| 1 | Carriage of Following line materials from ESC, Muzaffarnagar to work sites including safe loading and unloading at both ends as per site condition :- |
| 2 | 11 Mtr. PCC Pole |
| 3 | 13 Mtr. ST Pole |
| 4 | 33 KV Cross Arm |
| 5 | 33 KV Pin Insulator Polymeric |
| 6 | Earthing Complete |
| 7 | G.I. wire 8 SWG |
| 8 | 33 KV Disc insulator |
| 9 | 33 KV Disc Fitting |
| 10 | ACSR Dog Conductor. |
| 11 | M.S. angle 65x65x6mm |
| 12 | M.S. channel 100x50mm |
| 13 | 33 KV Stay road 20x1800 mm |
| 14 | Stay wire 7/8 swg |
| 15 | 33 KV Cable o/d/kit XLPE 3x300 sqmm |
| 16 | 33 KV XLPE cable 3x300 sqmm |
| 17 | 63 KV Transformer |
| 18 | Errection of PCC Pole 11 Mtr. long as per norms and fixing all accessoriess (Nuts, Bolts, Washer and Clamps will be provided by contractor) |
| 19 | Errection of PCC Pole 13 Mtr. long as per norms and fixing all accessoriess (Nuts, Bolts, Washer and Clamps will be provided by contractor) |
| 20 | Concreting of PCC pole including all work of excavation, cement concreet in size .60x.60x.30mm in ration 1:4:8 (Cement, sand, 40mm brick ballast) as per drg. Including. |
| 21 | Errection of earthing complete |
| 22 | Laying, lifting, sagging & binding of ACSR Dog conductor as per norms. |
| 23 | Fabrication of MS angle/channel |
| 24 | Errection of stay complete and Grouting of stay rods including all work of excavation, cement concreet in size .60x.60x.30mm in ration 1:4:8 (Cement, sand, 40mm brick ballast) as per drg. including back filling & proper ramming etc. with fixing tightening & nuzzling of stay set with the pole |
| 25 | Filling of 3x300 XLPE Cable O/D/Kit |
| 26 | Laying of 33 KVXLPE Cable 3x300 sqmm by tranchless method by horizontal boring at the depth of 1.6 to 2.0 mtr. below ground level in the hot mix road with HDPE Pipe 6\\" dia (HDPE pipe will be provided by contractor). |
| 27 | Laying of XLPE Cable 3x300 sqmm in air |
| 28 | Digging the old trench and tracing out the fault. Filling the tranch properly after repairing the fault. |
| 29 | Mounting of 63 KVA T/F on Double Pole and making Proper connection (Nut, Bolt, Clamps, Lugs will be provided by the contractor) |
| 30 | Gaurding work of Line |
| 31 | Dismentling of following materials and carriage to JE Store |
| 32 | ST Pole Scrap |
| 33 | 25 KVA T/F Please Enable Macros to View BoQ information |