| 1 | Earth Work in Excavation in Trenches Excavation for roadwork in soil using hydraulic excavatior including loading and unloading in tipper,trimming bottom and side slop trenches for carrring of cut earth to emankment site with all lift and lead up to 1000 mMORTH as per 3.06 sppecification 301 (Excluding GST.) |
| 2 | Construction of Embankment with Material obtained from BorrowpitsConstruction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. as per 3.06 and reference to MORTH sppecification 305 (Excluding GST.) |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. as per 3.17 and reference to MORTH sppecification 305 (Excluding GST.) |
| 4 | Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 as per 3.18 and reference to MORTH sppecification 305( Excluding GST.) |
| 5 | Granular Sub-Base with close Graded Material Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause MORTH specification clause 401 ( Excluding GST.) |
| 6 | WMMProviding, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with pave MORTH specification clause406( Excluding GST.) |
| 7 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. MORTH specification clause502 (Excluding GST.) |
| 8 | Providing and laying dense graded bituminous macadam Gr-2 with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Excluding GST.) |
| 9 | Providing and applying tack coat with bitumen vg-10 using pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.MoRTH specification clause No. 503 (Excluding GST.) |
| 10 | Providing and laying bituminous concrete Gr-2 with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ( Excluding GST.) |
| 11 | Excavation of foundation in ordinary soil including lift upto 1.50 m and lead up 30m and including filling watering and ramming of excavated earth into trenches or into the plinth and removel and disposal of surplus earth as direction by I/E upto a distance of 30m from the foundation trench as per Reference .Reference MORT&H Specifications sl.no 9.01and 304 (Excluding GST (Excluding GST.) |
| 12 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. as per MORT&H Specification no2100 ( Excluding GST.) |
| 13 | RCC(M-20) Grade in drain wall, base comple as per. as per MORT&H Specification no2100 case 2 ( Excluding GST.) |
| 14 | Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications as per MORT&H Specification no 1600 Sr no 9.16 (Excluding GST.) |
| 15 | Supply of 600 mm NP-3 Hume pipes (Excluding GST.) |
| 16 | Laying of 600 mm NP-3 Hume pipes (Excluding GST.) |
| 17 | Brick masonry work in 1:3 in sub- structure complete excluding pointing and plastering, as per drawing and Technical Specifications as per MORT&H Specification no 1300&2200 sl no 9.8 (Excluding GST.) (Excluding GST.) |
| 18 | Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification. as per MORT&H Specification no 1300&2200 Sr no 9.9 (Excluding GST.) |
| 19 | Plane/Reinforced Cement concretem mm 20 in wearing coat M-30 complete as per drawing and Technical Specifications MORT&H Specifications 2702 Sr No.15.18 (Excluding GST.) |
| 20 | Plastering with cement mortar (1:3) in substructure/superstracutre as per technical specification. As per as per MORT&H Specification 1300 &2200 Sr no. 9.10 (Excluding GST.) |
| 21 | Maintenance of constructed road for next five year after completion of work shall be paid. as per GO No 17/2024 /lk0-113/23-1-2024-23-1099-113/2023 yksd fuekZ.k foHkkx vuqHkkx&1 fnuakd 16-01-2024 ,oa dk;kZy; izeq[k vfHk;Urk ;krk;kr oxZ yks0fu0fo0 y[kuÅ dk i=kad&3689lh&vks0ih0vkj0,e0lh0@ ewy&23&24 fnuakd 17-02-2024- Payment shall be done as per satisfaction of engineer in chage regarding maintenance work carried out by contractor (Including Labour Cess but GST will paid extra as applicable). 1st year Maintenance cost total construction of cost Item No. 1 to 20 of Zero percent on 1st year & for 2nd year @ 0.25% on item No, 1 to 20(Excluding GST.) |
| 22 | Maintenance cost for 3rd year @0.50% on item No, 1to 23 |
| 23 | Maintenance cost for 4th year @0.75% on item No, 1 to 23 |
| 24 | Maintenance cost for 5th year @1.00% on item No, 1to 23 Please Enable Macros to View BoQ information |