|
| 1 | PART A- EXCAVATION FOR FOUNDATION, CABLES UPTO 1.50 M LIFT INCLUDING REMOVING THE EXCAVATED MATERIALS UPTO A DISTANCE OF 50 METRES BEYOND THE BUILDING AREA AND LIFT AS SPECIFIED, STACKING AND SPREADING, NECESSARY DEWATERING UNLESS PROVIDED ELSEWHERE, PREPARING THE BED FOR THE FOUNDATION AND REQUIRED BACKFILLING, RAMMING, WATERING, SHORING AND STRUTTING ETC. COMPLETE AS DIRECETD IN EARTH, SOILS OF ALL TYPES, SAND, GRAVEL AND SOFT MURUM. |
| 2 | PART A- SAME AS ITEM NO. 1 BUT IN HARD MURUM |
| 3 | PART A- DE-WATERING THE EXCAVATED TRENCHES & POOLS OF WATER IN THE WORKING AREA BY PROVIDING PUMPS[BY USING PUMPS 5 TO 9 HP PUMPS] AND OTHER DEVICES INCLUDING DISPOSING OFF THE WATER TO A SAFE DISTANCE INCLUDING THE REQUIRED FUEL FOR THE PUMP AND OPERATOR FOR OPERATING THE PUMP AS DIRECTED ETC COMPLETE. |
| 4 | PART A- PROVIDING AND LAYING IN TRENCHES/ WALLS APPROVED MEDIUM/HEAVY GRADE GALVANIZED IRON PIPES WITH ISI MARKED OF JINDAL/TATA/ZENITH OR EQUIVALENT MAKE WITH NECESSARY FITTINGS RAMAKING GOOD THE DEMOLISHED PORTION WITH FILLING TRENCHES & WITH PRIMER OF ANTI-CORROSIVE OIL PAINT , 2 COATS COMPLETE , AS DIRECTED. I) 15 MM DIA MEDIUM |
| 5 | PART A- II) 20 MM DIA MEDIUM |
| 6 | PART A- III) 25 MM DIA MEDIUM |
| 7 | PART A- IV) 40 MM DIA MEDIUM |
| 8 | PART A- V) 50 MM DIA HEAVY TYPE |
| 9 | PART A- VI) 80 MM DIA HEAVY TYPE |
| 10 | PART A- VII) 100 MM DIA. HEAVY TYPE |
| 11 | PART A- PROVIDING AND FIXING IN POSITION------- ULTRA VIOLET STABILIZED UPVC PLUMBING PIPES OF SPECIFIED OUTER DIAMETER REQUIRED STANDARD THICKNESS CONFIRMING TO I.S 4985, INCLUDING NECESSARY FITTINGS CONFIRMING TO IS 7834, SUCH AS P.V.C BENDS, VEES, REDUCERS, CLAMPS, PLUGS ETC. NECESSARY EXCAVATION TRENCH, REFILLING, NECESSARY DRILLING HOLES IN WALLS/ SLAB, ANDMAKING THE GOOD THE SURFACE ETC. COMPLETE. (FOR 10.00 KG/SQ.CM PRESSURE) COMPLETE AS DIRECTED BY EIC.15 MM. DIAMETER |
| 12 | PART A- 20 MM. DIAMETER |
| 13 | PART A- 25 MM. DIAMETER |
| 14 | PART A- 40 MM. DIAMETER |
| 15 | PART A- 50 MM. DIAMETER |
| 16 | PART A- PROVIDING AND FIXING CHLORINATED POLYVINYL CHLORIDE (CPVC) PIPES, HAVING THERMAL STABILITY FOR HOT & COLD WATER SUPPLY, INCLUDING ALL CPVC PLAIN & BRASS THREADED FITTING I/C FIXING THE PIPE WITH CLAMPS AT 1.00 M SPACING. THIS INCLUDES JOINTING OF PIPES & FITTINGS, WITH ONE STEP CPVC SOLVENT CEMENT AND THE COST OF CUTTING CHASES AND MAKING GOOD THE SAME INCLUDING TESTING OF JOINTS COMPLETE AS PER DIRECTION OF ENGINEER IN CHARGE. CONCEALED WORK, INCLUDING CHASES AND MAKING GOOD THE WALL ETC. 15 MM DIA. |
