| 1 | All works of repair of central Air Conditioning Plant shall be executed by company authorized reprsentative and the same shall be got approved from GE before commencement of work |
| 2 | Supply, charging & testing leakage with nitrogen gas upto required pressure in central AC plants system, off sizes comprising of 3 units including rectification of leakage by means of gas welding and making system leak proof at any of the AC plants, complete all as specified and directed. |
| 3 | Supply & charging, refrigerant Mafron-22 (R-22) brought at site in company sealed cylinders at any installation/AC plants, complete all as specified and directed by Engineer-in-Charge. |
| 4 | Supply & charging, refrigerant R 407-C brought at site in company sealed cylinder at any installation/AC plants, complete all as specified and directed by Engineer-in-Charge. Note for item no.3 & 4 :- Empty cylinders will be returned back to the contractor. |
| 5 | Dismantling and opening both side covers of condenser comprising of 3 units and de-scaling of condenser of capacity 8.75 TR to 25 TR at any installation, by using concentrated HCL solution carefully and roding with brushes including replacement of rubber gasket & worn out nuts, bolts of condenser, complete all as specified & directed. |
| 6 | All as per description of item no. 5 here in before but of capacity 40 to 60 TR for the plants located at certainbase Ops and Auditorium complete all as specified. |
| 7 | M&L for complete servicing of condensor of Cap 40 TR cubical type by circulating the chemical as per the manufacturer recommendation to wipe out the deposists from the copper tubing, detection of gas leakage from the shell by filling nitrogen gas , repair of shell to prevent gas leakage. The shell will be tested for the discharge of water pressure as per manufacturer design, Cycle of chemical will be stopped once the desired water pressue is obtained. Note : Refrigerant reqd for the chiller will be measured and paid seperately under respective item of BOQ. |
| 8 | Dismantling and opening of GI sheet ducting from AHU for cleaning/de-scaling complete with automatic cleaning system comprising of air compressor, vacuum unit, dust cleaning equipment.Notes : (i) The cleaning of duct is to be started from AHU to different branches in different rooms. All the grills and diffusers are to be cleaned before re-fixing. Rate quoted shall also includes taking down of false ceiling as required and re-fixing the same and re-fixing of dismantled duct with proper clamps, nut, bolts all as specified and directed.(ii) The cleaning equipment shall have monitor, video camera etc for recording of complete cleaning process. The recording of complete cleaning process shall be stored and soft copy (DVD) of the same shall be handed over to the Engineer-in-Charge for record. |
| 9 | Dismantling and opening of cooling coil (AHU) at any installation complete for cleaning with acid solution, with circulating water pump etc, detection of leakage repair of damaged cooling coils tubes with necessary brazing after thorough cleaning etc complete and re-fixing the same, testing on load, complete all as specified and directed. Note : - The work should be done by auth compony rep . |
| 10 | Supply and fixing in repalcement micro type filter synthetic non woven type, supported with aluminium and HDPE mesh having filter efficiency of 90% down to 10 micron of size 600 x 600x150mm (as per sample) including taking out old and removal, complete all as specified and directed. |
| 11 | Supply & fixing, LP/HP cutout type switch as per site requirementfixed in repair complete all as specified and directed |
| 12 | Supply & fixing, thermostatic expansion valve type TCLE 7.5 HW, fixed in repair complete all as specified and directed. |
| 13 | Supply & fixing, V belt, A-22 fixed in repair complete all as specified and directed |
| 14 | Supply & fixing, V belt, A-28 fixed in repair complete all as specified and directed. |
| 15 | Supply & fixing, V belt, A-30 fixed in repair complete all as specified and directed. |
| 16 | Supply & fixing, V belt, A-66 in replacement, fixed in repair complete all as specified and directed. |
| 17 | Supply & fixing, V belt, B-78 fixed in repair complete all as specified and directed. |
| 18 | Supply & fixing, V belt, B-97 fixed in repair complete all as specified and directed. |
| 19 | Supply & fixing butterfly valve for AC plants of suitable size as per site requirement fixed in repair complete all as specified and directed |
| 20 | Supply & fixing water flow gauge for AC plants of suitable size as per site requirement fixed in repair complete all as specified and directed |
| 21 | Supply & fixing water temperature thermostat of range 0-120 F for AC plants of suitable size as per site requirementfixed in repair complete all as specified and directed |
