| 1 | Construction of new Electrical infrastructure for Release of Sanctioned load to the consumer’s premises against deposit works. |
| 2 | PCC. Pele 8.5/9 Mtr. loog. |
| 3 | ST.P. Pele 9/11 Mtr. loog. |
| 4 | 25/63/100 K.V.A. Transformer. |
| 5 | 250 KVA. Transformer |
| 6 | ACSR Rabbit/Dog/Racoon/Weasel Conductor |
| 7 | 11 KV XLPE Cable (3x70/120/185 sqmm) |
| 8 | ABC (3X126/95/70/25/16 Sq.mm.) |
| 9 | 11 KV Pilfer resistance metering cubicle |
| 10 | 11 K.V. Pole mounted C.T/P.T. |
| 11 | D.P. Box 3 phase |
| 12 | 11 K.V. 3X70 Sqmm XLPE Cable Outdoor Jointing Kit |
| 13 | 11 K.V. 3X70 Sq mes. XLPE Cable Indoor Joining Kit |
| 14 | Fabrication, Erection of Sub-Station type Double Pole on 11/15 mtr. long STP/ P.C.C. pole with necessary clamps, accessories required including fixing of Top Chanel 125X65X6mm (2240 mm long) ons Nis, Dropper Channel 100X50 m (2028 mm long) 01 Nos, with arrangement of fixing of 06 Nos. Pin Insulator. Sub-Station has angle of 65X65X6 mm. (2250 mm) channel 02 Nos. Grouting with cement, sand and brick ballast in ratio 1:4:8 making plinth upto with of 300 mm. Painting of poles with primer and cement paint as per RESPO specification complete in all respect. |
| 15 | Dragging of STP/P.C.C. Pole to pit site, digging of pit erection and grouting (as per RESPO norms) of 11 K.V. 9/11/8.5 mtr. Long STP/ P.C.C. pole with fixing of necessary items, such as V-type X-arm, F-Bracket, 11 K.V. pin/Disc insulator, guarding angle (1.8 mm. 65X65X6 mm) with nut & bolts its ramming as per RESPO specification. Only pole & insulator shall be supplied by the department. |
| 16 | Ordinary earthing by M.S. earth rod 2500 mm, long as per RESPO specification (Only G.I wire and earth rod shall be supplied by the department) |
| 17 | Grouting and nozzeling of Stay set complete of size 16X1800 mm, with cement, sand, brick-blast 1:3:6 as per RESPO specification. (Only stay wire shall be provided by department) |
| 18 | Laying and sagging of 3 phase 3 wire 11 KV. line on ACSR Weasel/Rabbit/Racoon/Dog conductor as per RESPO specification and direction of E/I |
| 19 | Laying of 11 K.V. XLPE cable size 3X70/120/185 Sq.mm. in single circuit as per ISS norms including all the required material |
| 20 | Earthing of 11/04 KV Distribution Transformer's body & neutral by way of boring and lowering of ISI marked two nos. GI pipe 1.5\\" dia 20 m deep from the ground level with solid cone at the lower end of GI pipe. One end of GI strip of size 50X6 mm. will be connected with neutral/body of the Transformer & other end will be clamped & welded with GI Pipe as per UPPCL norms (All the material will be arranged by contractor at their own cost) |
| 21 | Earthing of 11 K.V. Pilfer resistance Meturing body/neutral by way of boring and lowering of ISI marked two Nos. G.I pipe 1.5\\" dia 20 in deep from the ground level with solid cone at the lower end of G. pipe. One end of GI strip of size 50X6 mm. will be connected with neutral and body of the bus Coupler & other end will be clamped & welded with G.I Pipe as per UPPCL norms (All the material will be arranged by contractor at their own cost) |
| 22 | Installation of 11 K.V. Pilfer resistances Metering Unit with safe energisation. |
| 23 | Mounting of double metering unit on double pole, only double metering unit shall be supplied by department. |
| 24 | AB Conductor Stringing & sagging of 3 phase with necessary clamp, eye hook, Suspension clamp, A-B type connector etc. on ABC New line as per RESPO specification and direction on E/I, ABC shall be supplied by department |
| 25 | Fixing of 3 phase distribution box/Kiosk on the LT. Poles including all clamps and material required for mounting connection and sealing. |
| 26 | Hosting of 11 K.V. XLPE cable will be passed through M.S. Pipe of required size duly clamped with pole at the bottom, middle and top of the pole. |
| 27 | Safe installation 25/63/100 K.V.A. Transformer on double pole by providing and fixing of all accessories along with making H.T/LT. connections and its commissioning. |
| 28 | Safe installation 250 K.V.A. Transformer on double pole/Plinth by providing and fixing of all accessories along with making H.T/L.T. connections and its commissioning. |
| 29 | All taxess as aplicable shall be paid time to time extra Please Enable Macros to View BoQ information |