| 17 | PART A- 20 MM DIA. |
| 18 | PART A- 25 MM DIA. |
| 19 | PART A- 40 MM DIA. |
| 20 | PART A- PROVIDING AND FIXING H.D.P. CONTAINER SYNTEX OR ALIKE ONE PIECE MOULDED WATER TANK MADE OUT OF HIGH DENSITY POLYTHYLER AND BUILT CORRUGATED INCLUSIVE OF DELIVERY UP TO DESTINATION HOISTING AND FIXING OF ACCESSORIES SUCH AS INLET, OUTLET OVERFLOW PIPE INCLUSIVE OF ALL TANKS CAPACITY BETWEEN 200 TO 1000 LITERS. |
| 21 | PART A- PROVIDING AND FIXING 10 CM RIGID PVC NAHANI TRAP INCLUDING PVC GRATING, BEND, CONNECTING PIECE OF UPVC PIPE UP TO THE OUTSIDE FACE OF WALL, MAKING THE GOOD DAMAGED SURFACE AND TESTING ETC. COMPLETE. |
| 22 | PART A- PROVIDING AND FIXING 75 MM DIA STABILISER PIPE / P.V.C. SOIL VENT / WASTE PIPE AND WITH NECESSARY FIXTURES AND FITTING SUCH AS BENDS, TEES, SINGLE JUNCTIONS, SLOTTED VENT, CLAMPS, ETC. COMPLETE. |
| 23 | PART A- PROVIDING AND FIXING 110 MM DIA STABILISER PIPE / P.V.C. SOIL VENT / WASTE PIPE AND WITH NECESSARY FIXTURES AND FITTING SUCH AS BENDS, TEES, SINGLE JUNCTIONS, SLOTTED VENT, CLAMPS, ETC. COMPLETE. |
| 24 | PART A- PROVIDING & FIXING COLOURED GLAZED WASH BASIN 55 CM X 40 CM WITH ALL FIXTURES AND FITTINGS TOOLS AND TACKELS AS DIRECTED BY EIC |
| 25 | PART A- PROVIDING & FIXING P.V.C. FLEXIBLE WASTE PIPE 32 MM DIA. WITH ALL FIXTURES AND FITTINGS TOOLS AND TACKELS AS DIRECTED BY EIC |
| 26 | PART A- PROVIDING & FIXING FLUSHING TANK P.V.C. 10 LTR. WITH ALL FIXTURES AND FITTINGS TOOLS AND TACKELS AS DIRECTED BY EIC |
| 27 | PART A- PROVIDING & FIXING P.V.C. CONNECTOR, 15 MM DIA. WITH ALL FIXTURES AND FITTINGS TOOLS AND TACKELS AS DIRECTED BY EIC |
| 28 | PART A- PROVIDING AND FIXING SCREW DOWN BIB / STOP TAP / PILLAR TAP OF BRASS INCLUDING NECESSARY SOCKET UNION NUT COMPLETE. 15 MM DIA. |
| 29 | PART A- 20 MM DIA. |
| 30 | PART A- 25 MM DIA. |
| 31 | PART A- SUPPLY OF JCB PER HOURS ON SITE WITH OPERATOR (WORKING HOURS) |
| 32 | PART A- SUPPLYING LOADING UNLOADING VARIOUS TYPES OF WATER SUPPLY MATERIALS & OTHER FITTINGS/ACCESSORIES, ETC INCLUDING THE CHARGES SUCH AS TRANSPORTATION, HANDLING, STORAGE AND OVERHEADS PROFITS, ETC COMPLETE. AS DIRECTED BY EIC AS PER REQUIREMENT OF JOB NOT INCLUDED IN ABOVE ITEMS.PAYMENT SHALL BE MADE ON THE BASIS OF ACTUAL COST OF MATERIAL PER CASH MEMO/RECEIPTS |
