| 1 | Items of Emergent and Maintenance Works |
| 2 | Carriage of T and P items |
| 3 | Branch Cutting |
| 4 | Route clearance for making path for safe working |
| 5 | Unloading of PCC 8 Mtr Pole |
| 6 | Average carriage of PCC 8 Mtr Pole upto 100 Mtr |
| 7 | Average carriage of PCC 8 Mtr Pole upto 100 - 200 Mtr |
| 8 | Average carriage of PCC 8 Mtr Pole above 200 Mtr |
| 9 | Erection of PCC 8 Mtr Pole |
| 10 | Dismantling of PCC Pole 8 Mtr Long |
| 11 | Unloading of ST 8 Mtr Pole |
| 12 | Average carriage of ST 8 Mtr Pole upto 100 Mtr |
| 13 | Average carriage of ST 8 Mtr Pole upto 100 - 200 Mtr |
| 14 | Average carriage of ST 8 Mtr Pole above 200 Mtr |
| 15 | Erection of ST 8 Mtr Pole |
| 16 | Dismantling of ST Pole 8 Mtr Long |
| 17 | Unloading of PCC 9 Mtr Pole |
| 18 | Average carriage of PCC 9 Mtr Pole upto 100 Mtr |
| 19 | Average carriage of PCC 9 Mtr Pole upto 100 - 200 Mtr |
| 20 | Average carriage of PCC 9 Mtr Pole above 200 Mtr |
| 21 | Erection of PCC 9 Mtr Pole |
| 22 | Dismantling of PCC Pole 9 Mtr Long |
| 23 | Unloading of ST 9 Mtr Pole |
| 24 | Average carriage of ST 9 Mtr Pole upto 100 Mtr |
| 25 | Average carriage of ST 9 Mtr Pole upto 100 - 200 Mtr |
| 26 | Average carriage of ST 9 Mtr Pole above 200 Mtr |
| 27 | Erection of ST 9 Mtr Pole |
| 28 | Dismantling of ST Pole 9 Mtr Long |
| 29 | Unloading of PCC 11 Mtr Pole |
| 30 | Average carriage of PCC 11 Mtr Pole upto 100 Mtr |
| 31 | Average carriage of PCC 11 Mtr Pole upto 100 - 200 Mtr |
| 32 | Average carriage of PCC 11 Mtr Pole above 200 Mtr |
| 33 | Erection of PCC 11 Mtr Pole |
| 34 | Dismantling of PCC Pole11 Mtr Long |
| 35 | Unloading of ST 11 Mtr Pole |
| 36 | Average carriage of ST 11 Mtr Pole upto 100 Mtr |
| 37 | Average carriage of ST 11 Mtr Pole upto 100 - 200 Mtr |
| 38 | Average carriage of ST 11 Mtr Pole above 200 Mtr |
| 39 | Erection of ST 11 Mtr Pole |
| 40 | Dismantling of ST Pole 11 Mtr Long |
| 41 | Unloading of ST 13 Mtr Pole |
| 42 | Average carriage of ST 13 Mtr Pole upto 100 Mtr |
| 43 | Average carriage of ST 13 Mtr Pole upto 100 - 200 Mtr |
| 44 | Average carriage of ST 13 Mtr Pole above 200 Mtr |
| 45 | Erection of ST 13 Mtr Pole |
| 46 | Dismantling of ST Pole 13 Mtr Long |
| 47 | Straightening of tilted 8Mtr PCC pole |
| 48 | Straightening of tilted 9Mtr PCC pole |
| 49 | Straightening of tilted 11Mtr PCC pole |
| 50 | Straightening of tilted 8Mtr ST pole |
| 51 | Straightening of tilted 9Mtr ST pole |
| 52 | Straightening of tilted 11Mtr ST pole |
| 53 | Straightening of tilted 13Mtr ST pole |
| 54 | Fixing of Barbed Wire for anti Climbing |
| 55 | Erection of Danger Plates with Clamps |
| 56 | Erection of Anti Climbing Device with Clamps |
| 57 | Painting of LT ST Poles (8Mtr,9Mtr,11Mtr) and allied material |
| 58 | Painting of HT ST Poles (8Mtr,9Mtr,11Mtr) and allied material |
| 59 | Painting of HT ST Poles (13Mtr) and allied material |
| 60 | Painting of Substation Poles and allied material |
| 61 | Cement Bottoming of PCC/ST Poles of all sizes (Material for Cement Bottoming is to be provided by contractor) |
