| 1 | Construction of Embankment with Material Obtained from R.O.W. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 |
| 2 | Construction of granular sub-base by providing close graded material , spreading in uniform layers with motor grader on prepared surface , mixing by mix in place method with rotavator at OMC , and compacting with vibratory rollar to achieve the desired density , complete as per clause 401 |
| 3 | Providng & laying , spreading and compacting stone aggregates of specific sizes (45-63mm S.S.B.) to water bound macadam specification including spreading in uniform thickness , hand packing , rolling with smooth roller 80-100 KN in stage to proper grade and camber , applying and brooming , crushable screening to fill-up the interstices of coarse aggregate , watering and compacting to the require density grading 2 as per Technical Specification Clause 405. |
| 4 | Providng & laying , spreading and compacting stone aggregates of specific sizes (22.4-53 mm S.S.B) .to water bound macadam specification including spreading in uniform thickness , hand packing , rolling with smooth roller 80-100 KN in stage to proper grade and camber , applying and brooming , crushable screening to fill-up the interstices of coarse aggregate , watering and compacting to the require density grading 3 as per Technical Specification Clause 405.. |
| 5 | Brick edging on both side of the road with 1st class bricks laid on edge with mud mortar including Cost of all labour materials T&P etc . Complete. |
| 6 | Providing and applying primer coat with bitumen slow setting emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.as per technical specification clasue 502. |
| 7 | Providing and applying tack coat with bitumen VG-10 pressure distributor at the rate of 0.30 kg. Per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per Technical Specification Clasue 503. |
| 8 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm. to 11.2 mm aggregates either using penetration grade bitumen or emulsion to required line. Grade and level to serve as wearing coarse on a perviously prepared base, including mixing in suitable plant , laying and rolling with a three wheeled 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clasue 508. |
| 9 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat as per Technical Spefification Clause -510. |
| 10 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 |
| 11 | Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work. |
| 12 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1100.(600 mm Dia Hume Pipe) |
| 13 | M-150 brick work in 1:6 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. As per SOR 305b |
| 14 | Struck pointing with cement mortar consisting 1 part cement and 2 parts of sand of 1.25 fineness modulus including supply of all materials labour and T&P etc. required for proper completion of the work. As per SOR 574 |
| 15 | 15mm thick plaster with cement mortar consisting of 1 part cement and 4 part of approved coarse sand. Minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper completion of the work. As per SOR 584 |
| 16 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. |
| 17 | The routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 1st year maintenance cost |
| 18 | The routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 2nd year maintenance cost |
| 19 | The routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 3rd year maintenance cost |
| 20 | The routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 4th year maintenance cost |
| 21 | The routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 5th year maintenance cost Please Enable Macros to View BoQ information |