| 1 | Safe Carriage of Following Material From Store to Work Site Including Safe Loading & Un Loading at Both Ends |
| 2 | ACSR Dog Conductor |
| 3 | 33 KV Pin insulator polymeric |
| 4 | 11 KV Disc insulator with fitting |
| 5 | 11 KV Pin insulator with polymeric |
| 6 | 11 KV Disc insulator with fitting |
| 7 | PCC Pole 11 Mtr. long |
| 8 | 11 KV Fuse Set |
| 9 | 11 KV HT XLPE Cable size 3x185 sqmm |
| 10 | LT XLPE Cable Al. 1x240 sqmm |
| 11 | LT XLPE Cable Al. 1x400 sqmm |
| 12 | LT XLPE Cable Al. 1x1000 sqmm |
| 13 | 11 KV HT XLPE Cable J/K O/D 3x185 sqmm |
| 14 | LT PVC Cable 3.5x150/70 sqmm |
| 15 | LT ABC 3x120+1x95+1x16 sqmm |
| 16 | LT ABC 3x95+1x35+1x16 sqmm |
| 17 | Distribution box |
| 18 | Earthing Set Complete |
| 19 | MS Angle/channel |
| 20 | MS Top Chanel 125x65x2240 sqmm |
| 21 | MS Top Channel 100x50x2400 mm long |
| 22 | MS Droper Channel 100x50x2028 sqmm |
| 23 | MS Droper Channel 100x50x3200 sqmm |
| 24 | Stay Set Complete |
| 25 | 11 KV X-Arm V-Type |
| 26 | MS angle 75x75x6x2028 mm |
| 27 | MS Channel 125x65x1300 mm (T-Off) |
| 28 | 11 KV TPMO |
| 29 | Errection of PCC Pole 11 Mtr. Long as per respo norms and fixing all accessories (All Decentralised materials will be provided by contractor) |
| 30 | Errection of double Pole structure as per norms and fixing all accessories (All Decentralised materials will be provided by contractor) |
| 31 | Errection of four Pole structure as per norms and fixing all accessories (All Decentralised materials will be provided by contractor) |
| 32 | Providng and fixing of Number Plate with clamp and nut & bolts |
| 33 | Providng and fixing of Danger board barbed wire including jumper |
| 34 | Providing and fixing of Barbed wire |
| 35 | Providing and fixing of Al. Binding wire |
| 36 | Providing and fixing of 11 KV E Bracket |
| 37 | Providing and fixing of bracking set 4.3x4.3 mtr. Angle iron 65x65x6mm with holding clamp. |
| 38 | Providing and fixing of PRC electrical connector. |
| 39 | Laying of ACSR Dog conductor as per norms |
| 40 | Filling of 11 KV 3x185 XLPE cable box outdoor/indoor |
| 41 | Laying of LT XLPE Cable Al. 1x240 sqmm |
| 42 | Laying of LT XLPE Cable Al. 1x400 sqmm |
| 43 | Laying of LT XLPE Cable Al. 1x1000 sqmm |
| 44 | Laying of LT PVC Cable 3.5x150/70 sqmm |
| 45 | Laying of LT ABC 3x120+1x95+1x16 sqmm |
| 46 | Laying of LT ABC 3x95+1x35+1x16 sqmm |
| 47 | Fixing of LT Distribution Box and makting connection properly |
| 48 | Erection of earthing complete. |
| 49 | Errection of stay complete and Grouting of stay rods including all work of excavation, cement concreet in size .60x.60x.30mm in ration 1:4:8 (Cement, sand, 40mm brick ballast) as per drg. including back filling & proper ramming etc. with fixing tightening & nuzzling of stay set with the pole. |
| 50 | Erection of 11 KV Fuse set and proper connection |
| 51 | Fabrication on MS angle/channel |
| 52 | Drilling of DIA 160 mm in two Paraller of bores by tranchless method by horizontal boring at the depth of 1.6 to 2.0 mtr. below ground level in the hot mix road wht HDPE Pipe 6\\" dia (HDPE pipe will be provided by contractor). |
| 53 | Laying of 11 KV 3x185 sqmm cable through HDPE pipe. |
| 54 | Laying & pulling of of 11 KV 3x185 sqmm XLPE cable on kacha road with help of brick and send. |
| 55 | Providing & fixing G.I. pipe 6\\" Dia as per norms |