| 33 | PART B- SUPPLY OF PLUMBER/SUPERVISOR FOR 8 HOURS ALONG WITH WITH TOOLS & TACKLES FOR SKILLED PLUMBING JOBS. (APPLICABLE ONLY FOR WORKERS NOT COVERED UNDER WAGE AGREEMENT) (RATE AS PER HR CIRCULAR FOR MIN. WAGES WHICH IS PRESENTLY Rs. 807.23/REVISION IN CIRCULAR) (IN ADDITION TO MIN. WAGES, PF 13% + BONUS 8.33% + ESIC 3.25% AS APPLICABLE TO BE PAID HENCE TOTAL DERIVED RATE TO BE PAID TO CONTRACTOR WILL BE Rs. 807.23/REVISION IN CIRCULAR + PF 13% + BONUS 8.33% + ESIC 3.25% AS APPLICABLE PRESENTLY PER DAY)NOTE: THIS IS FIXED RATE. QUOTED PERCENTAGE NOT APPLICABLE. |
| 34 | PART B- SUPPLY OF LABOURS WITH TOOLS AND TACKLES FOR 8 HRS. SHIFT (APPLICABLE ONLY FOR WORKERS NOT COVERED UNDER WAGE AGREEMENT) (RATE AS PER HR CIRCULAR FOR MIN. WAGES WHICH IS PRESENTLY Rs.765.69/REVISION IN CIRCULAR) (IN ADDITION TO MIN. WAGES, PF 13% + BONUS 8.33% + ESIC 3.25% AS APPLICABLE TO BE PAID, HENCE TOTAL DERIVED RATE TO BE PAID TO CONTRACTOR WILL BE Rs.765.69/REVISION IN CIRCULAR + PF 13% + BONUS 8.33% + ESIC 3.25% AS APPLICABLE PRESENTLY PER DAY)NOTE: THIS IS FIXED RATE. QUOTED PERCENTAGE NOT APPLICABLE. |
| 35 | PART B- SUPPLY OF UNSKILLED LABOURS WITH TOOLS AND TACKLES FOR 8 HRS. SHIFT (ONLY FOR CONTRACT WORKERS COVERED UNDER WAGE AGREEMENT i.e. “A” CATEGORY WORKERS,) (TO BE PAID FOR MAXIMUM OF 261 DAYS PER LABOUR PER YEAR AS HOLIDAY PART 104 DAYS IS COVERED IN PART B (2) OF BOQ)NOTE: THIS IS FIXED RATE. QUOTED PERCENTAGE NOT APPLICABLE. |
| 36 | PART B - ADDITIONAL EXPENDITURE DUE TO WAGE REVISION OF WAGE AGREEMENT COVERED WORKERS I.E. ' A' CATEGORY WORKERS PER DAY/LABOUR (UNSKILLED) FIXED PART OF WAGES TO BE PAID FOR 365 DAYS TO EACH WORKER PER YEARNOTE: (Rate will be paid as per actual calculation wage calculation sheet Annexure -XX of NIT) Please Enable Macros to View BoQ information |
| 37 | PART B - ADDITIONAL EXPENDITURE DUE TO WAGE REVISION OF WAGE AGREEMENT COVERED WORKERS I.E. ' A' CATEGORY WORKERS PER DAY/LABOUR (UNSKILLED) FIXED PART OF WAGES TO BE PAID FOR 365 DAYS TO EACH WORKER PER YEARNOTE: (Rate will be paid as per actual calculation wage calculation sheet Annexure -XX of NIT) Please Enable Macros to View BoQ information |