| 1 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 2 | Providing concrete for plain/reinforced concrete PCC (1:1.5:3) Grade M10 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 3 | Plain/reinforced cement concrete RCC grade M20 in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 4 | Plain/reinforced cement concrete RCC M25 in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 5 | Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 6 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Fine Sand. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 7 | Drainage spouts complete as per drawing and technical specifications Clause 1209. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 8 | P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 9 | Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 10 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Clause 800 and 1206.3 Sr No. 13.5 Ref No. 800. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 11 | Construction of granular sub-base (GSB) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density. Sr No. 4.1 Ref No. 401. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 12 | Providing, laying, spreading and compacting stone aggregates of 45-63 mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.Sr No. 4.8 Ref No. 405/2. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 13 | Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.Sr No. 4.8 Ref No. 405/2. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 14 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.65 kg/sqm using mechanical means as per Technical Specification Clause 502 Sr No. 5.1 Ref No. 502. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 15 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Sr No. 5.2 Ref No. 503. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 16 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade (VG-10 Bitumen @ 1.46kg / Sqm to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.Sr no. 5.9 Ref No. 508. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 17 | Providing and laying seal coat by manual means with VG-10 Grade Bitumen@ 0.65kg/Sqm sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 .Sr no. 5.12 Ref No. 510. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 18 | Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 19 | Providing and laying boulders apron laid in wire creates with 4mm dia GI wire confirming to IS: 280 andand IS 4826 in 100mm x 100mm mesh (woven diagonally) including 10 percent extra for Laps and joints laid with stone boulders weighing not less than 25kg each as per drawing and Technical specification Clause 1301. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 20 | Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 21 | Supply and fixing of 1000 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. . Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 22 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Carted EW. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 23 | Brick on edge pavement with straight over burnt brick on parties with bricks, laid dry joints filled with fine sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8\\") depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as perdirection of E/I & SOR 5.03. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 24 | Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. As per MORT&H Specification cluase 2.4(ix) C . Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. Please Enable Macros to View BoQ information |