| 1 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201.S.O.R. Item No. 2.02 |
| 2 | Clearining and Grubbing Road Land (Clearining and grubbing road land inclluding uprooting rank vegetation grass bushes, shurbs, spaling and trees of girth up to 300 mm removal of stumps of such tree cut earlier and disposal of unserviceable material and stacking of serviceable material to be used or auctioned up to a lead of 1000 m includding top organic soil not exceeding 150 mm in thicknees) S.O.R. Item No. 2.03(l)A |
| 3 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with 1000M Lead as per Technical Specification Clause 303.1S.O.R. Item No. 3.18 |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(By Mix in Place Method) With Grading -l Material |
| 5 | Cement Concret Pavment (Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement @ 400 kg per cum,coarse and fine aggregates conforming to IS:383, ...approved curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification) S.O.R. Item No. 6.4 |
| 6 | Direction and Place Identification Signs upto 0.9 sqm Size Board.(Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick....of 4 mm with area not exceeding 0.9 sqm fixed over back support frame of min 40 x 40 x 3 mm Angle mounted on a mild steel circular pipe ...do..do all. S.O.R. Item No. 8.05 |
| 7 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts..do..S.O.R Item No 5.1.1+5.1.2 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) S.O.R Item No 5.3.1.2 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete S.O.R Item No 5.3.17.1 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). S.O.R Item No 5.3.11 |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform S.O.R Item No 5.3.17.3 |
| 12 | Providing tor steel reinforcement of 10 mm dia rods as per approved design and drawing excluding carrige of bars to work site cutting bending, and drawing excluding wire with cost of wire, removal of rust, placing the roods in position all complete as per building specification and direction of E/l. S.O.R Item No 5.5.5 (a) |
| 13 | Cement |
| 14 | Steel |
| 15 | Chips |
| 16 | G.S.T @ 18% |
| 17 | Labour Cess 1% Please Enable Macros to View BoQ information |