| 62 | Unloading of Line Materials |
| 63 | Watch and Ward of Material |
| 64 | Punching/Making of Holes on M S Channel |
| 65 | Punching/Making of Holes on M S Angle Iron/Braces |
| 66 | Fabrication of Ms Steel i.e Channel , Angle Braces etc at site as requirements |
| 67 | Fixing of M S Channels 9 feet long |
| 68 | Fixing of MS Channels 4.5/3 feet long along with Braces |
| 69 | Fixing of M S Angle Iron 9 feet long |
| 70 | Fixing of MS Angle Iron 5/4.5/3 feet long |
| 71 | Dismantling of M S Channels 9 feet long |
| 72 | Dismantling of MS Channels 4.5/3 feet long along with Braces |
| 73 | Dismantling of M S Angle Iron 9 feet long |
| 74 | Dismantling of MS Angle Iron 5/4.5/3 feet long |
| 75 | Fixing of U-Clamps and Shackle Insulators |
| 76 | Fixing/Installation of 11 KV Pin Insulators with Pins |
| 77 | Fixing/Installation of 11 KV Disc Insulators with fittings |
| 78 | Dismantling of Pin/ Disc/Shackle Insulators |
| 79 | Installation of Link/DO/HG/Knife/LA Set |
| 80 | Dismantling of Link/DO/HG/Knife/LA Set |
| 81 | Installation of GO Set |
| 82 | Dismantling of GO Set |
| 83 | Unloading of CT/PT Unit |
| 84 | Average carriage of CT/PT Unit upto 100 Mtr |
| 85 | Average carriage of CT/PT upto 100 - 200 Mtr |
| 86 | Erection of CT/PT Unit along with Trivector Meter |
| 87 | Erection of CTPT Unit |
| 88 | Testing and commissioning of CT/PT Unit |
| 89 | Earthing of CT/PT Unit |
| 90 | Unloading of 25/63/100KVA Transformer |
| 91 | Unloading of 250/400/500/630 KVA Transformer |
| 92 | Construction of Cement Platform (8x8x6), 3feet below ground level & 3feet below ground level for Distribution transformer 400/500/630 KVA (Matrerial to be provided by contractor) |
| 93 | Average carriage of 25/63/100 KVA upto 100 Mtr |
| 94 | Average carriage of 25/63/100 KVA 100 - 200 Mtr |
| 95 | Average carriage of 25/63/100 KVA above 200 Mtr |
| 96 | Average carriage of 250/400/500/630 KVA upto 100 Mtr |
| 97 | Average carriage of 250/400/500/630 KVA 100 - 200 Mtr |
| 98 | Average carriage of 250/400/500/630 KVA above 200 Mtr |
| 99 | Mounting of 25/63/100 KVA Transformer |
| 100 | Mounting of 250/400/500/630 KVA Transformer |
| 101 | Unmounting of 25/63/100 KVA Transformer |
| 102 | Unmounting of 250/400/500/630 KVA Transformer |
| 103 | Erection of HVDS 25KVA |
| 104 | Dismantling of HVDS 25KVA |
| 105 | Earthing of HVDS 25KVA |
| 106 | Fixing of Jumpers |
| 107 | Dismantling of Jumper |
| 108 | Earthing of poles for HT Line |
| 109 | Earthing of poles for LT Line |
| 110 | Earthing of Substation complete(Poles,Transformer,LA) |
| 111 | Fixing of LT Circuit Component of Substation (LT cables,Thimbles,Busbar,Shackle insulators) with Fuse Set / MCCB with Box |
| 112 | Dismantling of LT Circuit Component of Substation (LT cables,Thimbles,Busbar,Shackle insulators) with Fuse Set / MCCB with Box |
| 113 | Testing and commissioning of Substation |
| 114 | De-Reeling & Laying of ACSR Conductor on Ground 20/30 mmsq |
| 115 | Stringing of ACSR Conductor 20/30mmsq/Squirel /Weasel |
| 116 | Dismantling of Old Squirell ACSR Conductor |
