| 1 | Supply Part HT Line |
| 2 | Steel Tubular Poles (11 m, Working Load > 227 kgf/m²) (with Ruling Span 90 m, 8 No. Run thro' and 3 No. Double Pole Dead End Structures) |
| 3 | Muffs (2000mm) with concerete filling |
| 4 | Cross Arm: [Channel Iron (100x50x6 mm), Length: 1800 mm i/c tolerance of 100 mm either side) x 8 structure |
| 5 | Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures |
| 6 | Pole Top Bracket [MSCI:100x50x6 mm- 100 mm] |
| 7 | Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm x 2 No. |
| 8 | X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No. |
| 9 | X-Arm (Horizontal) - MS Channel Iron C type: 100X50x6, Length: 2340 mm x 2 No.] ∆ Formation |
| 10 | X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 11 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 12 | GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm |
| 13 | Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps, Straight stapples & Bend Stapples etc.) x (3 No. conductors) x (2 No. sides) |
| 14 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure |
| 15 | Stay set complete in all respect (i/c Stay Clamp) (1No./ Single Pole , 4 No. / Double Pole Structures) |
| 16 | Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set) |
| 17 | HT Earthing set complete |
| 18 | Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 3% (Sag, Earthing, Cross lacing above road wastage and for connecting with earth coil))} @ 0.102 kg/m |
| 19 | Eye Hook for earth wire |
| 20 | Earth Reel |
| 21 | MS Angle Iron: 50x50x6, Length : 2800 mm for Road crossing |
| 22 | Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro' structure: 2 No ] |
| 23 | Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro' structure: 2 No] |
| 24 | Danger Plate (250X200X1.6 mm) |
| 25 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 26 | Barbed Wire |
| 27 | Red Oxide |
| 28 | Aluminium Paint |
| 29 | Erection Part HT line |
| 30 | Erection of Steel Tubular Pole (Single pole strs.) complete in all respect. |
| 31 | Erection of Steel Tubular Pole (Double pole strs.) complete in all respect. |
| 32 | Erection of Stay set H.T. complete in all respect. |
| 33 | Erection of HT earthing set complete in all respect |
| 34 | Erection /Sagging charges of conductor 100 Sqr mm including , Stringing and sagging and binding with insulators complete in all respect |
| 35 | Erection /Sagging charges of GI wire 8 SWG for continuous Earth complete in all respect |
| 36 | Erection of GO AB Switch Unit (11kV, 400A, 25 KA ) complete in all respect |
| 37 | Dismantling charges of conductor 100 sqr mm including Removal of conductor,De-Stringing complete in all respect |
| 38 | Supply Part CT-PT Unit |
| 39 | CT-PT Combined Unit [PT:11 kV/110 V) ; CT:50/5A] |
| 40 | 3-phase, 3/4-Wire CT-PT operated Static Trivector Meter(DLMS Compliant) |
| 41 | PVC Multistrand 4 mm² copper wire with Φ-1 inch GI pipe for concealing & bend joint/elbow |
| 42 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm |
| 43 | X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of CT-PT Unit] |
| 44 | MS Angle Iron (50X50x6 mm), Length : 2800 mm x 4 Nos |
| 45 | MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos |
| 46 | Half Clamp (M.S. Flat 50X6 mm) |
| 47 | Full Clamps (M.S. Flat 50X6 mm) |
| 48 | Nuts and Bolts of Various Sizes |
| 49 | Aluminium Thimble |
| 50 | Copper tinned Thimble |
| 51 | Danger Plate |
| 52 | Barbed Wire |
| 53 | Red Oxide |
| 54 | Aluminium Paint. |
| 55 | Erection Part CT-PT Unit |
| 56 | Erection of CT-PT Combined Unit [PT:11 kV/110 V) ; CT:10-400/5A] Complete in all respect Please Enable Macros to View BoQ information |