| 1 | Part '1' : Bonli Newai Road to Jeewali (Risk & Cost) |
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material up to a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per MoRTH specification clause 201 In area of light jungle |
| 3 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. |
| 4 | Repair to potholes and removal of loose material,trimming of sides,cleaning of surface by providing tack coat,20mm thick pre-mixcarpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 5 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 By Mechanical Means |
| 6 | Part '2' :-Nohata to Rahad(Risk & Cost) |
| 7 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material up to a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per MoRTH specification clause 201 In area of light jungle |
| 8 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. |
| 9 | Repair to potholes and removal of loose material,trimming of sides,cleaning of surface by providing tack coat,20mm thick pre-mixcarpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 10 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 By Mechanical Means |
| 11 | Part '3' :-MDR 1 to Nohta to Ram Nagar Dhaturi(Risk & Cost) |
| 12 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material up to a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per MoRTH specification clause 201 In area of light jungle |
| 13 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. |
| 14 | Repair to potholes and removal of loose material,trimming of sides,cleaning of surface by providing tack coat,20mm thick pre-mixcarpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 15 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 By Mechanical Means Please Enable Macros to View BoQ information |