| 117 | Dismantling of Old Weasel ACSR Conductor |
| 118 | De-Reeling & Laying of ACSR Conductor on Ground 50/100 mmsq |
| 119 | Stringing of ACSR Conductor 50/100 mmsq/Rabbit/Dog |
| 120 | Dismantling of Old Rabbit ACSR Conductor |
| 121 | Dismantling of Old Dog ACSR Conductor |
| 122 | Tightening of loose conductor |
| 123 | Erection of Guys in HT/LT Line |
| 124 | Dismantling of Guys in HT/LT Line |
| 125 | Fixing of Suspension/Anchoring Clamps |
| 126 | De-Reeling & Laying of HT AB/XLPE Cable (25/35/50 mmsq) on ground |
| 127 | Erection/Stringining of HT AB/XLPE Cable (25/35/50 mmsq) |
| 128 | Dismantling of HT AB/XLPE Cable 25/35/50 mmsq |
| 129 | De-Reeling & Laying of HT AB/XLPE Cable 70/95/120 mmsq on ground |
| 130 | Erection/Stringining of HT AB/XLPE Cable 70/95/120 mmsq |
| 131 | Dismantling of HT AB/XLPE Cable 70/95/120 mmsq |
| 132 | De-Reeling & Laying of HT AB/XLPE Cable 150/185mmsq on ground |
| 133 | Erection/Stringining of HT AB/XLPE Cable 150/185mmsq |
| 134 | Dismantling of HT AB/XLPE Cable 150/185mmsq |
| 135 | De-Reeling & Laying of HT AB/XLPE Cable 240/300 mmsq on ground |
| 136 | Erection/Stringining of HT AB/XLPE Cable 240/300 mmsq |
| 137 | Dismantling of LT AB/XLPE Cable 240/300 mmsq |
| 138 | De-Reeling & Laying of LT AB/XLPE Cable 25/35/50 mmsq on ground |
| 139 | Erection/Stringining of LT AB/XLPE Cable 25/35/50 mmsq |
| 140 | Dismantling of LT AB/XLPE Cable 25/35/50 mmsq |
| 141 | De-Reeling & Laying of LT AB/XLPE Cable 70/95/120 mmsq on ground |
| 142 | Erection/Stringining of LT AB/XLPE Cable 70/95/120 mmsq |
| 143 | Dismantling of LT AB/XLPE Cable 70/95/120 mmsq |
| 144 | De-Reeling & Laying of LT AB/XLPE Cable 150/185mmsq on ground |
| 145 | Erection/Stringining of LT AB/XLPE Cable 150/185mmsq |
| 146 | Dismantling of LT AB/XLPE Cable 150/185mmsq |
| 147 | De-Reeling & Laying of LT AB/XLPE Cable 240/300 mmsq on ground |
| 148 | Erection/Stringining of LT AB/XLPE Cable 240/300 mmsq |
| 149 | Dismantling of HT AB/XLPE Cable 240/300 mmsq |
| 150 | Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables of HT/LT Lines |
| 151 | Fixing of Mid Span Straight Jointer Kit for AB/XLPE cables of HT/LT Lines |
| 152 | Earthing of Cable |
| 153 | Testing and commissioning of AB/XLPE cables of HT/LT Lines |
| 154 | Testing and commissioning of HT/LT Lines |
| 155 | Inspection of AB/XLPE cables of HT/LT Lines |
| 156 | Inspection of HT/LT Lines |
| 157 | Fixing of IPC 120/50mm |
| 158 | Fixing of Single Phase Meters |
| 159 | Fixing of Three Phase Meters |
| 160 | Dismantling of Single Phase Meters |
| 161 | Dismantling of Three Phase Meters |
| 162 | Laying & Erection of Service Wire Twin Core 4/6 mmsq |
| 163 | Laying & Erection of Service Wire Twin Core 10/16 mmsq |
| 164 | Dismantling of Service Wire Twin Core 4/6 mmsq |
| 165 | Dismantling of Service Wire Twin Core 10/16 mmsq |
| 166 | Installation of 3 Phase 4 Wire Progidy Energy Meter |
| 167 | Dismantling of 3 Phase 4 Wire Progidy Energy Meter |
| 168 | Erection of DB/METER Box on PCC/ST Poles |
