| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: Superintending Engineer, Sitapur/Kheri Circle, P.W.D., Sitapur. Name of Work: Construction of 3 x 5.00m span box culvert replacing a damaged culvert located at Km 2 of Rura Sultanpur Road. Contract No: 1435/352/C/e-Tender/STP-Kheri/2026-26 Dated 17-03-2026 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Item Description Item Code / Make Quantity Units Estimated Rate UNIT Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Dismantling reinforced cement concrete or reinforced brick work including stacking of dismantled materials as directed by Engineer in charge with in a distance of 60 meters (200 feet). As Per SOR Item No. 694 |
| 3 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 |
| 4 | Dewatering the ground water for trenches with hire, operational & fuel charges of pump with oprater complete. |
| 5 | Boring with 100 mm dia casing pipe for dewatering including cost of pipes , other materials, labour charges etc. complete. |
| 6 | Sand filling in plingth including supply of necessary quantity of sand from a distance not exceeding 8 km. (5 miles) from the site of work and including watering, dressing etc. Rate to include cost of all materials. Labour and T&P etc required for proper completion of the work. |
| 7 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 8 | Providing and laying reinforced cement concrete M-25 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5 |
| 9 | Providing and laying reinforced cement concrete M-30 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5 |
| 10 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in All Plasces complete as per Drawing and Technical Specifications. |
| 11 | Providing weep holes in plain/reinforced concrete abutment ,wing wall and return wallwith 75 mm dia P.V.C. Pipe extending through the full width of the structure with slope 1V: 20 H towards drawing face. complete as per drawing and technical specification. |
| 12 | Constraction of Diversion for Bridge |
| 13 | Supply & Laying of 1000 mm dia Np-3 H.P.For Diversion and Hume Pipe Culvert |
| 14 | Laying brick soling on prepared sub-grade with brick on end edging according to lines,graded and cross-section shown on the drawing filling joints with sand and earth,spreading 25 mm thick layer of earth over brick soling,watering and rolling the same wit.For Diaversion |
| 15 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 |
| 16 | Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 |
| 17 | Construction of embankment with approved material obtained from borrow pits(carted earth) with a lift upto 1.5m & lead up to 1000 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 . as per Technical Specification clause 301.5 For Approach Road |
| 18 | Construction of granular sub-base by providing course graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 19 | Providing ,Laying ,spreading and compacting stone aggregates of 63-45 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stone screening,binding materials to fill up theinterstices of coarse aggregate ,watering and compacting to the required density. |
| 20 | Providing ,Laying ,spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stone screening to fill up the nterstices of coarse aggregate ,watering and compacting to the required density |
| 21 | Brick edging on both sides of the road with first class bricks 8 cm wide & 12 cm deep laid with mudmortar including labour & supply of bricks finished to required template and in proper alingment and also including dressing & ramming the excavated earth as directed by the Engineer - in -charge. |
| 22 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer @ 0.75 kg/sqm usingmannual means. |
| 23 | Providing and applying tack coat with Bitumen VG10 using bitumen distributor @ 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MORD Specification Clause 503. |
| 24 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using bitumenVG10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat Type C as per Technical Specification Clause 508. |
| 25 | Providing and laying seal coat sealing the voids in a bituminous VG 10 surface laid to the specified levels, grade and cross fall using Type C as per MORD Specification Clause 510 |
| 26 | Construction of shoulder with approved material obtained from borrow pits with a lift upto 1.5m & lead up to 1000 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2. as per Technical Specification clause 301.5. carted eartth. |
| 27 | Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering, as per drawing and technical specification Clauses 600, 1202 & 1203.For H/P Culvert |
| 28 | Pointing with cement mortar (1:3) on brick work as per drawing and technical specification Clauses 613.3 & 1204 For H/P Culvert Total in Figures . 10134574.5 23 INR One Crore One Lakh Thirty Four Thousand Five Hundred & Seventy Four and Paise Fifty Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |