| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: Superintending Engineer, Sitapur/Kheri Circle, P.W.D., Sitapur Name of Work: Construction of 3x5.00 mtr Span Box Culvert ,approach road & Protection work in place of damage culvert of Koriyana link road(II) km-1 Contract No: 1435/352 C/E-Tender-Sitapur-Kheri/2025-26 Dated 17-03-2026 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Item Description Item Code / Make Quantity Units Estimated Rate UNIT Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Distmantling brick work or stone work in lime or cement mortar and including stacking materials as directed by Engineer in charge with in a distance of 60 meters ( 200 feet). |
| 3 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 4 | Boring with 100 mm dia casing pipe for dewatering including cost of pipes , other materials, labour charges etc. complete. |
| 5 | Dewatering the ground water for trenches with hire, operational & fuel charges of pump with oprater complete. |
| 6 | Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 |
| 7 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 8 | Sand filling in plingth including supply of necessary quantity of sand from a distance not exceeding 8 km. (5 miles) from the site of work and including watering, dressing etc. Rate to include cost of all materials. Labour and T&P etc required for proper completion of the work. |
| 9 | Providing and laying reinforced cement concrete M-20 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5 |
| 10 | Providing and laying reinforced cement concrete M-25 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5 |
| 11 | Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses 1002, 1010 and 1202 |
| 12 | Providing weep holes in plain/reinforced concrete abutment ,wing wall and return wallwith 75 mm dia P.V.C. Pipe extending through the full width of the structure with slope 1V: 20 H towards drawing face. complete as per drawing and technical specification. |
| 13 | Back filling of granular material (40 mm O.B.B.) behind abutment ,wing wall and return wall complete as per drawing and technical specification. |
| 14 | Supply of 1000 mm dia Np-3 H.P.For Diversion |
| 15 | Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 |
| 16 | Laying brick soling on prepared sub-grade with brick on end edging according to lines,graded and cross-section shown on the drawing filling joints with sand and earth,spreading 25 mm thick layer of earth over brick soling,watering and rolling the same with three wheeled road roller 80-100 kN as per Technical Specification Clause 412 |
| 17 | Providing and laying filter material undermeath pitching in slopes complete as per drawing and Technical Specification. |
| 18 | Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 |
| 19 | Earth work in embankment in ordinary soil, excavation to be done in form of regular pits not exceeding 1/2 M. in depth and work of embankment to be 20 cm layers including ramming & dressing the surfce to the required levels & slopes and including 1.5 m lift and 30 m. lead from the cutting to be used in making embankment or to be deposited as spoil banks with in 30 m. distance as directed by Engineer-in-charge for proper completion of work. |
| 20 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 21 | Providing ,Laying ,spreading and compacting stone aggregates of 63-45 mm size to water bound macadam specification including spreading in uniform thickness , hand packing, rolling with Smooth wheel roller 80-100 kN in stages to proper grade and camber ,applying and brooming ,Stone screening to fill up the nterstices of coarse aggregate ,watering and compacting to the required density Grading-3. As per technical specification clause 405 |
| 22 | Providing ,Laying ,spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness , hand packing, rolling with Smooth wheel roller 80-100 kN in stages to proper grade and camber ,applying and brooming ,Stone screening to fill up the nterstices of coarse aggregate ,watering and compacting to the required density Grading-3. As per technical specification clause 405 |
| 23 | Brick edging on both sides of the road with first class bricks 8 cm wide & 12 cm deep laid with mudmortar including labour & supply of bricks finished to required template and in proper alingment and also including dressing & ramming the excavated earth as directed by the Engineer - in -charge. |
| 24 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70kg/sqm usingmannual means . |
| 25 | Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with hydraulic broom . |
| 26 | Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared ba |
| 27 | Providing and laying seal coat 'C' Type sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall . |
| 28 | Construction of shoulder with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 Total in Figures 10721961.0 10721961.0 INR One Crore Seven Lakh Twenty One Thousand Nine Hundred & Sixty One Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |