|
| 1 | Hire and labour charges for erection of pandel for counters of distribution and receiving of polling materials with strong sallballha/ bamboo structure with tarpaulin shed , 3 side cover with blue drill , front and both side top cover with blue drill, ceiling with cloth , low height partition with bamboo frame and cloth for all sides of each counter including bamboo barricade as required in front and all side of counter. Including provision of 6 chairs and 2 Nos(4’ x 3’ size) tables in each counter and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. Rate for hire and labour charges including carriage up to 4 days. |
| 2 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 3 | Hire and labour charges for erection of pandel for other counters with strong Salballah/ bamboo structure with tarpaulin shed with cloth ceiling back side full cover with blue drill, front and both side top cover with blue drill, front and both side cover with 3’-0’’ high low height partition with both side cloth including bamboo structure and bamboo barricade as required. Including provision of 2 Nos (4’ x 3’ size) table & 4 chairs in each counter including cutting drain in all side counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. Rate for hire and labour charges including carriage up to 4 days. |
| 4 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 5 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed including ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete a) With 3 side cover with blue drill . Rate for hire and labour charges including carriage up to 4 days. |
| 6 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 7 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed including ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete b) With 3 side cover with hessian. Rate for hire and labour charges including carriage up to 4 days. |
| 8 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 9 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed including ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. c) With 3 side cover with CGI sheet. Rate for hire and labour charges including carriage up to 4 days. |
| 10 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 11 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed including ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. d) With 3 side cover with tarpaulin. Rate for hire and labour charges including carriage up to 4 days. |
| 12 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 13 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed including ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. e) With 4 side cover with blue drill. Rate for hire and labour charges including carriage up to 4 days. |
| 14 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 15 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed including ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. f) With 4 side cover with blue drill on tarpaulin cover. Rate for hire and labour charges including carriage up to 4 days. |
| 16 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 17 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed including ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete.g) With 4 side cover with CGI sheet. Rate for hire and labour charges including carriage up to 4 days. |
| 18 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 19 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed including ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. h) Without side cover.Rate for hire and labour charges including carriage up to 4 days. |
| 20 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 21 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed including ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. i) Without Side Cover above 5 mtr. Rate for hire and labour charges including carriage up to 4 days. |
| 22 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 23 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed without ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. a) With 3 side cover with blue drill . Rate for hire and labour charges including carriage up to 4 days. |
| 24 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 25 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed without ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. b) With 3 side cover with hessian. Rate for hire and labour charges including carriage up to 4 days. |
| 26 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 27 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed without ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. c) With 3 side cover with CGI sheet. Rate for hire and labour charges including carriage up to 4 days. |
| 28 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 29 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed without ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. d) With 3 side cover with tarpaulin. Rate for hire and labour charges including carriage up to 4 days. |
| 30 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 31 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed without ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. e) With 4 side cover with blue drill . Rate for hire and labour charges including carriage up to 4 days. |
| 32 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 33 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed without ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. f) With 4 side cover with blue drill on tarpaulin cover. Rate for hire and labour charges including carriage up to 4 days. |
| 34 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 35 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed without ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete.g) With 4 side cover with CGI sheet. Rate for hire and labour charges including carriage up to 4 days. |
| 36 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 37 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed without ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. h) Without side cover. Rate for hire and labour charges including carriage up to 4 days. |
| 38 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 39 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed without ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete.i) Without Side Cover above 5 mtr. Rate for hire and labour charges including carriage up to 4 days. |
| 40 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 41 | Hire and labour charges for erection of tarpaulin side cover with bamboo structure complete. Rate for hire and labour charges including carriage up to 4 days. |
| 42 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 43 | Hire and labour charges for erection of Hessian shed &hessian side cover with bamboo structure complete. Rate for hire and labour charges including carriage up to 4 days. |
| 44 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 45 | Hire and labour charges for erection of blue drill side cover with bamboo structure complete.Rate for hire and labour charges including carriage up to 4 days. |
| 46 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 47 | Hire and labour charges for erection of ceiling /side cover with cloth including bamboo structure complete.Rate for hire and labour charges including carriage up to 4 days. |
| 48 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 49 | Hire and labour charges for erection of ceiling /side cover with cloth including 2’’ x 1’’ wooden batons and bamboo frame work complete. Rate for hire and labour charges including carriage up to 4 days. |
| 50 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 51 | Hire and labour charges for erection of CGI sheet cover with bamboo structure complete. Rate for hire and labour charges including carriage up to 4 days. |
| 52 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 53 | Hire and labour charges for erection of darma mat cover with bamboo structure complete. Rate for hire and labour charges including carriage up to 4 days. |
| 54 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 55 | Hire and labour charges for erection of pandal with strong bamboo/sal ballah structure with tarpaulin shed including ceiling all side cover with cloth on blue drill wooden platform to floor with mattress. curtain on window and doors including front and outside decoration with all side bamboo barricade including cutting drain in all side of pandel and dressing, chilchilling and cleaning the pandel area. Rate for hire and labour charges including carriage up to 4 days. |
| 56 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 57 | Hire and labour charges for erection of bamboo/sal ballah(3”/4”dia)barricade including fitting and fixing complete. a) Upto 3’ high with 3 rows of bamboo. Rate for hire and labour charges including carriage up to 4 days. |
| 58 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 59 | Hire and labour charges for erection of bamboo/sal ballah(3”/4”dia)barricade including fitting and fixing complete.b) Above 3’ upto 6’ high with 4 rows of bamboo. Rate for hire and labour charges including carriage up to 4 days. |
| 60 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 61 | Hire and labour charges for erection of bamboo/sal ballah(3”/4”dia)barricade including fitting and fixing complete. c) Above 6’- 0” upto 10’-0” high with 5 rows of bamboo. Rate for hire and labour charges including carriage up to 4 days. |
| 62 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 63 | Bamboo frame work to ceiling including supporting bamboos post horizontal bamboo structure. Rate for hire and labour charges including carriage up to 4 days. |
| 64 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 65 | Hire and labour charges for erection of 3’’/4”dia bamboo sal ballah post upto 15’ high complete. Rate for hire and labour charges including carriage up to 4 days. |
| 66 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 67 | Hire and labour charges for erection of temporary lighting tower with 3”/4” dia bamboo sal ballah post and frame work complete. Rate for hire and labour charges including carriage up to 4 days. |
| 68 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 69 | Hire and labour charges for sealing of windows and doors for strong room including fitting and fixing and striking out the same complete:- a)With wooden planks including necessary battons including poly sheet covering etc. complete. Rate for hire and labour charges including carriage up to 4 days. |
| 70 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 71 | Hire and labour charges for sealing of windows and doors for strong room including fitting and fixing and striking out the same complete:- b) With CGI sheet including necessary supports etc. complete. Rate for hire and labour charges including carriage up to 4 days. |
| 72 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 73 | Hire and labour charges for erection of wove wire or similar netting partition fitted and fixed with bamboo and wooden battons frame work including barricade besides counting table . Gap between lower portion of table with cloth side cover including bamboo /batta frame work complete ( payment will be made on wove wire or similar netting area only) Rate for hire and labour charges including carriage up to 4 days. |
| 74 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 75 | Table cover with plastic quoted paper. Rate for hire and labour charges including carriage up to 4 days. |
| 76 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 77 | Table cover with ordinary paper. Rate for hire and labour charges including carriage up to 4 days. |
| 78 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 79 | Table cover with table cloth. Rate for hire and labour charges including carriage up to 4 days. |
| 80 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 81 | Hire and labour charge or large size satranchi. Rate for hire and labour charges including carriage up to 4 days. |
| 82 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 83 | Hire and labour charge of tarpaulin. Rate for hire and labour charges including carriage up to 4 days. |
| 84 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 85 | Hire and labour charge of Hessian. Rate for hire and labour charges including carriage up to 4 days. |
| 86 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 87 | Hire and labour charge of polythin. Rate for hire and labour charges including carriage up to 4 days. |
| 88 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 89 | Hire and labour charge of jute mattres. Rate for hire and labour charges including carriage up to 4 days. |
| 90 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 91 | Hire and labour charge of carpet. Rate for hire and labour charges including carriage up to 4 days. |
| 92 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 93 | Hire and labour charge of strong wooden dias including frame work complete.a) With mattress. Rate for hire and labour charges including carriage up to 4 days. |
| 94 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 95 | Hire and labour charge of strong wooden dias including frame work complete.b) Without mattress. Rate for hire and labour charges including carriage up to 4 days. |
| 96 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 97 | Hire and labour charge of strong wooden steps. Rate for hire and labour charges including carriage up to 4 days. |
| 98 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 99 | Hire and labour charge of Chairs. a) Garden chair. Rate for hire and labour charges including carriage up to 4 days. |
| 100 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 101 | Hire and labour charge of Chairs. b) With or without handle Armed moulded chair. Rate for hire and labour charges including carriage up to 4 days. |
| 102 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 103 | Hire and labour charge of Chairs. c) Sofa set. Rate for hire and labour charges including carriage up to 4 days |
| 104 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 105 | Hire and labour charge of Chairs. d) Steel frame VIP chair. Rate for hire and labour charges including carriage up to 4 days |
| 106 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 107 | Hire and labour charge of table:- a) Dining table (8’ xl’ – 6” size) Rate for hire and labour charges including carriage up to 4 days |
| 108 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 109 | Hire and labour charge of table:-b) Table (6’ x 3’ size). Rate for hire and labour charges including carriage up to 4 days |
| 110 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 111 | Hire and labour charge of table:-c) Table (4’x3’ size) Rate for hire and labour charges including carriage up to 4 days |
| 112 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 113 | Hire and labour charge of table:-d) Centre table. Rate for hire and labour charges including carriage up to 4 days |
| 114 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 115 | Hire and labour charge of curtain. a) Velvet curtain. Rate for hire and labour charges including carriage up to 4 days |
| 116 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 117 | Hire and labour charge of curtain. b) Ordinary curtain. Rate for hire and labour charges including carriage up to 4 days |
| 118 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 119 | Hire and labour charges of collapsible gate including fitting fixing and making good damages after striking out the same complete. Rate for hire and labour charges including carriage up to 4 days |
| 120 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 121 | Hire and labour charges for erection of temporary urinal (4’x3’size) with strong bamboo structure including side cover with polythin sheet to all side of urinal including earth work & cutting drain etc. complete. Rate for hire and labour charges including carriage up to 4 days |
| 122 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 123 | Hire and labour charges for erection of temporary latrine (4’ X 3’ size) with strong bamboo structure including side cover with darma mat to all side provision of one door and poly sheet shed including wooden platform ,WC pan including excavation of trenches etc..complete. Rate for hire and labour charges including carriage up to 4 days |
| 124 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 125 | Hire and labour charges of ply wood display board including fitting fixing and painting complete.Rate for hire and labour charges including carriage up to 4 days. |
| 126 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 127 | Hire and labour charges of wooden planks to cover drain. Rate for hire and labour charges including carriage up to 4 days. |
| 128 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 129 | Labour charges of cutting drain etc. Rate for hire and labour charges including carriage up to 4 days. |
| 130 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 131 | Covering track (Punjab Body/Bangla Body) A. With bamboo and poly sheet cover with paton. Rate for hire and labour charges including carriage up to 4 days. |
| 132 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 133 | Covering track (Punjab Body/Bangla Body) B. Without poly sheet cover with paton. Rate for hire and labour charges including carriage up to 4 days. |
| 134 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 135 | Ordinary labour charges for other incidental work. |
| 136 | Hire and labour charges of nylon mosquito net including fitting fixing complete. Rate for hire and labour charges including carriage up to 4 days. |
| 137 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 138 | Hire and labour charges of large size Towel (White). Rate for hire and labour charges including carriage up to 4 days. |
| 139 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 140 | Hire charges of Bedding including Bed sheet, pillow, tosok, Mosquito net etc.Rate for hire and labour charges including carriage up to 4 days. |
| 141 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 142 | Hire charges of camp cot. Rate for hire and labour charges including carriage up to 4 days. |
| 143 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 144 | Hire and labour charges wooden rack for keeping EVM machine including supporting strong wooden frame work with wooden post/planks etc. complete. Rate for hire and labour charges including carriage up to 4 days. |
| 145 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 146 | Hire Charges of Use Me Dustbin. Rate for hire and labour charges including carriage up to 4 days. |
| 147 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 148 | Hire and labour charges for providing \\"Drop Gate\\" with 15 cm dia salbullah of length not less than 8 meter including hoisting and fitting fixing with bolts and nuts to vertical posts (100 mm dia : 2 nos on each flank embedded 750 mm below G.L) and providing counter load of concrete or stone or iron block at the fulcrum ,jute rope of necessary length etc complete including dismantling and removing the same. Rate for hire and labour charges including carriage up to 4 days. |
| 149 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 150 | Hire and Labour Charges for fixing wooden frame including fittings comlpete for instalation of metal detector |
| 151 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 152 | Hire and labour charges for providing \\" Double Drop Gate\\" with 15 cm dia salbullah/Bamboo including leaver weighing system of length not less than 8 meter including hoisting and fitting fixing with bolts and nuts to vertical posts (100 mm dia : 2 nos on each flank embedded 750 mm below G.L) and providing counter load of concrete or stone or iron block at the fulcrum ,jute rope of necessary length etc complete including dismantling and removing the same. Rate for hire and labour charges including carriage up to 4 days. |
| 153 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 154 | Hire and labour charges for providing \\" Box Gate\\" with 15 cm dia salbullah/Bamboo asper required height and length with side cloth cover including hoisting and fitting fixing with jute rope of necessary length etc complete including dismantling and removing the same. Rate for hire and labour charges including carriage up to 4 days. |
| 155 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 156 | Hire and labour charges for providing \\" L- shaped Gate\\" with 15 cm dia salbullah/Bamboo asper required height and length with side cloth cover including hoisting and fitting fixing with jute rope of necessary length etc complete including dismantling and removing the same. Rate for hire and labour charges including carriage up to 4 days. |
| 157 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 158 | Hire & labour charges for providing Tarpoline shade with cloth ceiling with side cover with strong salbullah/Bamboo above 5 mtr.height, for security purpose etc complete including dismantling and removing the same. Rate for hire and labour charges including carriage up to 4 days. |
| 159 | Rate for Hire charges only 0n material Beyond 4days Per Day |
| 160 | Hire & labour charges for providing or supplying and setting wooden low -hight bench ( 8'-0 long x 1'-6\\" wide) with strong wooden post etc complete including dismantling and removing the same. Rate for hire and labour charges including carriage up to 4 days. |
| 161 | Rate for Hire charges only 0n material Beyond 4days Per Day Please Enable Macros to View BoQ information |