| 22 | Supply & fixing water flow switch for AC plants of suitable size as per site requirement fixed in repair complete all as specified and directed |
| 23 | Supply & fixing Y strainer for AC plants of following size 100 mm dia fixed in repair all specified and directed by Engineer-in-Charge |
| 24 | Supply & fixing Y strainer for AC plants of following size 80 mm dia fixed in repair all specified and directed by Engineer-in-Charge |
| 25 | Supply & fixing Y strainer for AC plants of following size 50 mm dia fixed in repair all specified and directed by Engineer-in-Charge |
| 26 | Supply & fixing, PVC fins suitable for ‘Delta/ Mihir\\" cooling tower, any size and any type fixed in repair complete all as specified and directed. |
| 27 | Supply & fixing, solenoid valve, magnetic coil type, single phase, 230 Volts, suitable for R-407C refrigerant including taking out old and removal, complete all as specified and directed. |
| 28 | Supply & fixing, contactor CA-3-30, 3 phase, 415 Volts, 45 Amps including taking out old and removal, complete all as specified and directed. |
| 29 | Supply & fixing, relay type CT-3-12, range 1.6 to 2.5 Amps AC, 3 phase, 600 Volts including taking out old and removal, complete all as specified and directed. Make: GE/L&T/Siemens. |
| 30 | Supply & fixing, contactor MNX-12 Amps capacity, AC 3 phase 415 Volts, 50 Hz including taking out old and removal, complete all as specified and directed. Make: GE/L&T/Siemens |
| 31 | Supply & fixing, contactor MNX-25, AC 3 phase, 415 Volts, 50 Hz with standard coil including taking out old and removal, complete all as specified and directed. Make :GE/L&T/Siemens |
| 32 | Supply & fixing, contactor MNX-9, AC 3 phase, 415 Volts, 50 Hz with standard coil including taking out old and removal, complete all as specified and directed. Make: GE/L&T/Siemens |
| 33 | Supply & fixing , relay range 6 to 10 Amps, 415 Volts, 50 Hz including taking out old and removal, complete all as specified and directed. Make: GE/L&T/Siemens |
| 34 | Supply and fixing in replacement FRP cooling tower of minimum 48 TR heat rejection capacity with FRP water basin filling with integral louvers, and drift eliminators complete with hot water basin either fitted with spray nozzles or having self rotating sprinklers, statically & dynamically balanced axial flow type fan direct driven or driven through reduction gear box with TEFC induction motor, suction screen make up quick filling arrangement over flow and drain connections with necessary valves and suitable inspection ladder, access arrangement for cooling tower in suction interior, installed on MS girders (MS-I section) including all accessories basin fittings, fan motor suitable for 415 Volt supporting structure anti vibration mountings etc complete and 50 Hz power supply having isolator panel with MCB at cooling tower and with following technical date :-(a) Water flow/ tower 125 USGPM(b) Ent water temp 97 degree F(c) Basin water temp 90 degree FMake :- Delta/ paharpur/Mihir/Advance |
| 35 | Supply and fixing in replacement the nominal sizes of 100mm dia condenser pipe MS IS : 1239 with necessary clamps, vibration isolators and fitting like valves, flanges, union etc but excluding valves, strainers, gauges etc cut to required lengths and welded at joints and inclusive of accessories like elbows, tees, reducers, sockets etc complete with primer and paint including repairing damaged to building etc all as specified and directed |
| 36 | Supply and fixing in replacement the nominal sizes of 80mm dia condenser pipe MS IS : 1239 with necessary clamps, vibration isolators and fitting like valves, flanges, union etc but excluding valves, strainers, gauges etc cut to required lengths and welded at joints and inclusive of accessories like elbows, tees, reducers, sockets etc complete with primer and paint including repairing damaged to building etc all as specified and directed |
| 37 | Supply & fixing, contactor MO-A 1, AC 15Amps, 3 phase, 415 Volts as per existing make and specs including taking out old and removal, complete all as specified and directed. |
| 38 | Supply & fixing, anti freeze thermostatic switch for chiller unit in replacement as per existing make, complete all as specified and directed. |
| 39 | Material and labour for attending the complaint of ac plant related to panel wiring fault, microprocesser based ac plant panel fault /settings,cooling tower and other related to ac plant find out the problem and rectified the same day without affective the service complete all as specified and directed.Note:-(i)Contractor will supply following well experienced and well conversant manpower against AC plant complaints,at a time for attending complaints all working days (ii) Complaint should be attend immediately.(iii) Complaint attended br specific knowledgeable person of AC plant(iv) Contractor shall provides all tools and plants as required |
