|
| 1 | Supply of Decentralized material as per UPCL Norms. |
| 2 | E clamp for SP-55. |
| 3 | Holding clamp for SP-55 with nut and bolt. |
| 4 | Bracing clamp Top SP-55 with nut and bolt. |
| 5 | Bracing clamp Bottom SP-55 with nut and bolt. |
| 6 | X arm Calmp for ST pole SP-55 with nut and bolt. |
| 7 | Stay clamp for SP-55 with nut and bolt. |
| 8 | 33 KV F Clamp with nut and bolt for SP-55. |
| 9 | PG clamp for Dog Condcutor. |
| 10 | Stya Insulator. |
| 11 | Bolt and Nuts off size. |
| 12 | Earth clamp STP SP-33/55/72 pole with nut and bolt. |
| 13 | Following work as per UPCL norms & site requirement. |
| 14 | Fabrication of steel |
| 15 | Excavation of pit for stay set. |
| 16 | Erection of 33 KV stay set. |
| 17 | Grouting of stay set. |
| 18 | Excavation of pit for pole. |
| 19 | Erection of single SP-55 pole. |
| 20 | Erection of SP-55 dbouble pole. |
| 21 | Grouting of pole. |
| 22 | Muffing of pole. |
| 23 | Dismantling of SP-55 single pole. |
| 24 | Dismantling of SP-55 dbouble pole. |
| 25 | Painting of SP-55 pole. |
| 26 | Laying of Dog conductor in HT line. |
| 27 | Guarding of 33 KV line. |
| 28 | Lopping & Choping of tree branches. |
| 29 | Cartage SP-55 pole, 51-70 Km. |
| 30 | Cartage of petty material, 51-70 Km. |
| 31 | Cartage of 33/11 CT/PT/ Isolator, 51-70 Km. |
| 32 | Headload cartage of SP-55 pole, 0-1 Km. |
| 33 | Headload cartage of materila, 0-1 Km. |
| 34 | Dismantling of 33 KV line (Panther/ dog) |
| 35 | Straightening of tilted STP poles. |
| 36 | Resagging of 33 KV line. |
| 37 | Laying earth wire for earth on 33 KV line. |
| 38 | Re Erection of stay with Digging of pit. |
| 39 | Jumper section pole. |
| 40 | Grouting and muffing of poles. |
| 41 | Erection of outdoor/ Indoor CT. |
| 42 | Fixing and erection of 33 KV O/D PT. |
| 43 | Back carriage of scrap material. Please Enable Macros to View BoQ information |