. 25cm complete all as specified and directed. |
| 15 | S&F framed brackets of angles or tees with web and flanges, cut to shape, drilled and countersunk for screw, including bending and welding angles as necessary, gusset plate, riveting etc n exc 10kg each brackets conforming to Fe-290 Gde E-165 including dismantling old MS work complete all as directed. |
| 16 | S&F in repair Galvanised. 2 strand, steel barbed wire 2.24mm dia barbed with 2mm dia barbs at 75mm spacings and straining and fixing to any type of standard rails straining bolts, including, securing or tying at crossings with and provision of galvanised mild steel wire, staples or steel pins, etc. as directed (each line wire to be measured) |
| 17 | M&L Painting two coats of synthetic enamel paint over a coat of red oxide including preparation of new steel surfaces of any description over 10cm in width or girth not other wise described complete all as specified and directed. |
| 18 | S&F Punched type concertina coil, 1A with wire spiral of 50 turns having a core wire high carbon spring steel of high tensile strength and a low carbon steel strip of 19mm wide 0.5mm thick having series of sharp barbs punched all along the core wire dia of coil when opended to 15mtrs with height of 915 + 50mm tolerance with weight of one coil not less than 15.20 kg (+/-) 5% nominal dia of uncoated wire shall be 2.60mm with permissible variation of (+/-)0.035mm, minimum tensile strength of wire 167N/mm2 as per IS 1608,minimum torsion shall be 22 as per IS 1717 and weight of Zinc coating 230 g/mm2. The concertina coil straining and fixing over barbed wire supported with Y angle including securing or tying at crossing with and provn of galvanized mild steel wire staples or steel pins etc, including taking down old work complete all as specified and directed. (Note:-GI Barbed wire and MS angle are paid separately) Please Enable Macros to View BoQ information |