|
| 1 | PART-A BRIDGE WORKEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Excluding GST |
| 2 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications 12.8 A case-II (. PCC M-15) Excluding GST |
| 3 | Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications. Excluding GST |
| 4 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 using batching plant transit mixer & manual placing.12.8G Case-II PCC M-20 in foundation Excluding GST |
| 5 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 using batching plant transit mixer & manual placing.12.8G Case-II PCC M-20 in Sub Structure Excluding GST |
| 6 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 using batching plant transit mixer & manual placing.12.8G Case-II RCC M-30 in foundation Excluding GST |
| 7 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 using batching plant transit mixer & manual placing.12.8G Case-II RCC M-30 in Sub Structure Excluding GST |
| 8 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 using batching plant transit mixer & manual placing.12.8G Case-II RCC M-30 in Supper Structure Excluding GST |
| 9 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 using batching plant transit mixer & manual placing.12.8G Case-II (RCC M-30 with Reinforcement) For Wearing coat Excluding GST |
| 10 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. (DSR) Excluding GST |
| 11 | Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications Excluding GST |
| 12 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 110 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications Excluding GST |
| 13 | Drainage Spouts complete as per drawing and Technical specification Excluding GST |
| 14 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Excluding GST |
| 15 | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.. Excluding GST |
| 16 | PART -B DIVERSION WORKEarth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the Engineer-in-Charge. (with compection). Excluding GST |
| 17 | Brick soling with straight over burnt brick laid on edge and dry brick edging on both side including preparation of subgrade to required camber and including supply of bricks, filling joints with local earth spreading a blind coat of 1cm(3/8\\") depth of local earth P.I. 5 to 7 or sand over the entire surface and including labour & T&P etc. required for proper completion of work. PWD Schedule SI-762(b) Excluding GST |
| 18 | Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe 1000 MM DIA on first class bedding of granular material in single row including fixing collar Complete for proper work as per direction of E/I. Excluding GST |
| 19 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3. (Diversion for Running water in Minor Cannel) Excluding GST |
| 20 | PART-C - APPROCH ROAD WORKEarth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the Engineer-in-Charge. (with compection) Excluding GST |
| 21 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. Excluding GST |
| 22 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. Excluding GST |
| 23 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. Excluding GST |
| 24 | Brick edging on both side of the road of First class bricks 8cm. (3\\") wide and 12cm (4½\\") deep laid with mud mortar including all labour and supply of brick finished to required template & ramming the excavated earth as directed by the Engineer-In-Charge.(SCH Pwd No.- 765) Excluding GST |
| 25 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 excluding GST. |
| 26 | Providing and applying tack coat with Bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. excluding GST. |
| 27 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a HMP, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. excluding GST.. |
| 28 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. excluding GST. |
| 29 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet)..(ch. 17. SI no. 692) Existing Dammaged Culvert Excluding GST 1- Cost of Maintenance of Road for Five Years will be paid as per E.N.C. Letter no.- 3689lh0-PRMC/ewy&23-24 Dt. 17.02.2024.)2-Maintenance cost includes All material, bitumen, labour and T&P etc.3-Payment of Maintenance shall be made as per final execution of civil work which may vary from the BOQ.4- The departmental road roller if spare, shall be made available to the contractor at site @ Rs. 1609.00 per Hour including POL charges, wages of driver and cleaner. If roller is kept idle due to non-availability of material or labour, recovery @ Rs. 12872.00 per day shall be made from contractor’s bill for idle period. Please Enable Macros to View BoQ information |