| 56 | Providing & fixing G.I. pipe 150 mm Dia as per norms |
| 57 | Installation of 11 KV TPMO with providing holding clamps 120 nos. for top channel, TPMO & Fuse set |
| 58 | Providing of Red Oxide paint and painting the pole |
| 59 | Providing of Alluminium paint and painting the pole |
| 60 | Providing LT Incoming panel with metering wquipment, fuse & fixing arrangement for 100 KVA Transformer as per norms. |
| 61 | Providing LT Incoming panel with metering wquipment, fuse & fixing arrangement for 250 KVA Transformer as per norms. |
| 62 | Providing LT Incoming panel with metering wquipment, fuse & fixing arrangement for 400 KVA Transformer as per norms. |
| 63 | Providing LT Incoming panel with metering wquipment, fuse & fixing arrangement for 1000 KVA Transformer as per norms. |
| 64 | Providing and installation of 4 Core LT MCB with Box for 250 KVA T/F |
| 65 | Providing and installation of 4 Core LT MCB with Box for 400 KVA T/F |
| 66 | Providing and installation of 4 Core LT MCB with Box for 1000 KVA T/F |
| 67 | Providing and fixing of Copper L-pices 50x250x10 mm |
| 68 | Providing and fixing of Copper L-pices 62x225x12 mm |
| 69 | Providing and fixing of Al. Leg long barred off size |
| 70 | Dismentling work of 100 KVA transformer and Shifting to new site with safely carriage with loading & unloading both side. |
| 71 | Dismentling work of 250 KVA transformer and Shifting to new site with safely carriage with loading & unloading both side. |
| 72 | Dismentling work of 400 KVA transformer and Shifting to new site with safely carriage with loading & unloading both side. |
| 73 | Dismentling work of 1000 KVA transformer and Shifting to new site with safely carriage with loading & unloading both side. |
| 74 | Mounting of 100 KVA T/F on Double Pole and making Proper connection (Nut, Bolt, Clamps, Lugs will be provided by the contractor) |
| 75 | Mounting of 250 KVA T/F on plinth and making Proper connection (Nut, Bolt, Clamps, Lugs will be provided by the contractor) |
| 76 | Mounting of 400 KVA T/F on plinth and making Proper connection (Nut, Bolt, Clamps, Lugs will be provided by the contractor) |
| 77 | Mounting of 1000 KVA T/F on plinth and making Proper connection (Nut, Bolt, Clamps, Lugs will be provided by the contractor) |
| 78 | Grouting of Pole with cements, sand, brick, CC Rato 1:4:5 as per norms (all material provided by the contractor) |
| 79 | Providing and erection of water level earthing for Transformer body as per RESPO norms. |
| 80 | Providing and erection of water level earthing for Transformer Neutral as per RESPO norms. |
| 81 | Making of Plinth of size 2x2x1.5 mtr. Each plinth making with below materials -1) Cement - 14 Bag2) Fine sand - 3 Cu. Mtr.3) Coarse sand - 1.2 Cu. Mtr.4) Brick Ballast - 0.45 Ct.Mtr.5) Ist Class bricks - 6 No.6) Stone Ballast (40MM)- 0.4 Cu.Mtr.7) MS Channel 125x65mm - 48 Kg.8) Ms Twisted bar of size 20 mm - 40 Kg.All materials will be provided by contractor. |
| 82 | Making of Fancing for 250/400/1000 KVA transformer as per norms (each fancing waight approx. 250 Kg. and painting with paint. All material will be provided by contractor) |
| 83 | Dismentling of MS iron scrape, pole and etc and safely Carriage of Material From site to JE store/store center Muzaffarnagar. Please Enable Macros to View BoQ information |