| 169 | Fixing of Guard netting of HT/LT Line |
| 170 | Dismantling of Guard netting of HT/LT Line |
| 171 | Supply and installation of Chain link Fencing of 11/0.415 kV Yard of Substation by way of Mass Concrete in Foundations and chain link fencing of 6 ft height with access door facility including Painting with aluminum paint of approved brand and Manufacture to give an even shade. |
| 172 | Electrical illumination of Government buildings including laying and dismantling of LED Laries/Stripes of 15 Mtr length of different colors for Ist day on rental basis (Under Jurisdiction of ED-II Jammu). |
| 173 | Electrical illumination of Government buildings including laying and dismantling of LED Laries/Stripes of 30 Mtr length of different colors for Ist day on rental basis (Under Jurisdiction of ED-II Jammu). |
| 174 | Collection & Manual Carriage of Un-Utilized 8/9 Mtr. PCC Poles lying on Ground to Stacking Site (Average carriage 100 Mtr), under the Municipal Limits of Jammu City falling under the jurisdiction Electric Division-II, JPDC Jammu. |
| 175 | Dismantling of Un-utilized/Idle PCC Poles 8/9 Mtr, back filling of Pit with earth, Manual Carriage of Dismantled Poles from dismantling site to Stacking Site (Average carriage 100 Mtr), under the Municipal Limits of Jammu City falling under the jurisdiction of Electric Division-II, JPDC Jammu. |
| 176 | Collection & Manual Carriage of Un-utilized 8/9 Mtr ST Poles lying on ground to stacking site (Average carriage 100 Mtr), under the Municipal Limits of Jammu City falling under the jurisdiction of Electric Division-II, JPDC Jammu and Write Back to Divisional Store Miran-Sahib. |
| 177 | Dismantling of Un-Utilized/Idle 8/9 Mtr ST Poles, Back filling of Pit with earth, Manual Carriage of Dismantling Poles from dismantling site to Stacking Site (Average carriage 100 Mtr), under the Municipal Limits of Jammu City falling under the jurisdiction of Electric Division-II, JPDC Jammu and Write Back to Divisional Store Miran-Sahib. |
| 178 | Loading of Dismantled Un-Utilized/Idle 8/9 Mtr PCC Poles from stacking sites in the Truck at different locations falling under the jurisdiction of ED-II Jammu and Mechanical carriage including unloading at Dumping site Bhagwati Nagar near Fourth Tawi Bridge and if any healthy/un-broken PCC poles found shall be write back to divisional stores. |
| 179 | Loading of Dismantled Un-Utilized/Idle 8/9 Mtr ST Poles from stacking sites in the Truck at different locations falling under the jurisdiction of ED-II Jammu and Mechanical carriage including unloading and Stacking at Divisional Stores Miran Sahib. |
| 180 | Providing and fixing of Twin core LT AB cable 16 mm Sq. with 16 mm sq. messanger wire with suitable IPC for new street light and for functioning of existing Street Lights. |
| 181 | Fixing of Nuts and Bolts( All Sizes) |
| 182 | Stone Pad ( 300mmx300mmx75mm) |
| 183 | Write Back of Dismantled Material to Divisional Store |
| 184 | Unloading of write back Material at Divisional Store Miran Sahib Jammu Please Enable Macros to View BoQ information |