| 1 | Supply carriage and laying of 100 micron polythene under bed lining watercourse |
| 2 | Credit of old bricks and bats |
| 3 | Supply, carriage and fixing of R.C.C panels of requisite size as per approved design drawing and P.W.D. Specifications (24` x 24`) |
| 4 | Supply, carriage and fixing of R.C.C lids Dia 18` |
| 5 | Civil Work |
| 6 | HSR Item 4.12.1-Earth work in excavation by mechanicalmeans (Hydraulic excavator)/manual means over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqmon plan) including getting out and disposal of excavated earthlead up to 50 m and lift up to 1.5 m, as directed by Engineerin-charge. 1. All kinds of soilHSR Rate(Rs.) 78.00 Through Rate |
| 7 | HSR Item 4.33-Excavating, supplying and filling of local earth(including royalty) by mechanical transport up to a lead of 1km also including ramming and watering of the earth in layersnot exceeding 20 cm in trenches, plinth, sides of foundationetc. complete.HSR Rate(Rs.) 138.00 Through Rate |
| 8 | HSR Item 6.1.6-Providing and laying in position cementconcrete of specified grade excluding the cost of centeringand shuttering - All work below plinth level and up to Floor IVlevel: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 gradedstone aggregate 40 mm nominal size)HSR Rate(Rs.) 2442.00 Through Rate |
| 9 | HSR Item 5.23.2-Demolishing cement concrete manually/ bymechanical means including disposal of material within 50metres lead as per direction of Engineer - in - charge. 2.Nominal concrete 1:2:4 or leaner mix (i/c equivalent designmix)HSR Rate(Rs.) 1149.00 Through Rate |
| 10 | HSR Item 5.7.4-Demolishing brick work manually/ bymechanical means including stacking of serviceable materialand disposal of unserviceable material within 50 metres leadas per direction of Engineer-in-charge. 4. In cement mortarHSR Rate(Rs.) 585.00 Through Rate |
| 11 | HSR Item 7.21.1-Brick work with common burnt clay nonmodular bricks of class designation 10.5 in foundation andplinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) HSR Rate(Rs.) 4128.00 Through Rate |
| 12 | [11.8.1]12 mm cement plaster of mix : 1. 1:4 (1 cement: 4 coarse sand) HSR Rate (Rs.) 114.00 Through Rate |
| 13 | [14.1]Dressing bed and preparation of sub grade for lining by mechanical/ mannual means HSR Rate (Rs.) 4.00 Through Rate |
| 14 | [7.65]Extra for specially moulded brick work in circular work such as wells, shafts, circular sumps, pumps chambers, etc. in which specially moulded or cut-bricks have to be used: but for which no centring or supports are required up to 4.5 metres internal diameter. HSR Rate (Rs.) 131.00 Through Rate |
| 15 | [4.32]-Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layerby ramming and watering, lead up to 50 m and lift up to 1.5 m.HSR Rate(Rs.) 46.00 Through Rate Please Enable Macros to View BoQ information |