| 40 | S&F in replacement of dryer for liquid line for package type ac plant 8.75 TR to 60 TR (Voltas) make.complete all as specified and directed by Engr in charge. |
| 41 | Calibration and repair to the Micro processor based controller for package units reciprocating scroll type compressor Make Voltas capacity 8.75 TR to 60 TR including repair Motor Protection Device (MPD) and Voltage Protection Device (VPD), and 3 phase 415 volts electric supply complete to its full load capacity complete all as specified and directed by Engineer-in-Chrage. |
| 42 | Dismantling and taking out burnt electric Condenser pump motor of any make, type, RPM, 3 HP capacity, 3 phase 415 Volts, thoroughly cleaning and rewinding to stator with supper enameled copper wire of appropriate gauge including allied insulating material and varnishing of stator, replacement of front and rear bearings (as per sample) of the electric motor, re-fixing in position including electric connection and testing complete on load, complete all as specified and directed. |
| 43 | All as per srl item No 42 above but for 5 HP complete all as specified and directed. |
| 44 | All as per srl item No 42 above but for 7.5 HP complete all as specified and directed by Engineer-in-Chrage. |
| 45 | All as per srl item No 42 above but for 10 HP complete all as specified and directed by Engineer-in-Chrage. |
| 46 | All as per srl item No 42 above but for 12.5 HP complete all as specified and directed by Engineer-in-Charge. |
| 47 | Supply and Fixing in replacement of control panel intelligent microprocessor based suitable for control panel complete included with PCB cards,complete internal wiring,contactors,all sensors programming and other connected item which is suitable for 8.75 TR to 17 TR AC plant complete all as specified and directed by Engr -in-charge. |
| 48 | Supply and Fixing in replacement of control panel intelligent microprocessor based suitable for control panel complete included with PCB cards,complete internal wiring,contactors,all sensors like Oil sensor,pressure senser,chilled water sensor,complete programming and other connected item which is suitable for 24TR to 60TR AC plant complete all as specified and directed by Engr -in-charge. |
| 49 | Supply and fixing in replacement Finned type strip heaters 2000 Watt, 240 Volts, complete all as specified and directed. Make: Daspass Cat Part No. FSH-20 or compatible model of make specified here in after. |
| 50 | Supply and fixing in replacement Finned type strip heaters, 3000 Watt, 240 Volt, complete all as specified and directed. Make: Daspass Cat Part No. FSH-30 or compatible model of make specified here in after.. |
| 51 | Material & labour, repair to cooling tower of capacity 20 TR to 25 TR including replacement of sprinkle assembly of size 2\\"/3\\" with PVC branch distribution pipe etc. complete with cleaning of collector tank etc, fixed in repair complete all as specified and directed. |
| 52 | Material & labour, repair to cooling tower of capacity 25 TR to 60 TR including replacement of sprinkle assembly of size 2\\"/3\\" with PVC branch distribution pipe etc complete with cleaning of collector tank etc., complete all as specified and directed. |
| 53 | Supply & fixing blower motor pakage type 1 HP (960 RPM) with assy for AC Plants (Make: Delta). Incluing dismentling, taking out old & removal fixed in repair complete all as specified and directed. |
| 54 | Supply & fixing condensor motor monoblock pump type 5 HP with assy for AC Plants incluing dismentling, taking out old & removal fixed in repair complete all as specified and directed. |
| 55 | Supply & fixing condensor motor monoblock pump type 7.5 HP with assy for AC Plants incluing dismentling, taking out old & removal fixed in repair complete all as specified and directed. |
| 56 | Supply and fixing Compressor 8.75 Tr for AC plant Make : Denfoss/Emerson including taking out old & removal fixed in repair complete all as specified and directed. |
| 57 | Supply and fixing company sealed Compressor 12 TR for AC plant Make : Voltas (Model As per existing model installed at base Ops) including taking out old & removal complete all as specified and directed. |
| 58 | Supply and fixing company sealed Compressor 13 TR for AC plant make Denfoss / Emerson including taking out old & removal,, complete all as specified and directed. |
| 59 | Supply & fixing micro filter of size 23.5\\"x 15\\"of thickness as per existing fixed in repair complete all as specified and as directed. |
