| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.1. |
| 2 | Granular Sub-base with Well Graded Material (Table 400.1) (A)By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(i)For Grading I Material including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. |
| 3 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 14.1C. grade M 30 |
| 4 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 III. grade M 20 including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. |
| 5 | Supplying, fixing and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications . |
| 6 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.) |
| 7 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I.P.C.C grade M 10 including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. ((i)Nominal mix 1:3:6) |
| 8 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 III. grade M 20 including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. |
| 9 | Tubler MS Pipe of 50 mm (2 Inch) Diameter |
| 10 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Mechanical Means) (For approach road) |
| 11 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Carted 2.00 Km) (For approach road) |
| 12 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (For approach road) |
| 13 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (For approach road) |
| 14 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (For approach road) |
| 15 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. |
| 16 | Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. Please Enable Macros to View BoQ information |