| 60 | Supply & fixing micro filter of size 25˝x25˝of thickness as per existing fixed in repair complete all as specified and as directed. |
| 61 | Supply & fixing humidistat indoor type of range 0-90 fixed in repair complete all as specified and as directed. |
| 62 | Supply & fixing thermostat having range 0-120, fixed in repair complete all as specified and as directed. |
| 63 | Supply and fixing MCCB , 04 poles ,400 Amps, 36 KA, 50Hz,415 volts , Ics=100% of Icu complete adjustable type fixed in repair complete all as specified and as directed. |
| 64 | Supply and fixing MCCB , 04 Poles ,250 Amps, 36 KA, 50Hz,415 volts , Ics= 75 % of Icu adjustable type fixed in repair complete all as specified and as directed. |
| 65 | Supply and fixing in replacement of MCCB , 04 Poles ,160 Amps, 36 KA, 50Hz,415 volts , Ics= 75 % of Icu adjustable type fixed in repair complete all as specified and as directed. |
| 66 | Supply and fixing MCCB , 04 Poles ,125 Amps, 16 KA, 50Hz,415 volts , Ics= 75 % of Icu adjustable type fixed in repair complete all as specified and as directed. |
| 67 | Supply and fixing MCCB, 04 Poles , 100 Amps, 16 KA, 50Hz,415 volts , Ics= 75 % of Icu adjustable type fixed in repair complete all as specified and as directed. |
| 68 | Supply & fixing MCCB ,3 pole, capacity 125 Amps, 415 volts, AC having rupturing capacity 16 KA, fixed in repair complete all as specified and as directed. |
| 69 | Supply & fixing MCCB ,3 pole, capacity 100 Amps, 415 volts, AC having rupturing capacity 16 KA, fixed in repair complete all as specified and as directed. |
| 70 | Supply & fixing MCCB ,3 pole, capacity 63 Amps, 415 volts, AC having rupturing capacity 16 KA fixed in repair complete all as specified and as directed |
| 71 | Supply & fixing MCB, 40 Amps, 3 phase, TP, 415 Volts, AC 50 Hz, with rupturing capacity 9 KA including taking out old and removal, complete all as specified and directed. Make: LEGRAND/ABB/ GE/L&T/Siemens/Schneider /Havells/Indiasian. |
| 72 | Material & Labour for Sub Main Wiring with two run single core 6 Sqmm PVC insulated unsheathed (FRLS) cable with stranded copper conductor drawn in and including PVC concealed conduit 25mm dia with and including 1 run single core 6 Sqmm copper green colour earth wire all as specified and directed by Engineer-in-Charge.( 02 run of single core cable and 1 run single core of earth wire will measured as one unit). |
| 73 | Supply & fixing AC Plant panel boards of different capacities/location with lugs, thimbles ,wires ,winding ,painting ,brazing,cement work/MCCB cover fixed in repair/replacement including taking out old panels/Parts complete all as specified and as directed. |
| 74 | Supply & fixing Ammeter 0-50 Amp, CT type size 96 sq mm square fixed in repair complete all as specified and as directed.. |
| 75 | Supply & fixing Voltmeter 0 - 500 Volt, size 96 sq mm fixed in repairs complete all as specifeid and directed |
| 76 | Supply & fixing Indicator lamps 230 Volt fixed in repair complete all as specified and as directed.. |
| 77 | Supply & fixing Selector switch as per sample complete assembly fixed in repair complete all as specified and as directed.. |
| 78 | Dismanting and taking out burnt electric AHU Blower motor of any make, type, RPM, 7.5 HP capacity 3 phase 415 volts, thoroughly cleaning and rewinding to stator with super enemeled copper wire of appropriate gauge including allied insulating material and varnishing of stator replacement of front and rear bearings (asper sample) of the electric motor, re-fixing in position including electric connection and testing complete on load, complete all as specified and directed. |
| 79 | All as per description of item no. 78 here in before but AHU motor (Blower motor) 3 HP 3 Phase suitable for existing AHU of cap 8.75 TR AC Plant of Make Voltas. Make CG or equivalent. |
| 80 | Dismanting and taking out burnt electric Cooling Tower fan motor of any make, type, RPM, 2 HP capacity 3 phase 415 volts, thoroughly cleaning and rewinding to stator with super enemeled copper wire of appropriate gauge including allied insulating material and varnishing of stator replacement of front and rear bearings (asper sample) of the electric motor, re-fixing in position including electric connection and testing complete on load, complete all as specified and directed. |
| 81 | All as per description of item no. 80 here in before but Cooling Tower fan motor 3 HP 3 Phase of cap 48 TR AC Plant of Make Voltas. |
| 82 | All as per description of item no. 80 here in before but Cooling Tower fan motor 5 HP 3 Phase of cap 48 TR AC Plant of Make Voltas. Please Enable Macros to View BoQ information |
| 83 | All as per description of item no. 80 here in before but Cooling Tower fan motor 5 HP 3 Phase of cap 48 TR AC Plant of Make Voltas. Please Enable Macros to View BoQ information |